Sano Gaucharan, Kathmandu, Nepal     (977-1-) 4434119      (977-1-) 5244257     info@doed.gov.np

GON Projects :: Under Study Projects (Hydro)

Updated on - Feb 23, 2020

S No Project Capacity (MW) River Latitiude N Longitude E VDC/District Remarks
1 Arun 4 372.000 Arun 27o 35' 00" 27o 38' 24" 87o 18' 15" 87o 22' 45" Hatiya, Num, Pathibhara, Pawakhola (Sankhuwasabha) Feasibility Study by DOED
2 Beni Kaligandaki 50.000 Kali Gandaki 28o 18' 15" 28o 22' 00" 83o 33' 50" 83o 36' 30" Malika (Baglung) Ratnechaur, Jyamrukot, Dhatan, Arthunge (Myagdi) Mallaj, Salija, Dhairing (Parbat) Feasibility Study started from FY 2071/72
3 Bheri Khola 5.000 Bheri Khola 29o 07' 53" 29o 13' 07" 81o 55' 58" 82o 05' 18" Tamti (Jumla) Feasibility Study by DOED
4 Bhimdang Khola 32.000 Bimdang 28o 33' 17" 28o 38' 00" 84o 25' 45" 84o 28' 00" (Manang) Reserved for Nepal Army decision date: 2073-11-12 from MoEN
5 Budhi Ganga 20.000 Budhi Ganga 29o 15' 30" 29o 18' 35" 81o 14' 00" 81o 17' 50" Babala, Hatikot, Kushkot (Achham) Barhabise (Bajura) Under construction with Kuwaiti and Saudi Funds by DOED
6 Budhi Ganga Small 6.200 Budhi Ganga 29o 20' 30" 29o 24' 00" 81o 19' 15" 81o 23' 45" (Bajura) Detailed Engineering Design started from FY 2072/73
7 Burbangkhola 510.000 Burbang 28o 52' 09" 28o 55' 30" 83o 02' 45" 83o 15' 00" (Dolpa) changed status to GON- Basket on 2073-12-08
8 Chameliya 60.000 Chameliya Khola 29o 51' 30" 29o 54' 30" 80o 53' 43" 80o 57' 30" (Darchula) changed status to GON- Basket on 2074-09-14
9 Chyadu Khola 2.000 Chyadu Khola 27o 56' 10" 27o 57' 47" 86o 11' 11" 86o 12' 27" (Dolakha)
10 Ghunsa Khola 78.000 Ghunsa Khola 27o 39' 30" 27o 55' 25" 87o 48' 20" 88o 22' 15" (Taplejung) Detailed Engineering Study
11 Inkhu 21.100 Inkhu 27o 29' 15" 27o 31' 42" 86o 44' 00" 86o 45' 45" Baku (Solukhumbu) Detail Engineering study is being conducted by DOED from fiscal year 2071/72
12 Jawa Khola 17.550 Jawa Khola 29o 16' 26" 29o 19' 01" 82o 12' 21" 82o 15' 50" Chhumchaur, Chandan Nath, Dillichaur, Garjyangkot, Patmara, Patarasi (Jumla) Feasibility Study by DOED, Coordinate amended as per letter dated 2073-8-8, planning devision
13 Jugada Budhiganga HPP 15.430 Budhi Ganga 29o 24' 00" 29o 28' 30" 81o 23' 45" 81o 28' 27" Budhiganga HPP has reserved this HPP
14 Kankai Multipurpose Project 90.000 Kankai 26o 40' 30" 26o 49' 36" 87o 45' 49" 87o 55' 42"
15 Karnali St-1 184.000 Karnali 29o 05' 00" 29o 11' 28" 81o 30' 00" 81o 37' 40" (Kalikot) Feasibility Study started from FY 2072/73
16 Kawadi Khola 20.500 Kawadi Khola 29o 45' 00" 29o 48' 18" 81o 43' 00" 81o 45' 00" Maila (Humla) Feasibility Study by DOED
17 Khimti Shivalaya Storage HPP 1853.000 Khimti Khola 27o 35' 14" 27o 39' 23" 86o 13' 30" 86o 20' 15"
18 Kwadi Khola 1 15.000 Kawadi Khola 29o 41' 35" 29o 44' 59" 81o 41' 00" 81o 45' 00"
19 Lohare River-1 Storage Hydropower Project 81.000 Lohare Khola 28o 43' 13" 28o 53' 41" 81o 35' 00" 81o 48' 09"
20 Loti Karnali (Darma) 49.500 Darma Khola 29o 45' 00" 29o 48' 45" 82o 03' 45" 82o 05' 30" Mimi (Humla) Feasibility Study by DOED
21 Lower Apsuwa Khola 56.000 Apsuwa Khola 27o 30' 49" 27o 33' 35" 87o 10' 00" 87o 14' 00" (Sankhuwasabha) Cordinate amended as per letter dated 2073-01-30 cha no 1797 from study division. Lower apsuwa project in GON reserve list is deleted as this area is within area of Apsuwa Khola HPP of GON reserve project
