| S No |
Project |
Capacity (MW) |
River |
Lic No |
Isuue Date |
Validity |
Promoter |
Address |
Latitiude N |
Longitude E |
VDC/District |
Remarks |
| 1 |
Dapcha Roshi Small |
5.000 |
Roshi |
178 |
2062-02-03 |
2067-02-02 |
L. K. Power Pvt. Ltd. (Niltara W&E Pvt. Ltd) |
Balkhu, Kathmandu,Nepal Ph: 4251506, 4332412 |
27o 30' 00" |
27o 31' 30" |
85o 39' 12" |
85o 43' 27" |
(Kabhrepalanchok) |
|
| 2 |
Jumdi Khola Small |
1.750 |
Jumdi |
181 |
2062-02-20 |
2067-02-19 |
Jumdi Hydropower Pvt. Ltd., |
Kathmandu, Phone 01-4494853 |
28o 01' 25" |
28o 02' 44" |
83o 26' 46" |
83o 27' 30" |
(Gulmi) |
|
| 3 |
Dudhkhola Small |
10.000 |
Dudhkhola |
183 |
2062-04-27 |
2066-05-23 |
Shwet Bhairab Power Supply P. LTD |
Ph4425793, POB5585 |
28o 31' 16" |
28o 33' 17" |
84o 21' 27" |
85o 23' 49" |
(Manang) |
|
| 4 |
Rudi Khola |
3.972 |
Rudi |
185 |
2062-05-06 |
2067-05-05 |
Asian Hydro Development P.Ltd |
4229223 |
28o 11' 54" |
28o 13' 19" |
84o 11' 44" |
84o 12' 52" |
(Kaski) |
|
| 5 |
Tadi Khola |
2.800 |
Tadi |
187 |
2062-07-27 |
2066-05-23 |
Hiraratna hydropower Pvt. Ltd |
Kathmandu -5, Ph no. 01-4220128 |
27o 55' 16" |
27o 57' 30" |
85o 22' 53" |
85o 24' 05" |
(Nuwakot) |
|
| 6 |
Upper Dordi Khola A |
4.000 |
Dordi |
191 |
2062-08-13 |
2064-08-12 |
Him Energy Group Pvt. Ltd |
Post Box 11123, Phone 01-4410214/4435600 |
28o 15' 00" |
28o 16' 49" |
84o 30' 00" |
84o 32' 36" |
(Lamjung) |
|
| 7 |
Madi-2 |
7.000 |
Madi |
192 |
2062-08-13 |
2063-08-12 |
Annapurna Group Pvt. Ltd. |
|
28o 12' 54" |
28o 13' 21" |
84o 06' 22" |
84o 07' 53" |
(Kaski) |
|
| 8 |
Mai Cascade |
8.000 |
Mai |
198 |
2062-10-19 |
2065-10-18 |
Sanima Hydropower Pvt. Ltd. |
|
26o 45' 43" |
26o 47' 40" |
87o 52' 02" |
87o 53' 09" |
(Ilam) |
|
| 9 |
Upper Mailung -A |
5.000 |
Mailung |
201 |
2062-10-25 |
2067-10-24 |
Energy Engineering Pvt. Ltd |
Ph 9851022085 |
28o 08' 00" |
28o 12' 30" |
85o 10' 00" |
85o 15' 00" |
(Rasuwa) |
|
| 10 |
Naugadh Gad |
8.500 |
Naugad |
202 |
2062-10-25 |
2066-05-23 |
Api Power Company Pvt. Ltd |
Phone 4417137 |
29o 41' 15" |
29o 43' 08" |
80o 36' 15" |
80o 36' 38" |
(Darchula) |
|
| 11 |
Upper Piluwa |
3.900 |
Piluwa |
209 |
2062-12-08 |
2065-05-23 |
Upper PiluwaKhola Hydropower Company |
|
27o 17' 00" |
27o 17' 58" |
87o 20' 55" |
87o 23' 45" |
(Sankhuwasabha) |
|
| 12 |
Pikhuwa Khola |
2.500 |
Pikhuwa |
213 |
2063-02-21 |
2066-05-23 |
Eastern Hydropower P Ltd |
Kathmandu, Phone 01-4495459 |
27o 08' 38" |
27o 10' 18" |
87o 01' 06" |
