S No Project Capacity (MW)RiverLatitiude N Longitude E VDC/District Remarks
1 Aan Balephi B 4.533Balephi27o 48' 24"27o 50' 48"85o 45' 00"85o 46' 30" Batase,Jalbire (Sindhupalchok)
2 Apsuwa Khola 50.000Apsuwa27o 30' 49"27o 35' 40"87o 10' 00"87o 14' 00" (Sankhuwasabha) Cordinate amended as per letter dated 2073-01-30 cha no 1797 from study division. Lower apsuwa project in GON reserve list is deleted as this area is within area of Apsuwa Khola HPP of GON reserve project
3 Arun 4 300.000Arun27o 35' 00"27o 38' 24"87o 18' 15"87o 22' 45" Hatiya,Num,Pathibhara,Pawakhola (Sankhuwasabha)Feasibility Study by DOED
4 Badigad 7.000Badigad28o 11' 48"28o 13' 34"83o 13' 37"83o 17' 01" (Gulmi)
5 Badigad (Kolti) 4.500Badigad29o 29' 17"29o 30' 25"81o 39' 00"81o 42' 15" (Bajura)
6 Badigad -A 5.000Badigad28o 13' 41"28o 15' 43"83o 11' 47"83o 14' 19" (Baglung)
7 Bagar Khola 7.100Bagar28o 28' 32"28o 30' 00"83o 31' 32"83o 32' 43" Chimkhola (Myagdi)
8 Bajhang Upper Seti Hydropower Project 80.000Seti29o 45' 00"29o 50' 30"81o 15' 00"81o 18' 45" Kanda (Bajhang)
9 Banganga 3.200Banganga27o 47' 50"27o 50' 15"83o 10' 40"83o 12' 30" (Arghakhanchi)
10 Beni Kaligandaki 50.000Kali Gandaki28o 18' 15"28o 22' 00"83o 33' 50"83o 36' 30" Malika (Baglung) Ratnechaur,Jyamrukot,Dhatan,Arthunge (Myagdi) Mallaj,Salija,Dhairing (Parbat)Feasibility Study started from FY 2071/72
11 Bheri Khola 5.800Bheri Khola29o 07' 53"29o 13' 07"81o 55' 58"82o 05' 18" Tamti (Jumla)Feasibility Study by DOED
12 Bheri-1 Hydropower Project 440.000Bheri28o 52' 15"28o 59' 00"82o 26' 45"82o 33' 00" (Rukum)
13 Bheri-2 Hydropower Project 243.000Bheri28o 46' 45"28o 53' 30"82o 18' 45"82o 26' 30" Bhagawati Tol,Ragda (Jajarkot) Gautamkot (Rukum)
14 Bheri-Babai Diversion Project 48.000Bheri28o 20' 10"28o 29' 45"81o 18' 50"81o 52' 26" BirendraNagar N.P. (Surkhet) Under construction by Dept of Irrigation
15 Bhimdang Khola 32.000Bimdang28o 33' 17"28o 38' 00"84o 25' 45"84o 28' 00" (Manang) Reserved for Nepal Army decision date: 2073-11-12 from MoEN
16 Bhotekoshi 5 60.000Bhotekoshi27o 45' 33"27o 49' 08"85o 51' 49"85o 54' 14" Barhabise,Gati,Tekanpur,Maneswor,Ramche,Mankha (Sindhupalchok)
17 Bhuji Khola 4.700Bhuji28o 20' 15"28o 21' 34"83o 07' 58"83o 10' 00" Adhikarichaur,Burtiwang (Baglung)
18 Bojyan Khola 2.000Bojyan28o 15' 00"28o 16' 31"82o 45' 23"82o 48' 08" (Rolpa)
19 Budhi Gandaki Storage Hydropower Project 1200.000Budhi Gandaki27o 48' 30"28o 07' 30"84o 42' 30"84o 56' 00" Budhathum,Chainpur,Khari,Maidi,Salyantar,Salang (Dhading) Namjung,Dhawa,Darbhung,Borlang,Ghyalchok,Tandrang (Gorkha)detailed engineering study completed 2072/73
20 Budhi Ganga 20.000Budhi Ganga29o 15' 30"29o 18' 35"81o 14' 00"81o 17' 50" Babala,Hatikot,Kushkot (Achham) Barhabise (Bajura) Under construction with Kuwaiti and Saudi Funds by DOED
21 Budhi Ganga Small 6.200Budhi Ganga29o 20' 30"29o 24' 00"81o 19' 15"81o 23' 45" (Bajura)Detailed Engineering Design started from FY 2072/73
22 Budhigandaki Hydropower Project 254.000Budhi Gandaki28o 17' 00"28o 22' 00"84o 51' 48"84o 56' 56" Kerauja,Sirdibas,Uiya (Gorkha) The legality of the cancelled survey license is under review in the supreme court.
