| S No |
Project |
Capacity (MW) |
River |
Lic No |
Isuue Date |
Validity |
Promoter |
Address |
Latitiude N |
Longitude E |
VDC/District |
Remarks |
|---|
| 1 |
Upper Puwa |
2.000 |
puwa | |
|
|
Powergen Company |
Koteshwor KTM | 26o 58' 47" | 26o 59' 47" | 87o 53' 35" | 87o 54' 34" | Sakhejung (Ilam) | GON Basket |
| 2 |
Sirshe Gad |
0.900 |
Sirsegad | |
2057-01-26 |
|
Manasarower Powers Pvt. Ltd. |
| 00o 00' 00" | 00o 00' 00" | 00o 00' 00" | 00o 00' 00" | (Dadeldhura) | |
| 3 |
Jurimba Khola |
0.995 |
Jurimba | |
2057-12-21 |
|
Hulas Steel Industries Pvt. Ltd. |
| 00o 00' 00" | 00o 00' 00" | 00o 00' 00" | 00o 00' 00" | (Sindhupalchok) | |
| 4 |
Lower Balephi |
4.990 |
Balephi | 058/59 BUS 106 |
2058-12-05 |
0000-00-00 |
Welcome Energy Development Co Pvt Ltd |
| 27o 46' 15" | 27o 48' 45" | 85o 45' 30" | 85o 46' 30" | Fulpingkot,Fupingdandagau,Batase,Jalbire,Kubhinde (Sindhupalchok) | |
| 5 |
Bhotekoshi - 5 |
46.000 |
Bhote Koshi | 111 |
2059-01-06 |
2062-10-29 |
Kalika Construction P. Ltd. |
| 27o 45' 33" | 27o 50' 00" | 85o 50' 00" | 85o 55' 00" | (Sindhupalchok) | |
| 6 |
Sanjen |
25.000 |
Sanjen | 115 |
2059-05-05 |
2062-02-32 |
Chilime Hydropower Co.Ltd |
| 28o 11' 00" | 28o 15' 00" | 85o 16' 30" | 85o 18' 15" | (Rasuwa) | |
| 7 |
Upper Mai Khola |
9.980 |
Mai | 125 |
2060-01-30 |
2065-01-29 |
East Nepal Development Endeavour Pvt. Ltd |
| 27o 01' 22" | 27o 03' 30" | 87o 56' 30" | 87o 58' 00" | Maimajhuwa,Mabu,Sulubung (Ilam) | |
| 8 |
Kahule Khola |
1.500 |
Kahule | 127 |
2060-02-05 |
2062-04-32 |
B.P.Power Co.Pvt.Ltd |
| 27o 52' 27" | 27o 52' 42" | 85o 52' 36" | 85o 53' 15" | (Sindhupalchok) | |
| 9 |
Karuwa |
6.000 |
Seti | 129 |
2060-03-13 |
2063-05-12 |
Jhyamolongma Hydro Power Development Co(P) Ltd |
| 28o 22' 30" | 28o 24' 30" | 83o 57' 00" | 83o 59' 30" | (Kaski) | |
| 10 |
Liping Khola |
1.500 |
Liping | 130 |
2060-03-32 |
2065-03-31 |
Blue Run Energy Pvt. Ltd. |
| 27o 58' 07" | 27o 59' 15" | 85o 56' 30" | 85o 57' 40" | Tatopani (Sindhupalchok) | |
| 11 |
Phawa Khola HPP |
2.300 |
Phawa | 142 |
2060-12-13 |
2065-05-23 |
Shivani Hydropower Company Pvt Ltd |
| 27o 16' 37" | 27o 19' 03" | 87o 45' 27" | 87o 46' 22" | (Taplejung) | |
| 12 |
Indrawati Khola-1 |
4.900 |
Indrawati | 150 |
2061-05-08 |
2066-05-07 |
Hydropower Research Pvt.Ltd. |
New Baneswor Kathmandu, Phone 014460777 | 27o 54' 47" | 27o 56' 25" | 85o 37' 44" | 85o 38' 57" | Baruwa,Thampal Dhap (Sindhupalchok) | |
| 13 |
Upper Daram Khola-B |
5.650 |
Daram | 153 |
2061-05-10 |
2066-05-09 |
Galkot Hydropower Pvt.Ltd |