87o 02' 03" |
(Bhojpur) |
|
| 13 |
Upper Ingwa Khola |
9.700 |
Ingwa |
218 |
2063-03-12 |
2066-05-23 |
Ram Kumar Iwaram |
P.O.Box. 24697, Phone 9841487985 |
27o 16' 46" |
27o 17' 20" |
87o 55' 20" |
87o 52' 22" |
(Taplejung) |
|
| 14 |
Lower Tadi |
4.995 |
|
221 |
2063-03-12 |
2066-03-11 |
Buddha Bhumi Nepal Hydropower Co. Pvt. ltd. |
Babar Mahal Kathmandu, Phone 01-4225281 |
27o 55' 05" |
27o 55' 40" |
85o 21' 08" |
85o 22' 50" |
|
|
| 15 |
Upper Seti-1 |
9.900 |
Seti |
227 |
2063-03-25 |
2066-03-24 |
Seti Hydropower Development Company Pvt. Ltd. |
|
28o 16' 38" |
28o 18' 16" |
83o 56' 01" |
83o 57' 18" |
(Kaski) |
|
| 16 |
Upper Hugdi |
2.625 |
Hugdi |
228 |
2063-03-26 |
2066-03-25 |
Ruru Jalbidyut Paroyojna Pvt. Ltd |
P.O. Box 5498, Kathmandu, Nepal, Phone 01-4413100 |
28o 05' 00" |
28o 06' 00" |
83o 23' 17" |
83o 25' 17" |
(Gulmi) |
|
| 17 |
Hugdi |
2.500 |
Hugdi |
230 |
2063-03-26 |
2065-09-25 |
Shankar Pandey |
Pokhara - 9, Kaski, Nepal |
28o 03' 16" |
28o 05' 00" |
83o 20' 55" |
83o 23' 21" |
(Gulmi) |
|
| 18 |
Chingad Khola |
4.800 |
Chingad |
231 |
2063-05-26 |
2066-05-25 |
Shashi Gagan Hydropower |
Kathmandu, Phone 01-6219566, Fax 01-4373020 |
28o 33' 09" |
28o 34' 38" |
81o 44' 07" |
81o 45' 57" |
(Surkhet) |
|
| 19 |
Down Piluwa |
9.500 |
Piluwa |
232 |
2063-05-26 |
2066-05-25 |
River Falls Hydropower Development Company P. Ltd. |
P.O.Box, 23892, Kathmandu, Phone 01-4477502 |
27o 14' 30" |
27o 15' 00" |
87o 16' 00" |
87o 18' 10" |
Baneswor,Ankhibhui,Mamling (Sankhuwasabha) |
|
| 20 |
Lower Khare |
4.400 |
Khare |
234 |
2063-06-26 |
2065-06-25 |
Universal Power Company P. Ltd |
Biratnagar 6, Bhrikutichowk, Morang, Nepal |
27o 45' 00" |
27o 45' 53" |
86o 11' 20" |
86o 13' 27" |
(Dolakha) |
|
| 21 |
Upper Nyadi |
10.000 |
Nyadi |
244 |
2063-06-27 |
2064-12-26 |
Purna Bahadur Gurung |
P.O. Box: 12566, Ph: 4441577 |
28o 21' 36" |
28o 24' 26" |
84o 26' 57" |
84o 30' 18" |
(Lamjung) |
|
| 22 |
Rawa Khola |
3.000 |
Rawa |
237 |
2063-06-31 |
2065-05-23 |
Dudha Koshi Power Company P. Ltd |
P.O. Box: 8973 N.P.C. 585 Naya Baneshwar, Kathmandu, Nepal. Ph: 4493790 |
27o 17' 13" |
27o 19' 27" |
86o 42' 55" |
86o 46' 05" |
(Khotang) |
|
| 23 |
Lower Ankhu |
5.000 |
Aankhu |
239 |
2063-06-31 |
2064-12-30 |
Thakur Prasad Kandel |
VDC Benighat-8, Dhading, Nepal |
28o 00' 57" |
28o 04' 42" |
84o 55' 32" |
84o 59' 30" |
(Dhading) |
|
| 24 |
Mel Khola |
1.050 |
Mel |
240 |
2063-06-31 |
2064-06-30 |