23 Buku Khola 6.000Buku27o 30' 45"27o 31' 17"86o 20' 31"86o 22' 21" (Solukhumbu) (to be transfered to generation application due to decision of supreme court)
24 Buku Khola 6.000Buku27o 30' 45"27o 31' 17"86o 20' 31"86o 22' 29" Bhussinga,Rawadolu (Okhaldhunga) Goli (Solukhumbu)
25 Burbangkhola 15.000Burbang28o 52' 09"28o 53' 30"83o 06' 45"83o 10' 10" (Dolpa)
26 Chainpur Seti HEP 454.000Seti29o 36' 27"29o 44' 59"81o 15' 00"81o 21' 00" Chainpur (Bajhang)
27 Chameliya 34.250Chameliya29o 51' 30"29o 54' 30"80o 53' 43"80o 57' 30" (Darchula)
28 Chepe Khola 8.600Chepe28o 03' 43"28o 05' 26"84o 29' 00"84o 31' 05" (Gorkha)
29 Chepe Khola 3.500Chepe28o 08' 49"28o 10' 25"84o 35' 27"84o 37' 15" (Lamjung)
30 Chhahare Khola 17.500Chhahare28o 25' 00"28o 27' 07"84o 24' 00"84o 26' 20" (Lamjung)
31 Chhaldi Khola 4.960Chhaldi 28o 06' 00"28o 07' 00"83o 14' 11"83o 16' 00" Hastichaur (Gulmi)
32 Chhati Gad 32.000Chhati Gad29o 48' 20"29o 50' 00"80o 53' 10"80o 55' 00" Khandeswori (Darchula)
33 Chhilung Khola 8.000Chhilung28o 25' 00"28o 27' 30"87o 50' 30"87o 54' 30" (Gorkha)
34 Chingad Khola 4.800Chingad28o 33' 09"28o 34' 38"81o 44' 07"81o 45' 57" (Surkhet)
35 Chiuragad 2.800Chiuragad28o 23' 24"28o 24' 28"82o 28' 46"82o 30' 50" (Rolpa)
36 Chyadu Khola 2.000Chyadu27o 56' 10"27o 57' 47"86o 11' 11"86o 12' 27" (Dolakha)
37 Dapcha Roshi Small 5.000Roshi27o 30' 00"27o 31' 30"85o 39' 12"85o 43' 27" (Kabhrepalanchok)
38 Deumai Khola 30.000deumai26o 49' 50"26o 54' 25"87o 46' 10"87o 47' 30" Mahamai (Ilam)
39 Devighat Cascade HPP 9.600Trishuli27o 51' 08"27o 53' 17"85o 05' 48"85o 08' 16" Bidur N.P.,Charghare,Khadag Bhanjyang (Nuwakot)
40 Dotigad 5.780Dotigad29o 17' 37"29o 18' 25"80o 28' 55"80o 30' 30" Bagarkot (Dadeldhura) Feasibility Study started from FY 2069/70 Cordinate ammended as per letter dated 2073-01-11 cha no 1673 of Study Division
41 Dudh Khola HPP 25.000Dudh Khola28o 31' 27"28o 33' 05"84o 21' 28"84o 23' 18" Thoche (Manang)
42 Dudh Koshi -V 48.000Dudh Koshi27o 29' 46"27o 33' 30"86o 40' 00"86o 43' 37" Takasindu,Jubing,Baku,Basa (Solukhumbu)
43 Dudh Koshi-IV 46.000Dudh Koshi27o 27' 00"27o 29' 46"86o 41' 00"86o 44' 20" (Solukhumbu)
44 Gaddi Gad HPP 4.000Gaddigad29o 13' 30"29o 15' 20"81o 01' 54"81o 03' 24" Latamadau,Sanagau (Doti)
45 Ghalemdi Khola 10.000Ghalemdi28o 31' 00"28o 33' 00"83o 42' 00"83o 45' 00" (Myagdi)
46 Ghandruk Modi 111.000Modi28o 24' 26"28o 29' 19"83o 49' 40"83o 53' 52" (Kaski)
47 Ghunsa Khola 78.000Ghunsa27o 31' 00"27o 55' 25"87o 48' 20"88o 22' 15" (Taplejung) Detailed Engineering Study
48 Guthichaur ( Babila Khola ) 3.000Babila Khola29o 11' 32"29o 13' 26"82o 18' 23"82o 20' 12" Gothichaur (Jumla)
49 Hadi Khola 2.000Hadi27o 54' 15"27o 55' 20"85o 37' 30"85o 39' 36" (Sindhupalchok)
50 Hewa Khola - B 2.300Hewa27o 09' 39"27o 10' 40"87o 46' 32"87o 47' 30" Bharapa,Nangeen (Panchthar)
51 Hugdi 3.600Hugdi28o 03' 16"28o 05' 00"83o 20' 55"83o 23' 21" (Gulmi)
52 Humla Karnali-1 274.000Humla Karnali29o 41' 30"29o 47' 30"81o 56' 30"82o 02' 00" (Humla)
53 Humla Karnali-Cascade 916.000Karnali29o 52' 48"30o 07' 15"81o 30' 00"81o 53' 26" (Humla)
54 Igdigad 4.610Igdigad29o 18' 08"29o 20' 44"81o 15' 00"81o 16' 15" (Achham)
55 Ikhuwa Khola 30.000Ikhuwa27o 35' 07"27o 37' 12"87o 21' 16"87o 25' 03" (Sankhuwasabha) Feasibility Study started from FY 2067/68