| 28o 11' 57" | 28o 13' 03" | 83o 22' 45" | 83o 25' 25" | (Baglung) | |
| 14 |
Middle Balephi |
10.000 |
Balephi | 152 |
2061-06-06 |
2066-05-23 |
Middle Balephi Hydropower P.Ltd. |
| 27o 49' 30" | 27o 50' 48" | 85o 45' 30" | 85o 46' 30" | (Sindhupalchok) | GON Basket |
| 15 |
Bhim khola |
7.200 |
Bhim | 149 |
2061-06-12 |
2066-05-23 |
Butwal Power Company |
| 28o 15' 28" | 28o 17' 30" | 83o 11' 42" | 83o 13' 16" | (Baglung) | |
| 16 |
Hewa Khola |
2.400 |
Hewa | 156 |
2061-06-19 |
2065-03-32 |
Barun Hydropower Development Company Pvt Ltd |
| 27o 19' 05" | 27o 21' 04" | 87o 19' 00" | 87o 22' 46" | (Sankhuwasabha) | |
| 17 |
Andhi Khola |
9.400 |
Andhi Khola | 159 |
2061-06-26 |
2061-08-25 |
Butwal Power Company Limited |
| 27o 55' 34" | 27o 57' 02" | 83o 40' 37" | 83o 41' 06" | (Syangja) | |
| 18 |
Lower Molung Khola |
4.950 |
Molun | 160 |
2061-07-02 |
2065-05-23 |
Shivduti Power Company Pvt Ltd |
| 27o 10' 40" | 27o 14' 00" | 86o 22' 39" | 86o 24' 39" | Sisneri,Thoksela (Okhaldhunga) | |
| 19 |
Khudi Beni |
2.000 |
Khudi | 162 |
2061-09-16 |
2066-05-23 |
Multi model builders and Engineering Pvt. Ltd. |
| 28o 16' 16" | 28o 16' 58" | 84o 21' 00" | 84o 21' 50" | (Lamjung) | |
| 20 |
Namrjun Madi |
11.500 |
Madi | 163 |
2061-09-29 |
2065-09-26 |
Himalayan Hydropower Pvt.Ltd |
| 28o 16' 01" | 28o 17' 43" | 84o 05' 00" | 84o 06' 28" | (Kaski) | |
| 21 |
Upper Roshi Khola-III |
4.800 |
Roshi | 165 |
2061-11-13 |
2066-05-23 |
Shree Manakamana Power Company Pvt. Ltd |
| 27o 31' 12" | 27o 32' 22" | 85o 34' 15" | 85o 35' 57" | (Kabhrepalanchok) | |
| 22 |
Upper Madi |
20.000 |
Madi | 167 |
2061-11-20 |
2066-05-23 |
Madi Power P. Ltd |
POB 5152, Sinamangal, Kathmandu | 28o 15' 30" | 28o 19' 00" | 84o 04' 00" | 84o 07' 00" | (Kaski) | |
| 23 |
Seti- Trishuli |
142.000 |
Seti | 168 |
2061-11-24 |
2062-11-23 |
Nepal Electricity Authority |
| 27o 48' 55" | 27o 58' 30" | 84o 16' 25" | 84o 28' 35" | (Tanahu) | |
| 24 |
Upper Seti (Storage) |
127.000 |
Seti | 169 |
2061-11-24 |
2066-11-23 |
Nepal Electricity Authority |
| 27o 55' 00" | 28o 20' 30" | 84o 02' 30" | 84o 17' 30" | (Tanahu) | |
| 25 |
Uttar Ganga |
300.000 |
Uttar Ganga | 170 |
2061-12-28 |
2062-12-27 |
Nepal Electricity Authority |
| 28o 23' 02" | 28o 30' 12" | 82o 56' 16" | 83o 02' 06" | (Baglung) | |
| 26 |
Nalsyagu Gad |
400.000 |
Nalsyagu Gad | 171 |
2061-12-28 |
2065-05-23 |
Nepal Electricity Authority |
| 28o 47' 28" | 28o 54' 15" | 82o 17' 15" | 82o 17' 55" | (Jajarkot) | |
| 27 |
Sanjen (Upper) |
11.000 |
Sanjen | 174 |
2061-12-31 |
2065-05-23 |
Chilime Hydropower Company |