22 Lower Arun 679.000 Arun 27o 22' 30" 27o 30' 00" 87o 07' 30" 87o 12' 30" (Sankhuwasabha) EOI for Feasibilty Study started(Decision Date : 2071-06-22, Old Lic No 73 - Lower Arun HPL)
23 Lower Chameliya 19.280 Chameliya Khola 29o 40' 00" 29o 41' 40" 80o 34' 21" 80o 37' 59" (Darchula) Feasibility Study started from FY 2071/72
24 Lower Hongu Khola 30.000 Hongu Khola 27o 27' 00" 27o 28' 30" 86o 43' 45" 86o 46' 00" (Solukhumbu) Detailed Engineering Design started from FY 2071/72
25 Madi 8.400 Madi Khola 28o 16' 30" 28o 20' 00" 82o 34' 30" 82o 36' 15"
26 Madi Khola 12.980 Madi Khola 28o 13' 44" 28o 15' 43" 82o 36' 44" 82o 38' 32" Jedwang, Liwang, Khungri, Ghodagaun (Rolpa) Detailed Engineering Design started from FY 2068/69 Coordinate as per letter dated2073-01-11 cha no 1673 of Study Division
27 Middle Inkhu Khola 25.300 Inkhu 27o 31' 30" 27o 34' 00" 86o 45' 30" 86o 47' 00" (Solukhumbu) Desk study by DOED from fiscal year 2073/74
28 Myagdi Khola 32.000 Myagdi Khola 28o 18' 45" 28o 22' 00" 83o 30' 00" 83o 35' 30" Devisthan (Myagdi) Feasibility Study started from FY 2071/72
29 Nagmati Reservoir HEP 2.120 Nagmati 27o 45' 00" 27o 47' 30" 85o 25' 00" 85o 27' 30" Under Study : Ministry of Irrigation
30 Naumure Storage Project 377.000 west rapti 27o 46' 06" 28o 00' 53" 82o 45' 00" 83o 02' 30" Letter dated 2073-8-8 (ch no 643 study division)
31 Nyaurigad 4.015 Nyauri Gad 29o 22' 34" 29o 25' 45" 82o 05' 16" 82o 12' 34" Buvramadichaur (Jumla) Feasibility Study by DOED
32 Pikhuwa Khola ( Khawa ) HPP 6.750 Pikhuwa 27o 10' 34" 27o 12' 08" 86o 59' 25" 87o 01' 00" Khawa, Kota (Bhojpur) FEASIBILITY STUDY BY DOED Decision Date : 2071-09-20 Old Lic No 598 of Salpa Hydropower Company Pvt Ltd
33 Rupagad HPP 9.140 Rup Gad 28o 56' 00" 28o 59' 00" 82o 49' 30" 82o 52' 25" As per letter dated 2073-08-06 from inspection devision
34 Saru Khola HPP 15.000 Saru Khola 28o 45' 20" 28o 51' 18" 82o 03' 47" 82o 10' 00" Cordinate ammended as per 2074-07-23 decision
35 Sharada Babai Storage HPP 93.000 Sharada 28o 15' 00" 28o 20' 00" 82o 00' 00" 82o 07' 30"
36 Siwa Khola 25.130 Siwa Khola 27o 27' 30" 27o 30' 30" 87o 34' 00" 87o 37' 30" (Taplejung) Detailed Engineering Design started from FY 2071/72 Cordinate ammended as as per letter dated 2073-01-11 cha. no. 1673 from Study Division
37 SR-06 Storage 276.000 West Seti 28o 58' 00" 29o 16' 00" 80o 55' 30" 81o 12' 30" Feasibility Study by DOED
38 Sunkoshi 2 1116.000 Sun Koshi 27o 13' 30" 27o 29' 30" 85o 47' 30" 86o 10' 20" Feasibility Study started from FY 2072/73
39 Sunkoshi 3 536.000 Sun Koshi 27o 29' 00" 27o 45' 30" 85o 35' 55" 85o 50' 00" Feasibility Study started from FY 2072/73
40 Upper Arun 335.000 Arun 27o 38' 24" 27o 48' 09" 87o 20' 00" 87o 30' 00" Chepuwa, Hatiya (Sankhuwasabha) being studied by NEA under IDA assistance
41 Upper Jhimruk Storage Project 100.000 Jhimruk 28o 07' 30" 28o 12' 30" 82o 52' 30" 83o 00' 00" As per Letter dated 2073-08-08 (Ch no 642, study division)
42 Upper Khudi-A HPP 27.400 Khudi 28o 21' 50" 28o 24' 27" 84o 16' 43" 84o 19' 36" Ghanpokhara, Khudi (Lamjung) Feasibility Study started from FY 2071/72, Coordinate amended as per 2073-8-8, study division.
43 Yanma Khola 64.000 Yangma Khola 27o 39' 31" 27o 41' 31" 87o 47' 52" 87o 50' 00" (Taplejung) changed status to GON- Basket on 2074-09-14
Total capacity for 43 projects = 7331.795 MW Coded By Kshitiz Shrestha