S No | Project | Voltage (kV) |
Line Length (km) | Capacity (MW) | Appn No | Appn Date | Promoter |
Address | Start Point |
End Point |
Remarks |
---|---|---|---|---|---|---|---|---|---|---|---|
1 | Upper Karnali Hydroelectric Project 400 kV Transmission Line | 400 | 900 | 6091 | 2072-03-20 | Karnali Transmission Company Pvt. Ltd. | Chakupat-10, Lalitpur, P.O. Box: 148, Tel: 5540718, Fax: 5540659 | Bhairabsthan, Accham | Brahmadev, Kanchanpur | Survey Lic No: 119 Date: 2067-03-23 | |
2 | Upper Marsyangdi-2 Hydroelectric Project 400 kV Transmission Line | 400 | 600 | 6093 | 2072-03-21 | Marsyangdi Transmission Company Pvt Ltd | Chakupat-10, Lalitpur, P.O. Box: 148, Tel: 5540718, Fax: 5540660 | Taghring, Lamjung | Bodabar, Rupandehi | Survey Lic No: 120 Date: 2067-03-23 | |
3 | Super Trishuli HP 220kV TR Line | 220 | 30 | 100 | 1538 | 2076-05-20 | Blue Energy P Ltd | Darbar Marg Kathmandu, POB 9609, Ph 4233516 | Switchyard | Bharatpur substation | Survey Lic No: 209 Date: 2071-05-26 Er.Vijay |
4 | Bhaktpur-Thimi 132 kV Under Ground Transmission Line Project | 132 | 3.4 | 280 | 8876 | 2079-03-12 | Nepal Electricity Authority | Main office, Darbarmarg, Kathmandu | Bhaktpur 132kV Substation | Proposed Thimi Substation | Survey Lic No: 405 Date: 2076-03-20 |
5 | Rasuwa Bhotekoshi HEP TL survey Project | 220 | 3.8 | 120 | 793 | 2079-04-29 | Langtang Bhotekoshi Hydropower Company Pvt. Ltd. | 01-4440706 | Respective Switchyard of the project at | Chilime Hub at Chilime VDC, Rasuwa | Survey Lic No: 298 Date: 2074-04-29 |
6 | Transmission line for Betan Karnali Construction Power | 33 | 30 | 6 | 1144 | 2079-05-07 | Betan Karnali Sanchay Karta Hydropower Co. Ltd. | Darbarmarg, Kathmandu | Sugarkhal Substation(Surkhet Aachham ) | Betan Karnali Project Site(Surkhet) | Survey Lic No: 439 Date: 2076-09-04 |
7 | Grid Connected SPV (Block 1 & Block 2) Banke Joint Transmission Line | 33 | 15 | 20 | 2285 | 2079-07-02 | Pure Energy Pvt. Ltd. | Hyatt Palace, Kathmandu-13; 9801063049, sunita.kc@golyangroup.com | Switchyard of Project | NEA Kohalpur S/S | Survey Lic No: 503 Date: 2078-05-04 |
8 | Rupani Bodebarsain 132 kV Transmission Line Project | 132 | 18.605 | 200 | 3101 | 2079-08-13 | Nepal Electricity Authority | Main office, Darbarmarg, Kathmandu | NEA Rupani S/S | Proposed Bodebarsain S/S | Survey Lic No: 430 Date: 2076-08-19 |
9 | Parwanipur Pokhariya 132 kV Transmission Line Project | 132 | 20 | 250 | 3247 | 2079-08-20 | Nepal Electricity Authority | Durbar Marg, Kathmandu 01-4153007 | NEA Parwanipur S/S | Proposed Pokhariya S/S | Survey Lic No: 512 Date: 2078-08-14 |
10 | Khare Khola Hydropower Project | 132 | 9 | 24.1 | 3583 | 2079-09-06 | Consoriun Power Developers Pvt.Ltd. | 316 Baburam Acharya Sadak , Sinamangal -9 Kathmandu | Switchyard of Hydropower Project (Dolkha | Singati NEA Substation(Dolakha) | Survey Lic No: 446 Date: 2076-09-20 |
11 | Koshi Corridor 220kV T. L. Dharan Sub Station Project | 220 | 0.12 | 100 | 3884 | 2079-09-19 | Nepal Electricity Authority | Durbar Marg Kathmandu | AP 57/2 of Koshi Corridor | AP 57/2 of Koshi Corridor | Survey Lic No: 492 Date: 2078-01-24 |
12 | Joint Transmission Line for Super Kabeli A Super Kbeli Khola & Kabeli 3 | 132 | 30 | 47.43 | 4214 | 2079-10-04 | Snow Rivers Pvt. Ltd. | GPO Box: 20762 Lazimpat Kathamndu-2 Nepal, 9851220305 | Switchyard of Kabeli Khola A Project | NEA Amarpur S/S | Survey Lic No: 522 Date: 2078-09-02 |