People Energy and Environment Development Association (PEEDA) |
Ekantakuna, Lalitpur, Nepal. Ph: 5530337, P.O. Box: 12269 |
27o 41' 25" |
27o 42' 49" |
85o 02' 40" |
85o 05' 45" |
(Makawanpur) |
|
| 25 |
Puwa-Jhutre |
2.000 |
Puwa |
246 |
2063-08-05 |
2066-05-23 |
Tenzin Jampe Lama |
P.O. Box: 3970, Ph: 5524868 |
26o 56' 51" |
26o 58' 46" |
87o 53' 00" |
87o 55' 00" |
(Ilam) |
|
| 26 |
Midim Khola |
3.400 |
Midim |
248 |
2063-08-05 |
2066-02-04 |
Midim Hydropower P. Ltd |
P.O. Box: 8975, EPC 4119, Ph: 4378938 |
28o 15' 00" |
28o 19' 00" |
84o 15' 00" |
84o 17' 00" |
(Lamjung) |
|
| 27 |
Lower Hewa |
8.000 |
Hewa |
250 |
2063-08-08 |
2065-08-07 |
Mountain Hydro Nepal (P.) Ltd |
P.O. Box: 8973, E.C.P 528, New Baneshwor, Kathmandu, Nepal. Ph: 4498097, Fax: 4469226 |
27o 09' 02" |
27o 10' 10" |
87o 44' 15" |
87o 46' 10" |
(Panchthar) |
|
| 28 |
Nyasim Khola |
5.000 |
Nyasim |
252 |
2063-08-10 |
2066-02-09 |
Energy and Hydropower Services P. Ltd |
P.O.Box:7117, Ph: 4278586, Fax: 4481306 |
27o 57' 30" |
27o 59' 30" |
85o 47' 30" |
85o 49' 30" |
(Sindhupalchok) |
|
| 29 |
Mai Small Cascade |
2.100 |
Mai |
253 |
2063-08-10 |
2065-08-09 |
Himal Dolakha Hydropower Co. Ltd |
P.O. Box: 12268, Ph: 5000033 |
26o 51' 39" |
26o 52' 36" |
87o 54' 43" |
87o 56' 11" |
(Ilam) |
|
| 30 |
Daraundi Khola |
1.700 |
Daraundi |
255 |
2063-08-17 |
2066-01-16 |
Om Prasad Bhattarai |
Samakhusi, Kathmandu, Nepal. Ph: 4360076 |
28o 06' 29" |
28o 08' 13" |
84o 39' 43" |
84o 41' 33" |
(Gorkha) |
|
| 31 |
Puwa Khola-1 |
1.600 |
Puwa |
256 |
2063-08-17 |
2066-01-16 |
Sandya Gurung |
Pokhara, P.O. Box: 20762, Kaski, Nepal. Ph: 4370285. Fax: 4426265 |
26o 55' 00" |
26o 56' 50" |
87o 53' 46" |
87o 55' 00" |
(Ilam) |
|
| 32 |
Upper Mailun Khola |
9.500 |
Mailung |
258 |
2063-09-10 |
2066-05-23 |
Molinia Power P. Ltd |
Anamnagar, Kathmandu, Nepal. Ph: 4268182 |
28o 05' 00" |
28o 08' 00" |
85o 11' 00" |
85o 13' 00" |
(Rasuwa) |
|
| 33 |
Upper Chauri Khola |
3.160 |
Chauri |
263 |
2063-09-24 |
2065-09-23 |
Himalayan Water Resources & Energy Development Co. P. Ltd |
P.O. Box:2919, Tel: 4483152 |
27o 34' 18" |
27o 35' 55" |
85o 49' 33" |
85o 51' 59" |
(Kabhrepalanchok) |
|
| 34 |
Buku Khola |
3.300 |
Buku |
267 |
2063-10-03 |
2065-04-02 |
Appolo Hydropower P. Ltd |
P.O. Box: 20762, Ph: 2021794, 9841519361 |
27o 30' 15" |
27o 31' 15" |
86o 20' 00" |
86o 23' 57" |
(Solukhumbu) |
|
| 35 |
Prajuli Khola |
2.300 |
Prajuli |
268 |
2063-10-03 |
2065-05-23 |