56 Indrawati Melamchi 4.900Indrawati melamchi27o 47' 50"27o 49' 59"85o 34' 25"85o 35' 10" Badegau,Jyamire,Sikharpur (Sindhupalchok)
57 Inkhu 11.000Inkhu27o 29' 15"27o 31' 42"86o 44' 00"86o 45' 45" Baku (Solukhumbu)As per letter dated 2073-03-20 (cha. no. 2062) of Planning Division
58 Inkhu Khola 20.000Inkhu27o 31' 30"27o 34' 00"86o 45' 30"86o 47' 00" (Solukhumbu)Detailed Engineering Design started from FY 2071/72
59 Jagadulla Khola 75.000Jagadulla29o 03' 15"29o 07' 10"82o 33' 48"82o 36' 15" Narku (Dolpa) In Doed programme fir 2073/74
60 Jawa Khola 5.000Jawa Khola29o 17' 17"29o 19' 01"82o 12' 54"82o 15' 50" Chhumchaur,Chandan Nath,Dillichaur,Garjyangkot,Patmara,Patarasi (Jumla)Feasibility Study by DOED, Coordinate amended as per letter dated 2073-8-8, planning devision
61 Jhon Khola HPP 2.200Jhon28o 49' 20"28o 50' 25"83o 46' 54"83o 50' 00" Jhong,Jomosom,Kagbeni,Muktinath (Mustang)
62 Jhyaku Khola 8.000Jhyaku 27o 40' 41"27o 43' 51"86o 09' 46"86o 12' 42" (Dolakha)
63 Jugada Budhiganga HPP 15.430Budhi Ganga29o 24' 00"29o 28' 30"81o 23' 45"81o 28' 27"Budhiganga HPP has reserved this HPP
64 Kabeli 3 22.000Kabeli27o 21' 41"27o 25' 08"87o 50' 58"87o 53' 24" (Taplejung)Feasibility Study started from FY 2067/68
65 Kailash Khola HPP 3.980Kailash Khola29o 09' 53"29o 11' 30"81o 22' 30"81o 24' 40" Bhatakatiya,Santada,Sutar (Achham)
66 Kaligandki Gorge 164.000Kali Gandaki28o 31' 15"28o 36' 15"83o 37' 15"83o 40' 00" (Myagdi) The legality of the application for the generation license is under review in the supreme court.
67 Karnali -7 330.000Karnali28o 53' 00"28o 55' 54"81o 17' 30"81o 24' 50" (Achham)
68 Karnali St-1 184.000Karnali29o 05' 00"29o 11' 28"81o 30' 00"81o 37' 40" (Kalikot)Feasibility Study started from FY 2072/73
69 Karuwa HPP 36.000Seti28o 22' 12"28o 24' 30"83o 57' 00"84o 00' 00" Machhapuchchhre,Sardikhola (Kaski)
70 Katti Khola 2.978Katti 28o 47' 00"28o 48' 41"81o 45' 28"81o 48' 06" (Dailekh)
71 Kawadi Khola 10.000Kawadi Khola29o 45' 00"29o 48' 18"81o 43' 00"81o 45' 00" Maila (Humla)Feasibility Study by DOED
72 Khimti A 2.000Khimti 27o 35' 00"27o 36' 06"86o 14' 05"86o 16' 26" (Ramechhap)
73 Khimti Shivalaya Storage HPP 200.000Khimti27o 35' 14"27o 39' 23"86o 13' 30"86o 20' 15"
74 Kiche Khola 1.200Kichhe28o 18' 50"28o 19' 34"84o 18' 20"84o 20' 11" (Lamjung)
75 Kimanthanka Arun 434.000Arun27o 46' 50"27o 50' 00"87o 23' 00"87o 28' 00" Chepuwa (Sankhuwasabha)Feasibility Study by DOED
76 Kirne Hydropower Project 65.000Khimti27o 28' 15"27o 33' 34"86o 06' 05"86o 11' 53" ,Namadi,Pharpu,Phulasi,Rasanalu,Khimti (Ramechhap)
77 Kunwari Khola 7.700Kunwari29o 37' 00"29o 50' 00"81o 41' 00"81o 45' 00" (Bajura)
78 Kwaligau Khola 2.000Kwaligau28o 15' 00"28o 17' 30"82o 42' 57"82o 43' 53" (Rolpa)
79 Lahpa Khola 5.000Lahpa 28o 09' 55"28o 11' 28"85o 01' 05"85o 03' 02" (Dhading)
80 Lahu Khola 4.080Lahu 28o 34' 36"28o 36' 28"82o 25' 52"82o 26' 51" (Rukum)
81 Langdi Khola 1.500Langdi28o 10' 28"28o 11' 54"84o 35' 00"84o 36' 41" (Lamjung)
82 Lawa Khola 3.000Lawa 26o 47' 00"26o 49' 32"87o 35' 00"87o 37' 30" (Morang)
83 Likhu A HPP 5.000Likhu 27o 20' 58"27o 22' 30"86o 12' 36"86o 13' 54" Singhadevi,Narmedeshwor (Okhaldhunga) Gothgau (Ramechhap)
84 Likhu Khola 7.000Likhu27o 31' 18"27o 32' 02"86o 21' 05"86o 21' 41" (Ramechhap)