Kalikasthan, Kathmandu, Ph:4417434 Fax:4443076 | 28o 13' 00" | 28o 15' 00" | 85o 16' 30" | 85o 18' 15" | Chilime (Rasuwa) | |
| 28 |
Chaurikhola Small |
3.744 |
Chaurikhola | 180 |
2062-02-12 |
2065-05-23 |
Tipling Hydropower Pvt.Ltd |
Thamel, Kathmandu, Nepal, POB 8461 Phone:4424147, 4231458 | 27o 30' 29" | 27o 31' 47" | 85o 48' 38" | 85o 49' 27" | (Ramechhap) | |
| 29 |
Kiche Khola |
0.500 |
Kichhe | |
2062-04-05 |
|
Annapurna Renewable Energy P. Ltd |
| 28o 19' 04" | 28o 19' 34" | 84o 18' 20" | 84o 19' 04" | (Lamjung) | |
| 30 |
Mahesh Khola |
1.500 |
Mahesh | 184 |
2062-04-24 |
2063-04-23 |
Hydro Resources Developers, P. Ltd |
| 27o 46' 28" | 27o 48' 26" | 85o 00' 00" | 85o 02' 00" | (Dhading) | |
| 31 |
Dudhkhola Small |
10.000 |
Dudhkhola | 183 |
2062-04-27 |
2066-05-23 |
Shwet Bhairab Power Supply P. LTD |
Ph4425793, POB5585 | 28o 31' 16" | 28o 33' 17" | 84o 21' 27" | 85o 23' 49" | (Manang) | |
| 32 |
Begnas - Rupa pump storage |
9.000 |
Begnas - Rupa | 190 |
2062-08-02 |
2064-02-01 |
Butwal Power Company |
| 28o 08' 35" | 28o 11' 30" | 84o 05' 20" | 84o 07' 30" | (Kaski) | |
| 33 |
Serpu Daha - Sani Bheri Nadi (PS) |
30.100 |
Sani Bheri | 203 |
2062-10-27 |
2064-04-26 |
Butwal Power Company |
| 28o 40' 00" | 28o 42' 30" | 82o 28' 24" | 82o 30' 00" | (Rukum) | |
| 34 |
Upper Mardi Small |
1.900 |
Mardi | 206 |
2062-12-02 |
2064-12-01 |
R. B. Hydropower |
Pokhara, Kaski, Nepal. Ph:061-520774, Fax: 061-528346 | 28o 22' 15" | 28o 24' 00" | 83o 52' 45" | 83o 53' 35" | (Kaski) | |
| 35 |
Budhi Gandaki (ROR) |
96.000 |
Budhi Gandaki | 212 |
2063-02-02 |
2067-02-01 |
Pashupati Engineering Power Company Pvt. Ltd |
Ph 01-4361916 | 28o 17' 00" | 28o 24' 00" | 84o 51' 58" | 84o 56' 18" | (Gorkha) | |
| 36 |
Upper Tamakoshi |
309.000 |
Tama Koshi | 214 |
2063-02-28 |
2064-08-27 |
Nepal Electricity Authority |
| 27o 49' 00" | 27o 58' 00" | 86o 10' 00" | 86o 16' 00" | Lamabagar (Dolakha) | |
| 37 |
Thapa Khola |
2.340 |
Sun Koshi | |
2063-03-12 |
2064-09-11 |
Muktinath Hydropower P. Ltd. |
| 28o 42' 00" | 28o 45' 00" | 83o 36' 15" | 83o 39' 25" | (Mustang ) | |
| 38 |
Lower Khorunga |
2.000 |
Khoranga | 222 |
2063-03-12 |
2065-03-11 |
ShivShakti Hydropower Company Pvt. Ltd. |
| 27o 07' 30" | 27o 08' 23" | 87o 32' 30" | 87o 34' 32" | (Terhathum) | |
| 39 |
Hugdi |
3.600 |
Hugdi | 230 |
2063-03-26 |
2065-09-25 |
Shankar Pandey |
Pokhara - 9, Kaski, Nepal | 28o 03' 16" | 28o 05' 00" | 83o 20' 55" | 83o 23' 21" | (Gulmi) | GON Basket |
| 40 |
Jhyaku Khola |
2.240 |
Jhyaku | 241 |
2063-07-01 |
2064-12-31 |
