Application for Construction License :: Transmission Line

Updated on - Sep 29, 2023

S No Project Voltage (kV)
Line Length (km) Capacity (MW) Appn No Appn Date Promoter
Address Start Point
End Point
Remarks
1 Upper Karnali Hydroelectric Project 400 kV Transmission Line 400 9006091 2072-03-20Karnali Transmission Company Pvt. Ltd. Chakupat-10, Lalitpur, P.O. Box: 148, Tel: 5540718, Fax: 5540659 Bhairabsthan, Accham Brahmadev, Kanchanpur Survey Lic No: 119 Date: 2067-03-23
2 Upper Marsyangdi-2 Hydroelectric Project 400 kV Transmission Line 400 6006093 2072-03-21Marsyangdi Transmission Company Pvt Ltd Chakupat-10, Lalitpur, P.O. Box: 148, Tel: 5540718, Fax: 5540660 Taghring, Lamjung Bodabar, Rupandehi Survey Lic No: 120 Date: 2067-03-23
3 Super Trishuli HP 220kV TR Line 220 30 1001538 2076-05-20Blue Energy P Ltd Darbar Marg Kathmandu, POB 9609, Ph 4233516 Switchyard Bharatpur substation Survey Lic No: 209 Date: 2071-05-26 Er.Vijay
4 Rasuwa Bhotekoshi HEP TL survey Project 220 3.8 120793 2079-04-29Langtang Bhotekoshi Hydropower Company Pvt. Ltd. 01-4440706 Respective Switchyard of the project at Chilime Hub at Chilime VDC, Rasuwa Survey Lic No: 298 Date: 2074-04-29
5 Transmission line for Betan Karnali Construction Power 33 30 61144 2079-05-07Betan Karnali Sanchay Karta Hydropower Co. Ltd. Darbarmarg, Kathmandu Sugarkhal Substation(Surkhet Aachham ) Betan Karnali Project Site(Surkhet) Survey Lic No: 439 Date: 2076-09-04
6 Khare Khola Hydropower Project 132 9 24.13583 2079-09-06Consoriun Power Developers Pvt.Ltd. 316 Baburam Acharya Sadak , Sinamangal -9 Kathmandu Switchyard of Hydropower Project (Dolkha Singati NEA Substation(Dolakha) Survey Lic No: 446 Date: 2076-09-20
7 Arun Corridor (Haitar- Sitalpati) 400 kV Transmission Line Project 400 35 22605468 2079-11-28Rastriya Prasaran Grid Company Ltd DCC Bhawan Babarmahal, Kathmandu; 01-4222693; rpgcl.np@gmail.com Haitar S/S Sitalpati S/S Survey Lic No: 332 Date: 2074-12-01
8 Junbesi Khola HPP Transmission Line Project 33 6 5.27075 2079-12-28Dovan Hydropower Pvt. Ltd. Min Bhawan, New baneshwor KTM; 01-6214401, dovanhydropp@gmail.com Switchyard of Project Switchyard of Upper Solukhola HEP Survey Lic No: 510 Date: 2078-07-22
9 Madhya Hongu Khola B HPP Transmission Line 132 21 22.98794 2080-02-05Shree Gauri Shankar Power Development Pvt.Ltd. Municipality-10, Kathmandu Switchyard of Madhya Hongu Khola Hydro P Tingla NEA Substation Survey Lic No: 344 Date: 2075-02-08
10 Sangu khola-1 Hydro Power Project 33 6 5.59275 2080-02-26Him Parbat Hydropower Pvt. Ltd. Tripureshwor, Kathmandu, Phone:- 4117008 Switchyard of Sangu khola-1 Hydro Powe Switchyard of Sangu khola Hydro Power Pr Survey Lic No: 350 Date: 2075-03-17
11 Chobar Patan Chapagaun 132 kV Transmission Line Project 132 4.5 3009337 2080-02-29Nepal Electricity Authority Durbar Marg, Kathmandu 01-4153007 Chobar S/S Patan S/S Survey Lic No: 528 Date: 2078-11-06
12 Rele khola Transmission Line Project 33 5.707 69583 2080-03-07Him Consult Pvt.Ltd. sahavagita marg 10 , kathmandu, nepal Switchyard of Rele khola HEP Dana substation Survey Lic No: 351 Date: 2075-03-12
13 New Butwal Lamahi Kohahalpur Transmission Line 400 150 193310015 2080-03-22Nepal Electricity Authority Durbarmarga Kathmandu New Butwal Substation Kohalpur Substation Survey Lic No: 457 Date: 2077-04-12
14 Chandrapur Sukdev Chowk 132kV Transmission Line Project 132 36 20010063 2080-03-25Nepal Electricity Authority Main office, Darbarmarg, Kathmandu NEA ChandrpurSubstation Proposed NEA Substation at Saruatha Survey Lic No: 423 Date: 2076-08-16
15 Dudhkund Khola HEP Transmission Line Project 33 21 12283 2080-04-07Mount Everest Power Development Pvt. Ltd. Lalitpur Metropolitan-15, Mahalaxmisthan; 01-5527469, mounteverestpower@gmail.co Switchyard of Project NEA Tingla S/S Survey Lic No: 505 Date: 2078-05-27
16 Siuri Nyadi 132 kV Transmission Line Project 132 5.5 42.6351 2080-04-09Siuri Nyadi Power Ltd. Hanumanstan, Anamnagar, Kathmandu, 01-5705159 Switchyard of Project Switchyard of Nyadi HEP Survey Lic No: 557 Date: 2079-04-11
17 Upper Piluwa 3 HPP Transmission Line 33 13.2 4.95939 2080-05-06Mabilung Energy Ltd. Lalitpur-10, Mobile: 9841509412; Email: mabilung@gmail.com Switchyard of Project NEA Baneshwar S/S Sankhuwasabha Survey Lic No: 465 Date: 2077-05-07
18 Upper Khudi Hydropower Project 132 5 261187 2080-05-18Super Khudi Hydropower Pvt.Ltd. Charkhal, Dillibazzar, Kathmandu, Nepal 01-4424644 4424655 4434003 Swichyard of Upper Khudi HPP(Lamjung) Khudi(Tarikuna) NEA Substation(Lamjung) Survey Lic No: 427 Date: 2076-08-19
19 Prasauni Birgaunj (Gandak) 132 kV Overhead/Underground Transmission Line 132 3.2 3561404 2080-05-27Nepal Electricity Authority Durbar Marg, Kathmandu 01-4153007 Proposed Prasauni S/S NEA Birgunj (Gandak) S/S Survey Lic No: 537 Date: 2079-01-07
20 Lower Erkhuwa to Chirkhuwa HEP Transmission Line Project 33 3.1 14.151421 2080-05-29Lower Erkhuwa Hydropower Co. Pvt. Ltd. Binayak Nagar, KTM-10; 015172683/85 Switchyard of Lower ErkhuwaProject Switchyard of Chirkhuwa HEP Survey Lic No: 552 Date: 2079-03-06