85 Likhu Khola 7.000Likhu27o 31' 18"27o 32' 02"86o 21' 05"86o 21' 14" Betali (Ramechhap)
86 Loti Karnali (Darma) 10.000Darma Khola29o 45' 00"29o 48' 45"82o 03' 45"82o 05' 30" Mimi (Humla)Feasibility Study by DOED
87 Lower Arun 400.000Arun27o 22' 30"27o 30' 00"87o 07' 30"87o 12' 30" (Sankhuwasabha)
88 Lower Balephi 20.000Balephi 27o 45' 39"27o 48' 23"85o 44' 45"85o 46' 41" (Sindhupalchok)
89 Lower Burbangkhola 20.000Burbang28o 52' 50"28o 54' 50"83o 02' 45"83o 06' 45" (Dolpa)
90 Lower Chameliya 20.000Chameliya29o 40' 00"29o 41' 40"80o 34' 21"80o 37' 59" (Darchula)Feasibility Study started from FY 2071/72
91 Lower Chepe Khola HPP 8.740Chepe Khola28o 08' 23"28o 10' 30"84o 34' 30"84o 37' 20" Chiti (Lamjung)
92 Lower Hongu Khola 23.500Hongu27o 27' 00"27o 28' 30"86o 44' 00"86o 46' 30" (Solukhumbu)Detailed Engineering Design started from FY 2071/72
93 Lower Igwa Khola 7.300Igwa27o 16' 41"27o 17' 04"87o 51' 55"87o 52' 21" Sawalakhu (Taplejung)
94 Lower Indrawati 4.500Indrawati27o 50' 00"27o 52' 04"85o 34' 46"85o 34' 46" (Sindhupalchok)
95 Lower Jogmai Khola 6.100Jogmai26o 52' 55"26o 54' 16"87o 57' 26"88o 00' 00" (Ilam)
96 Lower Khorunga 2.000Khoranga27o 07' 30"27o 08' 23"87o 32' 30"87o 34' 32" (Terhathum)
97 Lower Lohore Khola HPP 20.000Lohore28o 45' 28"28o 47' 30"81o 35' 00"81o 39' 00" Baraha,Dada Parajul,Gauri,Kalika,Khadkawada (Dailekh)
98 Lower Nyadi HPP 10.500Nyadi28o 18' 30"28o 19' 45"84o 24' 05"84o 25' 25" Bahundada,Bhulbhule (Lamjung)
99 Lower Roshi Khola Small 4.700Roshi27o 26' 10"27o 27' 15"85o 46' 33"85o 48' 39" (Kabhrepalanchok)
100 Lower Sunkoshi-3 10.200Sun Koshi27o 44' 30"27o 45' 15"85o 48' 00"85o 50' 30" (Sindhupalchok)
101 Lower Surnayagad 5.000Surnaya Gad29o 24' 40"29o 26' 25"80o 28' 00"80o 30' 15" (Baitadi)
102 Lower Tamor 49.500Tamor27o 15' 30"27o 19' 40"87o 39' 20"87o 42' 00" Ambarpur (Panchthar) Dokhu,Nankholyang,Nidhuradin,Phulbari (Taplejung)
103 Lungri Khola 10.000Lungri28o 14' 00"28o 18' 30"82o 43' 00"82o 47' 45" Harjang (Rolpa)Feasibility Study started from FY 2071/72
104 Machha Khola 4.900Machha 28o 12' 19"28o 14' 03"84o 49' 30"84o 52' 36" (Gorkha)
105 Madi Khola 3.600Madi28o 22' 45"28o 23' 50"82o 30' 50"82o 32' 30" (Rolpa)
106 Madi Khola 8.400Madi28o 16' 30"28o 20' 00"82o 34' 30"82o 36' 15" (Rolpa)
107 Madi Khola 12.980Madi28o 13' 44"28o 15' 43"82o 36' 44"82o 38' 32" Jedwang,Liwang,Khungri,Ghodagaun (Rolpa)Detailed Engineering Design started from FY 2068/69 Coordinate as per letter dated2073-01-11 cha no 1673 of Study Division
108 Madi Siti 86.000Madi28o 10' 23"28o 11' 54"84o 08' 35"84o 14' 45" (Lamjung)Storage Project
109 Mahesh Khola 1.500Mahesh27o 46' 28"27o 48' 26"85o 00' 00"85o 02' 00" (Dhading)
110 Mahesh Khola 2.170Mahesh 27o 45' 45"27o 48' 05"85o 00' 00"85o 03' 17" (Dhading)
111 Mai Khola A 2.500Mai26o 56' 30"26o 57' 30"87o 56' 47"87o 57' 33" (Ilam)
112 Mai Khola A 1 1.250Mai27o 03' 55"27o 04' 48"87o 57' 48"88o 00' 00" Mabu,Maimajhuwa (Ilam)
113 Mai Khola B 9.000Mai26o 53' 09"26o 55' 14"87o 56' 38"87o 57' 25" (Ilam)
114 Maiwa Khola 13.500Maiwa27o 21' 00"27o 22' 37"87o 33' 58"87o 37' 37" (Taplejung)Detailed Engineering Design started from FY 2068/69
115 Malagad 5.310Malagad29o 20' 11"29o 20' 58"81o 20' 13"81o 22' 21" (Bajura)