Kalinchowk Hydropower Company |
Mandikatar, Kathmandu, Nepal. Ph: 4374729, Fax: 4374830 | 27o 41' 30" | 27o 43' 30" | 86o 09' 00" | 86o 11' 40" | (Dolakha) | |
| 41 |
Kiche Khola |
1.200 |
Kichhe | 249 |
2063-08-08 |
2065-01-07 |
Annapurna Renewable Energy P. Ltd |
P.O. Box: 7657,Banasthali, Kathmandu, Nepal. Ph: 4425576 | 28o 18' 50" | 28o 19' 34" | 84o 18' 20" | 84o 20' 11" | (Lamjung) | |
| 42 |
Seti Nadi |
58.000 |
west Seti | 260 |
2063-09-14 |
2065-09-13 |
Pioneer Genco Limited Associates |
Hyderabad India | 29o 37' 00" | 29o 45' 00" | 81o 15' 00" | 82o 23' 00" | (Bajhang) | |
| 43 |
Dudh Koshi Nadi |
164.770 |
Dudh Koshi | 261 |
2063-09-14 |
2065-09-13 |
Navayuga Engg. Co. Ltd. Associates |
Hyderabad India | 27o 15' 00" | 27o 17' 00" | 86o 37' 00" | 86o 46' 00" | (Okhaldhunga) | |
| 44 |
Upper Chepe Khola |
4.000 |
Chepe | 266 |
2063-10-26 |
2065-04-02 |
Netraraj Tripathi |
P.O. Box: 12566, Ph: 9841271756 | 28o 10' 39" | 28o 13' 00" | 84o 37' 26" | 84o 39' 05" | (Lamjung) | |
| 45 |
Tamakoshi-2 TA-2 |
207.000 |
Tama Koshi | 272 |
2063-11-21 |
2065-11-20 |
S. N. Power Holding Singapur P. Ltd. |
| 27o 29' 34" | 27o 34' 36" | 86o 05' 00" | 86o 07' 09" | (Dolakha) | |
| 46 |
Devighat Cascade |
10.200 |
Trishuli | 271 |
2063-11-27 |
2064-11-26 |
Devighat Hydropower P. Ltd. |
| 27o 51' 08" | 27o 53' 17" | 85o 05' 48" | 85o 08' 16" | (Nuwakot) | |
| 47 |
Upper Leguwa |
0.500 |
Leguwa | |
2064-04-13 |
|
Balaram Raya and Bijaya Laxmi Subedi |
Marek Katahare VDC -4, Dhankutta and Sabla VDC-6, Terhthum | 27o 09' 28" | 27o 10' 16" | 87o 22' 04" | 87o 23' 36" | (Dhankuta) | |
| 48 |
Likhu Khola |
7.000 |
Likhu | 286 |
2064-08-21 |
2067-08-20 |
Panch Pokhari Hydropower |
| 27o 31' 18" | 27o 32' 02" | 86o 21' 05" | 86o 21' 41" | (Ramechhap) | GON Basket |
| 49 |
Lohare Khola |
2.500 |
Lohore | 290 |
2064-08-27 |
2065-08-26 |
Ganesh Bahadur Khadka |
Narayan Munipacility-7, Dailekh, Nepal. Ph: 5546898 | 28o 53' 43" | 28o 54' 47" | 81o 47' 16" | 81o 49' 08" | (Dailekh) | |
| 50 |
Upper Maiwa Khola |
10.000 |
Maiwa | 303 |
2064-11-12 |
2067-11-12 |
Gaurav Bhattarai |
New Baneswor, Kathamandu 10, Nepal. 9841253698 | 27o 22' 21" | 27o 25' 00" | 87o 31' 13" | 87o 33' 30" | (Taplejung) | |
| 51 |
Upper Dudh Khola |
9.650 |
Dudhkhola | 306 |
2064-11-26 |
2066-11-25 |
Marsyangdi Group Pvt. Ltd |
P. O. Box 2430 P.No. 015525574 | 28o 33' 17" | 28o 35' 45" | 84o 23' 00" | 84o 25' 45" | (Manang) | GON Basket |
| 52 |
Bimdang Khola |
6.850 |
Bimdang | 308 |
2064-11-26 |
2065-11-25 |
Marsyangdi Group Pvt. Ltd |