Chaitanya Hydropower Co. P. Ltd |
P.O. Box: 14165, Ph: 4372176, Fax: 4373021 |
28o 43' 14" |
28o 45' 28" |
81o 39' 08" |
81o 41' 54" |
(Dailekh) |
|
| 36 |
Midim Khola |
3.000 |
Midim |
270 |
2063-10-03 |
2066-04-25 |
Union Hydropower P.Ltd |
P.O.B. No: 9536, Ph: 061-524491, 526254 |
28o 10' 53" |
28o 12' 15" |
84o 16' 31" |
84o 17' 30" |
Karapu (Lamjung) |
|
| 37 |
Lower Roshi Khola Small |
4.700 |
Roshi |
275 |
2063-12-19 |
2065-12-14 |
Baba Baidya Nath Hydropower P. Ltd |
Ph: 2023052 |
27o 26' 10" |
27o 27' 15" |
85o 46' 33" |
85o 48' 39" |
(Kabhrepalanchok) |
|
| 38 |
Lower Mai-II |
2.000 |
Mai |
276 |
2063-12-26 |
2065-12-25 |
Himal Hydro and General Construction Ltd |
P.O. Box: 12268, Ph: 01-5000033 |
26o 50' 25" |
26o 51' 39" |
87o 54' 21" |
87o 55' 05" |
(Ilam) |
|
| 39 |
Chhandi Khola |
1.189 |
Chhandi |
277 |
2063-12-26 |
2065-12-25 |
Lal Bahadur Thapa |
Ph: 016205090, 9851068697 |
28o 15' 12" |
28o 16' 48" |
84o 28' 08" |
84o 29' 20" |
(Lamjung) |
|
| 40 |
Upper Tadi |
5.000 |
Tadi |
278 |
2063-12-27 |
2065-12-26 |
Surya Kund Hydro Electric Pvt. Ltd. |
Anam Nagar Kathmandu, Phone 01-4770245, 01-4771285 Fax 01-4771109 |
27o 57' 50" |
27o 59' 03" |
85o 25' 09" |
85o 27' 00" |
(Nuwakot) |
|
| 41 |
Sardi Khola |
3.500 |
Sardi |
279 |
2063-12-27 |
2065-12-26 |
Mandakini Hydropower Pvt. Ltd. (Pusparaj Paudel) |
Baneswor Kathmandu, P.O.Box 4970, Phone 01-4461574 |
28o 20' 00" |
28o 22' 00" |
83o 58' 30" |
84o 01' 45" |
(Kaski) |
|
| 42 |
Lohare Khola |
4.500 |
Lohore |
280 |
2063-12-28 |
2064-12-27 |
Jaipee Hydro Company P. Ltd. |
|
28o 45' 30" |
28o 48' 04" |
81o 39' 02" |
81o 41' 25" |
(Dailekh) |
|
| 43 |
Upper Hewa khola |
10.000 |
Hewa |
283 |
2064-01-23 |
2064-12-30 |
NEA |
|
27o 09' 37" |
27o 10' 56" |
87o 46' 31" |
87o 48' 56" |
(Panchthar) |
|
| 44 |
Jogmai Khola |
2.400 |
Jogmai |
|
2064-08-21 |
2065-08-20 |
Palden Kaji |
Naxal, Kathmandu, Nepal. Ph: 444702, 4410677, Fax: 4410750 |
26o 54' 40" |
26o 55' 07" |
88o 01' 09" |
88o 03' 06" |
(Ilam) |
|
| 45 |
Likhu Khola |
4.800 |
Likhu |
|
2064-08-21 |
2065-08-20 |
Pancha Pokhari Hydropower Co. P. Ltd |
Tinkune. P.O.Box: 3086, Kathmandu, Nepal. Ph: 4483652 |
27o 31' 18" |
27o 32' 02" |
86o 21' 05" |
86o 21' 14" |
(Ramechhap) |
|
| 46 |
Siprin Khola |
9.600 |
Sipring |
|
2064-08-24 |
2065-08-23 |
Synergy Power Development P. Ltd. |
|
27o 48' 38" |
27o 49' 39" |
86o 13' 47" |
86o 15' 18" |
(Dolakha) |
|
| 47 |
Hugdi Khola |
1.250 |
Hugdi |
|
2064-08-25 |
2065-08-24 |