116 Manahari Khola 8.500Manahari 27o 33' 37"27o 35' 14"84o 52' 52"84o 55' 18" Kalikatar,Raksorang (Makawanpur)
117 Marsyangdi 3 42.000Marsyangdi28o 05' 27"28o 08' 09"84o 25' 39"84o 27' 30" Dhamilikuwa,Tarkughat (Lamjung)
118 Marsyangdi-7 50.000Marsyangdi28o 32' 33"28o 36' 21"84o 10' 26"84o 16' 00" ,Pisng,Chame (Manang)
119 Middle Gaddi Gad 3.500Gaddigad29o 15' 20"29o 16' 40"81o 03' 00"81o 03' 44" (Doti)
120 Middle Karnali 30.000Karnali29o 20' 00"29o 32' 30"81o 40' 00"81o 50' 00"
121 Middle Khimti HP 4.200Khimti27o 36' 37"27o 39' 08"86o 17' 55"86o 19' 27" Syama (Dolakha) Chuchure (Ramechhap)
122 Middle Super Daraudi 4.480Daraundi28o 11' 35"28o 13' 23"84o 43' 20"84o 44' 07" (Gorkha)
123 Middle Tadi 5.500Tadi 27o 57' 30"27o 57' 54"85o 24' 04"85o 25' 00" Dhyangphedi,Rautbesi,Shikharbesi (Nuwakot)
124 Midim Khola 3.400Midim28o 17' 55"28o 19' 00"84o 15' 00"84o 15' 55" ,Bhujung (Lamjung)
125 Mudi Khola 21.500Mudi 28o 31' 19"28o 35' 00"83o 16' 28"83o 21' 44" (Myagdi)
126 Mugu Karnali-1 194.000Mugu Karnali29o 35' 00"29o 39' 00"81o 51' 00"82o 00' 00" (Mugu)
127 Myagdi Khola 32.000Myagdi28o 18' 45"28o 22' 00"83o 30' 00"83o 35' 30" Devisthan (Myagdi)Feasibility Study started from FY 2071/72
128 Nalsyaugad Reservoir 410.000Nalsyaugad28o 47' 28"28o 58' 00"82o 14' 00"82o 19' 12" Ramidanda,Sakala,Dandagaun,Lahai (Jajarkot)under Nalsinghgad Hydropower Development Company
129 Namlan 303.000Namlan29o 33' 45"29o 36' 05"82o 25' 00"82o 33' 00" (Mugu)
130 Nar Khola 50.000Nar Khola28o 33' 00"28o 38' 00"84o 12' 52"84o 16' 22" (Manang)
131 Naumure Storage Project 300.000west rapti27o 46' 06"28o 00' 53"82o 45' 00"83o 02' 30"Letter dated 2073-8-8 (ch no 643 study division)
132 Nimrung Khola 4.280Nimrung 28o 15' 00"28o 16' 30"84o 51' 00"84o 53' 10" (Gorkha)
133 Nisi Khola HEP-1 6.000Nisi28o 19' 44"28o 21' 52"83o 05' 00"83o 07' 30" Adhikarichaur,Boharagaun,Bowang,Burtiwang,Devisthan,Nisi (Baglung)
134 Nupche - Likhu 5.400Likhu27o 40' 09"27o 42' 09"86o 26' 41"86o 29' 06" (Ramechhap)
135 Nyasim Khola 30.000Nyasim27o 57' 30"27o 59' 30"85o 47' 30"85o 49' 30" (Sindhupalchok)
136 Nyaurigad 7.000Nyauri Gad29o 22' 34"29o 25' 45"82o 05' 16"82o 12' 34" Buvramadichaur (Jumla)Feasibility Study by DOED
137 Orang Khoa HPP 2.100Orang Khola27o 46' 46"27o 47' 39"86o 11' 18"86o 13' 09" Bulung,Orang (Dolakha)
138 Padam Khola 3.500Padam 28o 54' 30"28o 54' 56"81o 49' 30"81o 51' 45" (Dailekh)deleted on Thu, 21 Feb 2013 14:40:03 +0545
139 Panagad Khola 1.200Panagad28o 05' 22"28o 05' 54"83o 09' 54"83o 11' 44" (Gulmi)
140 Parajuli Khola 4.200Parajuli28o 43' 14"28o 45' 28"81o 39' 08"81o 41' 54" (Dailekh)
141 Phalakhu 5.500Phalakhu27o 59' 10"28o 00' 15"85o 15' 29"85o 17' 45" (Rasuwa)
142 Phenlun Briddhin Diversion HPP 4.500Phenlun-Briddhin28o 11' 34"28o 14' 05"85o 21' 55"85o 24' 03" Briddhim (Rasuwa)
143 Phulkot Karnali 210.000Karnali29o 10' 00"29o 20' 00"81o 35' 00"81o 44' 00" (Kalikot)
144 Pikhuwa Khola ( Khawa ) HPP 10.000Pikhuwa 27o 10' 34"27o 12' 08"86o 59' 25"87o 01' 00" Khawa,Kota (Bhojpur)
145 Poldumki Khola 1.600Poldumki27o 29' 30"27o 30' 33"85o 04' 43"85o 06' 00" (Makawanpur)
146 Puwa-Jhutre 2.000Puwa26o 56' 51"26o 58' 46"87o 53' 00"87o 55' 00" (Ilam)
147 Rapti Khola 2.185Rapti27o 30' 04"27o 30' 53"85o 03' 09"85o 04' 51" Bhaise,Nibuwatar (Makawanpur)