P. O. Box 2430 P.No. 015525576 | 28o 33' 17" | 28o 38' 00" | 84o 25' 45" | 84o 28' 00" | (Manang) | |
| 53 |
Thuli Gad B |
4.800 |
Thuligad | |
2065-01-17 |
2066-01-16 |
Keshav Raj Kadel |
Maitidevi Kathmandu, P.O.Box 19127, Phone - 9851025258 | 29o 18' 00" | 29o 19' 25" | 80o 26' 50" | 80o 29' 00" | (Dadeldhura) | |
| 54 |
Thuli Gad A |
3.988 |
Thuligad | |
2065-01-18 |
2066-01-17 |
Ujjwol Raj Kadel |
Kathmandu, P.O.Box 19127, Phone - 9851074543 | 29o 19' 45" | 29o 20' 45" | 80o 24' 45" | 80o 27' 10" | (Dadeldhura) | |
| 55 |
Charnawati |
1.530 |
Charnawati | |
2065-01-20 |
2066-01-19 |
Nepal Hydropower Developer Pvt. Ltd |
Baneswor Kathmandu | 27o 37' 50" | 27o 39' 17" | 86o 01' 11" | 86o 02' 30" | (Dolakha) | |
| 56 |
Chepe Khola |
3.500 |
Chepe | |
2065-01-24 |
2066-01-23 |
Amar Gurung |
| 28o 08' 49" | 28o 10' 25" | 84o 35' 27" | 84o 37' 15" | (Lamjung) | |
| 57 |
Langdi Khola |
1.500 |
Langdi | |
2065-02-02 |
2066-02-01 |
Tirth Raj Panthi |
9841694863 | 28o 10' 28" | 28o 11' 54" | 84o 35' 00" | 84o 36' 41" | (Lamjung) | |
| 58 |
Tadi Ghyamphedi |
2.500 |
Tadi | |
2065-02-09 |
2066-02-08 |
H.P. Agrawal Group of Companies |
P.O. Box 8033, Phone No 01-4273401, Kathmandu Nepal | 27o 59' 03" | 28o 00' 40" | 85o 26' 36" | 85o 27' 51" | (Nuwakot) | |
| 59 |
Upper Balephi |
15.000 |
Balephi | 356 |
2065-03-02 |
2067-03-01 |
Samjhana Acharya |
Pawan Nagar - 8 Dang | 27o 58' 59" | 28o 01' 23" | 85o 46' 46" | 85o 48' 03" | (Sindhupalchok) | |
| 60 |
Chyadu Khola |
2.000 |
Chyadu | |
2065-03-20 |
2066-03-19 |
Mahabharat Khadka |
Ladukh-5, Dolakha, Phone 9851108281 | 27o 56' 10" | 27o 57' 47" | 86o 11' 11" | 86o 12' 27" | (Dolakha) | |
| 61 |
Thosne Khola |
1.000 |
Thosne | |
2065-03-26 |
|
Pashupati Energy Development Co. P. Ltd |
Baluwatar, Kathmandu P.O. Box: 2975 EPC 5602 Ph: 4426865 | 27o 29' 26" | 27o 30' 10" | 85o 18' 11" | 85o 18' 44" | (Lalitpur) | |
| 62 |
Badigad |
7.000 |
Badigad | 382 |
2065-04-28 |
2067-04-27 |
Gajadhar Sapkota, Bhusan Guragai |
P.O.Box- 14165, Kathmandu, Phone 01-4496456, 01-4219563 | 28o 11' 48" | 28o 13' 34" | 83o 13' 37" | 83o 17' 01" | (Gulmi) | GON Basket |
| 63 |
Machha Khola |
4.900 |
Machha | |
2065-05-13 |
2066-05-12 |
Jwala Hydropower Co. P. Ltd. |
19/138 Tangal Tole, Lalitpur, Ph 5536983 | 28o 12' 19" | 28o 14' 03" | 84o 49' 30" | 84o 52' 36" | (Gorkha) | |
| 64 |
Upper Seti |
80.000 |
West Seti | 414 |
2065-06-15 |
2066-06-14 |
Him Urja P Ltd |
Triveni Compex Fifth Floor Putali Sadak, Kathmandu, P.O.Box 772, Phone 01-4228623 | 29o 45' 00" | 29o 50' 00" | 81o 15' 13" | 81o 18' 27" | Kanda (Bajhang) | |