148 Rigdi Khola 1.940Rigdi27o 48' 00"27o 49' 00"84o 30' 30"84o 31' 30" Dahakhani (Chitwan)
149 Roshi Khola 3.000Roshi27o 32' 45"27o 34' 00"85o 31' 30"85o 34' 00" (Kabhrepalanchok)
150 Roshi Mangaltar HPP 4.500Roshi27o 28' 30"27o 30' 00"85o 43' 29"85o 45' 00" Mangaltar,Kharpachok (Kavrepalanchok)
151 Rupagad HPP 10.000Rup Gad28o 56' 00"28o 59' 00"82o 49' 30"82o 52' 25"As per letter dated 2073-08-06 from inspection devision
152 Sabha A 9.000Sabha27o 24' 13"27o 25' 55"87o 17' 17"87o 19' 02" (Sankhuwasabha)
153 Sabha Khola HPP 2.400Sabha27o 21' 11"27o 21' 35"87o 13' 45"87o 14' 44" Syabun,Dhupu (Sankhuwasabha)
154 Sankhuwa Khola 25.000Sankhuwa27o 25' 40"27o 28' 39"87o 05' 00"87o 08' 30" (Sankhuwasabha)Feasibility Study started from FY 2071/72
155 Sankuwa Khola 1 35.340Sankuwa27o 28' 44"27o 32' 45"87o 04' 00"87o 06' 04" Bala,Tamku (Sankhuwasabha)Co ordinate and name amended as per letter dated 2073-03-14 cha no 805 from study division
156 Sapsu Khola 2.780Sapsu 27o 08' 35"27o 09' 40"86o 45' 15"86o 48' 20" (Khotang)
157 Saru Khola HPP 100.000Saru Khola28o 45' 20"28o 51' 18"82o 04' 28"82o 10' 00"
158 Sepli Khola 5.000Sepli Khola27o 22' 37"27o 23' 36"86o 26' 38"86o 27' 51" Patle (Okhaldhunga)
159 Serpu Daha - Sani Bheri Nadi (PS) 30.100Sani Bheri28o 40' 00"28o 42' 30"82o 28' 24"82o 30' 00" (Rukum)
160 Seti 128.000Seti27o 49' 03"27o 55' 00"84o 17' 30"84o 27' 40" (Tanahu)
161 Seti (SR 6) Storage Project 600.000West Seti28o 58' 00"29o 16' 00"80o 55' 30"81o 12' 30"As per letter dated 2073-08-08 from study devision
162 Seti Nadi HEP 30.000Seti28o 18' 40"28o 22' 12"83o 57' 15"83o 58' 30" Machhapuchchhre,Sardikhola (Kaski)
163 Seti Nadi-3 HPP 80.000seti29o 30' 00"29o 34' 00"81o 05' 00"81o 14' 00" Rithapata,Subeda,Kadel,Hemantabada,Luyanta,Malumela (Bajhang)
164 Sharada Babai Storage HPP 93.000Sharada28o 15' 00"28o 20' 00"82o 00' 00"82o 07' 30"
165 Shyam Khola HPP 4.500shyam27o 18' 46"27o 21' 22"87o 03' 59"87o 05' 27" Keemalung (Bhojpur)
166 Simbuwa Khola 53.000Simbuwa27o 30' 00"27o 31' 48"87o 47' 23"87o 52' 14" (Taplejung)Feasibility Study started from FY 2072/73
167 Sisa Khola HPP 5.000Sisa27o 26' 07"27o 27' 40"86o 30' 00"86o 33' 31" Kerung (Solukhumbu)
168 Sisuwa Khola 2.670Sisuwa 27o 28' 39"27o 30' 00"87o 01' 13"87o 02' 25" (Sankhuwasabha)
169 Siwa Khola 15.000Siwa27o 27' 30"27o 30' 30"87o 34' 00"87o 37' 30" (Taplejung)Detailed Engineering Design started from FY 2071/72 Cordinate ammended as as per letter dated 2073-01-11 cha. no. 1673 from Study Division
170 Siwan Khola 5.980Siwan28o 16' 36"28o 17' 30"82o 33' 57"82o 34' 56" (Rolpa)
171 Small Likhu Khola 1.500Likhu27o 51' 09"27o 52' 30"85o 16' 47"85o 19' 50" (Nuwakot)
172 SR-06 Storage 600.000West Seti28o 58' 00"29o 16' 00"80o 55' 30"81o 12' 30"Feasibility Study by DOED
173 Sudha Khola 3.750Sudha28o 21' 50"28o 23' 27"84o 18' 58"84o 20' 00" (Lamjung) area from this project has been traffered to Upper Khudi A HPP 27.8MW GoN study
174 Sunkoshi 2 1110.000Sun Koshi27o 13' 30"27o 29' 30"85o 47' 30"86o 10' 20"Feasibility Study started from FY 2072/73
175 Sunkoshi 3 536.000Sun Koshi27o 29' 00"27o 45' 30"85o 35' 55"85o 50' 00"Feasibility Study started from FY 2072/73
176 Super Chepe 5.000Chepe28o 13' 00"28o 15' 00"84o 37' 55"84o 39' 08" Kharibot (Gorkha) Dudhpokhari (Lamjung)
177 Super Lohare Khola HPP 4.360Lohore28o 55' 01"28o 57' 16"81o 48' 41"81o 49' 15" Baluwatar,Toli (Dailekh)
178 Suti Khola 20.000Suti28o 34' 36"28o 37' 40"84o 23' 00"84o 24' 45" (Manang)
179 Syara Khola 8.700Syara28o 25' 45"28o 28' 30"84o 54' 30"84o 57' 30" (Gorkha)
180 Tadi Ghyamphedi 2.500Tadi27o 59' 03"28o 00' 40"85o 26' 36"85o 27' 51" (Nuwakot)
181 Taksu Small Hydropower Projct 3.500Taksu28o 52' 23"28o 53' 50"82o 26' 15"82o 27' 30"Project resorved for Nalisng Gad HPP as per doed decision 2073-8-7
182 Tallo Bagmati 2.570Bagmati27o 29' 35"27o 30' 18"85o 14' 02"85o 15' 13" (Makawanpur)
183 Tamakoshi -1 100.000TamaKoshi27o 25' 00"27o 29' 34"86o 05' 00"86o 07' 00" Sahure (Dolakha) Phulasi,Gailu (Ramechhap)
184 Tamakoshi-V 87.000TamaKoshi27o 45' 00"27o 48' 59"86o 10' 30"86o 14' 30" (Dolakha)
185 Taman Khola HEP-1 4.400Taman28o 21' 18"28o 22' 30"83o 10' 45"83o 12' 20" Adhikarichaur,Bungadovan,Khukhani,Khunga,Taman (Baglung)
186 Taman Khola HEP-2 4.000Taman28o 22' 31"28o 24' 00"83o 11' 30"83o 12' 30" Adhikarichaur,Bungadovan,Khukhani,Khunga,Taman (Baglung)
187 Tame Khola SHP 1.250Tame28o 52' 00"28o 53' 52"81o 46' 08"81o 46' 36" Narayan (Dailekh)
188 Tamor Mewa 101.000Tamor27o 20' 00"27o 25' 00"87o 35' 00"87o 40' 00" Khokling,Phungling (Taplejung)
189 Thadekhani Khola HPP 5.000Thadekhani Khola28o 26' 26"28o 27' 30"83o 29' 00"83o 31' 16" Pakhapani (Myagdi)
190 Thapa Khola 2.340Sun Koshi28o 42' 00"28o 45' 00"83o 36' 15"83o 39' 25" (Mustang )
191 Thuli Bheri-1 HPP 110.000Thuli Bheri28o 58' 00"29o 02' 00"82o 45' 00"82o 52' 30" Dunai,Jufal,Tripurakot,Sunhoo,Pahada,Likhu (Dolpa)
192 Thuli Gad A 3.988Thuligad29o 19' 45"29o 20' 45"80o 24' 45"80o 27' 10" (Dadeldhura)
193 Thuli Gad B 4.800Thuligad29o 18' 00"29o 19' 25"80o 26' 50"80o 29' 00" (Dadeldhura)
194 Thulibheri 30.000Thuli Bheri28o 52' 22"28o 57' 10"82o 57' 27"83o 02' 28" (Dolpa)
195 Trishuli Khola 2.280Trishuli28o 05' 44"28o 07' 36"85o 17' 42"85o 19' 24" Dhunche (Rasuwa)
196 Upper Solu Khola Small 18.000Solu27o 31' 17"27o 32' 55"86o 34' 27"86o 35' 19" (Solukhumbu)
197 Upper Arun 335.000Arun27o 38' 24"27o 48' 09"87o 20' 00"87o 30' 00" Chepuwa,Hatiya (Sankhuwasabha)being studied by NEA under IDA assistance
198 Upper Badigad 5.000Badigad 28o 07' 00"28o 10' 00"83o 17' 20"83o 19' 40" (Gulmi)
199 Upper Bagmati 6.000Bagmati27o 32' 35"27o 35' 00"85o 14' 35"85o 16' 40" (Makawanpur)
200 Upper Balephi 15.000Balephi27o 58' 59"28o 01' 23"85o 46' 46"85o 48' 03" (Sindhupalchok)
201 Upper Budhi Gandaki Hydropower Project 254.000Budhi Gandaki28o 17' 18"28o 26' 25"84o 51' 58"84o 56' 56" Uiya,Kerauja,Sirdibas,Chunchet (Gorkha)
202 Upper Charnawati Khola 2.200Charnawati27o 39' 21"27o 40' 30"85o 59' 15"86o 01' 37" (Dolakha)
203 Upper Chepe HPP 11.000Chepe 28o 10' 57"28o 12' 30"84o 37' 30"84o 38' 12" Kharibot (Gorkha) Dudhpokhari (Lamjung)
204 Upper Chepe Khola 4.000Chepe28o 10' 39"28o 13' 00"84o 37' 26"84o 39' 05" (Lamjung)
205 Upper Chingad 3.200Chingad28o 34' 00"28o 35' 00"81o 46' 15"81o 47' 50" (Surkhet)
206 Upper Daram Khola- B HEP 5.650Daram28o 11' 57"28o 13' 03"83o 22' 45"83o 25' 25" Kandebas,Malm,Hatiya,Harichaur (Baglung)
207 Upper Daraudi 9.000Daraundi28o 08' 15"28o 11' 17"84o 41' 21"84o 43' 23" Ghyalchok,Simjung,Saurpani (Gorkha)
208 Upper Daraundi 9.218Daraundi28o 08' 15"28o 11' 17"84o 41' 21"84o 43' 23" (Gorkha)