| 65 |
Dudh Koshi -V |
48.000 |
Dudh Koshi | 415 |
2065-06-15 |
2066-06-14 |
Cepad Consultants P Ltd |
Pardi Pokhara, P.O.Box 220, Phone 061-533429 | 27o 30' 50" | 27o 34' 35" | 86o 40' 00" | 86o 43' 00" | Takasindu,Jubing,Baku,Basa (Solukhumbu) | |
| 66 |
Marsyangdi-7 |
50.000 |
Marsyangdi | 441 |
2065-08-10 |
2066-08-09 |
Chandan Engineering Pvt. Ltd. (Shiva Shanker Lal Rajbhandari) |
P O Box 2142 | 28o 32' 33" | 28o 36' 21" | 84o 10' 26" | 84o 16' 00" | ,Pisng,Chame (Manang) | |
| 67 |
Chameliya |
34.250 |
Chameliya | 459 |
2065-09-20 |
2066-09-19 |
Hydrotech Energy Development P Ltd |
Kathmandu,P.O.Box. 886, Phone 01-4377081, 9851030353 | 29o 51' 30" | 29o 54' 30" | 80o 53' 43" | 80o 57' 30" | (Darchula) | |
| 68 |
Lahpa Khola |
5.000 |
Lahpa | 463 |
2065-09-25 |
2066-09-24 |
Lapa Hydropower Company |
Kathmandu, Phone 9851049190 | 28o 09' 55" | 28o 11' 28" | 85o 01' 05" | 85o 03' 02" | (Dhading) | GON Basket |
| 69 |
Mai Khola A 1 |
1.250 |
Mai Khola | 065/66 BUS 480 |
2065-11-05 |
2066-11-04 |
Upper Mai Hydro Developmnet Company |
GPO box: 24194, Kathmandu | 27o 03' 55" | 27o 04' 48" | 87o 57' 48" | 88o 00' 00" | Mabu,Maimajhuwa (Ilam) | GON Basket |
| 70 |
Sapsu Khola |
2.780 |
Sapsu | 065/66 BUS 476 |
2065-11-21 |
2066-11-20 |
Shambhu P Ghimire |
476/32 Sahabhagita Marg, Baneswor, Kathmandu | 27o 08' 35" | 27o 09' 40" | 86o 45' 15" | 86o 48' 20" | (Khotang) | |
| 71 |
Lower Burbangkhola |
20.000 |
Burbang | 065/66 BUS 486 |
2065-12-17 |
2066-12-16 |
EyeBramha Hydropower P. Ltd |
Sinamangal, Kathmandu, Nepal | 28o 52' 50" | 28o 54' 50" | 83o 02' 45" | 83o 06' 45" | (Dolpa) | |
| 72 |
Burbangkhola |
15.000 |
Burbang | 065/66 BUS 487 |
2065-12-17 |
2066-12-16 |
Kuber Hydropower P. Ltd. |
Kathmandu | 28o 52' 09" | 28o 53' 30" | 83o 06' 45" | 83o 10' 10" | (Dolpa) | |
| 73 |
Tila-3 Hydropower Project |
194.560 |
Tila | 065/66 BUS 494 |
2065-12-20 |
2067-12-19 |
S C Power Company Pvt Ltd |
PO Box 23704, Kathamdu | 29o 06' 00" | 29o 10' 00" | 81o 45' 55" | 81o 52' 00" | Chhapre,Pakha (Kalikot) | |
| 74 |
Upper Rigdi Khola |
4.000 |
Rigdi | 065/66 BUS 502 |
2066-01-30 |
2067-01-29 |
Chitawan Power Company Pvt. Ltd. |
Khumaltar Height, Lalitpur | 27o 47' 30" | 27o 48' 38" | 84o 31' 33" | 84o 34' 06" | Dahakhani,Chandi Bhanjyang (Chitawan) | GON Basket |
| 75 |
Upper Syange |
2.400 |
Syange | |
2066-04-18 |
0000-00-00 |
Upper Syange Hydropower P. Ltd. |
Samakhusi, KTM, P.O. Box: 8975 EPC 5042, Tel: 4355416, Fax: 4354186 | 28o 22' 48" | 28o 23' 59" | 84o 22' 20" | 84o 24' 00" | (Lamjung) | |