209 Upper Deumai 9.800Deu Mai26o 54' 40"26o 57' 50"87o 46' 15"87o 48' 55" (Ilam)
210 Upper Dudh Khola 9.650Dudhkhola28o 33' 17"28o 35' 45"84o 23' 00"84o 25' 45" (Manang)
211 Upper Indrawati 4.000Indrawati27o 53' 16"27o 54' 32"85o 37' 00"85o 37' 35" Banskharka (Sindhupalchok)
212 Upper Ingwa Khola 9.700Ingwa27o 16' 46"27o 17' 20"87o 52' 22"87o 55' 20" (Taplejung)
213 Upper Jhimruk Storage Project 100.000Jhimruk28o 07' 30"28o 12' 30"82o 52' 30"83o 00' 00"As per Letter dated 2073-08-08 (Ch no 642, study division)
214 Upper Jogmai HPP 3.300Jogmai26o 56' 17"26o 57' 58"88o 02' 55"88o 05' 30" Naya Bazar (Ilam)
215 Upper Karnali B 60.000Karnali28o 57' 30"29o 05' 32"81o 24' 02"81o 30' 00"
216 Upper Katti Khola HPP 1.648Katti28o 46' 50"28o 47' 30"81o 48' 08"81o 50' 23" Katti,Pagnath,Room (Dailekh)
217 Upper Khoranga Khola HPP 6.800Khoranga27o 11' 24"27o 13' 59"87o 31' 20"87o 32' 30" Morahang (Terhathum)
218 Upper Khudi-A HPP 27.800Khudi28o 21' 50"28o 24' 20"84o 17' 08"84o 19' 36" Ghanpokhara,Khudi (Lamjung)Feasibility Study started from FY 2071/72, Coordinate amended as per 2073-8-8, study division.
219 Upper Lambu Khola 2.100Lambu27o 05' 17"27o 06' 11"87o 27' 50"87o 30' 51" (Terhathum)
220 Upper Lotikarnali 22.000Karnali29o 49' 35"29o 50' 52"82o 06' 23"82o 11' 22" Mimi (Humla)
221 Upper Madi - 0 38.000Madi28o 22' 00"28o 25' 30"84o 05' 30"84o 07' 30" (Kaski)
222 Upper Mai Khola 9.980Mai27o 01' 22"27o 03' 30"87o 56' 30"87o 58' 00" Maimajhuwa,Mabu,Sulubung (Ilam)
223 Upper Mailun Khola 14.300Mailung28o 05' 56"28o 08' 00"85o 11' 00"85o 13' 00" (Rasuwa)
224 Upper Maiwa 10.000Maiwa27o 22' 21"27o 25' 00"87o 31' 13"87o 33' 30"
225 Upper Maiwa Khola 10.000Maiwa27o 22' 21"27o 25' 00"87o 31' 13"87o 33' 30" (Taplejung)
226 Upper Maya Khola 3.098Maya27o 12' 54"27o 14' 31"87o 22' 26"87o 24' 15" Madi Mulkharka,Tamfok (Sankhuwasabha)
227 Upper Molun 4.000Molun27o 22' 04"27o 24' 16"86o 24' 13"86o 26' 40" (Okhaldhunga)
228 Upper Myagdi- 2 61.200Myagdi28o 33' 21"28o 38' 00"83o 21' 54"83o 25' 00" (Myagdi)
229 Upper Naugad 5.000Naugad29o 44' 24"29o 46' 10"80o 39' 33"80o 41' 10" (Darchula)
230 Upper Naugad 4.500Naugad29o 43' 19"29o 44' 24"80o 36' 06"80o 40' 00" Dethala,Dhuligada,Sikhar (Darchula)
231 Upper Panpu khola 6.750Panpu28o 37' 00"28o 39' 29"83o 36' 45"83o 40' 19" (Mustang)
232 Upper Pheme Khola 2.500Pheme 27o 07' 30"27o 08' 30"87o 48' 14"87o 50' 00" Nangeen,Ranitar (Panchthar)
233 Upper Puwa khola 2.000Puwa26o 58' 47"26o 59' 47"87o 53' 35"87o 54' 34" (Ilam)
234 Upper Rigdi Khola 4.000Rigdi27o 47' 30"27o 48' 38"84o 31' 33"84o 34' 06" Dahakhani,Chandi Bhanjyang (Chitawan)
235 Upper Rukum Gad 5.000Rukum Gad28o 36' 50"28o 38' 02"82o 37' 30"82o 39' 01" Kanda,Sobha (Rukum)
236 Upper Sawane -A 1.500Sawane28o 11' 15"28o 13' 00"83o 16' 45"83o 18' 15" (Baglung)
237 Upper Seti 80.000West Seti29o 45' 00"29o 50' 00"81o 15' 13"81o 18' 27" Kanda (Bajhang)
238 Upper Seti-1 HPP 21.000Seti28o 16' 38"28o 18' 40"83o 56' 01"83o 57' 50" Ghachok,Purachaur (Kaski)
239 Upper Tamor A 90.000Tamor27o 40' 00"27o 42' 05"87o 45' 00"87o 47' 51" Olangchung (Taplejung)
240 Yandeli Khola 2.730Yandeli27o 21' 32"27o 22' 20"87o 31' 30"87o 33' 30" (Taplejung)
241 Yanma Khola 9.500Yangma Khola27o 39' 31"27o 41' 31"87o 47' 52"87o 50' 00" (Taplejung)