B.S.B. Energy P. Ltd |
Pokhara Municipality-9, P.O.Box: 170, Nepal. Ph: 061-530028, 9841416948 |
26o 06' 13" |
28o 07' 44" |
83o 24' 50" |
83o 25' 40" |
(Gulmi) |
|
| 48 |
Tadi Khola |
3.500 |
Tadi |
|
2064-08-25 |
2065-08-24 |
Aadi Shakti Bidhut Bikash Co. P. Ltd |
P.O. Box: 897, Ph: 01-4219731 |
27o 55' 00" |
27o 55' 56" |
85o 19' 15" |
85o 21' 08" |
(Nuwakot) |
|
| 49 |
Dotigad |
3.829 |
Dotigad |
|
2064-08-25 |
2065-08-24 |
Niranjan Raj Kandel |
Maitidevi, Kathmandu, Nepal. Ph:01-4430771, 9851070487, Fax: 4440817 |
29o 17' 37" |
29o 18' 20" |
80o 29' 21" |
80o 30' 30" |
(Dadeldhura) |
|
| 50 |
Madi-Bhorletar |
9.000 |
Madi |
|
2064-08-27 |
2066-08-26 |
Kalash Hydropower P. Ltd |
Sanobharyang, Kathmandu, Nepal.Ph: 9841515319 |
28o 07' 30" |
28o 10' 21" |
84o 12' 30" |
84o 14' 04" |
(Kaski) |
|
| 51 |
Khorunga Khola |
2.000 |
Khoranga |
|
2064-08-27 |
2065-08-26 |
Reliable Hydropower Company. P. Ltd |
P.O. Box: 8975 EPC 2455, Kathmandu, Nepal. Ph: 4222714, 9851026267 |
27o 08' 19" |
27o 10' 45" |
87o 32' 03" |
87o 33' 20" |
(Terhathum) |
|
| 52 |
Siddhi Khola |
5.000 |
Siddhi |
|
2064-08-27 |
2065-08-26 |
Lumbini Builders P. Ltd |
New Baneshwor, Kathmandu, Nepal. Ph: 4474930, 4464306 |
26o 49' 39" |
26o 50' 43" |
88o 08' 00" |
88o 09' 50" |
(Ilam) |
|
| 53 |
Middle Modi |
4.880 |
Modi |
294 |
2064-08-27 |
2067-08-26 |
Middle Modi Hydropower Limited |
Lalitpur, P.O.Box: 12268, Nepal. Ph:5535032, Fax:5550212 |
28o 17' 20" |
28o 18' 29" |
83o 45' 00" |
83o 47' 08" |
(Parbat) |
|
| 54 |
Phalakhu |
2.400 |
Phalakhu |
|
2064-09-11 |
2065-09-10 |
Bisam Rimal |
Ralkadevi VDC Ward No 7 Nuwakot, Nepal. Ph 01-4880042 |
27o 58' 11" |
28o 00' 00" |
85o 15' 22" |
85o 16' 14" |
(Rasuwa) |
|
| 55 |
Bagmati Nadi |
5.000 |
Bagmati |
|
2064-10-15 |
2065-10-14 |
Mandu Hydropower Pvt. Ltd. |
|
27o 30' 20" |
27o 32' 30" |
85o 13' 43" |
85o 15' 20" |
(Makawanpur) |
|
| 56 |
Upallo Khimti |
5.000 |
Khimti |
|
2064-10-15 |
2065-10-14 |
Himalaya Energy Development Company Pvt. Ltd |
G.P.O. Box: 10429 Ph: 4487794 |
27o 39' 24" |
27o 41' 54" |
86o 19' 20" |
86o 21' 40" |
(Ramechhap) |
|
| 57 |
Nupche - Likhu |
5.400 |
Likhu |
|
2064-10-27 |
2067-10-26 |
Sandip Gyawali |
Amuwa VDC 3, Rupendehi, Nepal |
27o 40' 09" |
27o 42' 09" |
86o 26' 41" |
86o 29' 06" |
(Ramechhap) |
|
| 58 |
Upper Maiwa Khola |
10.000 |
Maiwa |
|
2064-11-12 |
2065-11-13 |
Gaurav Bhattarai |
New Baneswor, Kathamandu 10, Nepal. 9841253698 |
27o 22' 21" |
27o 25' 00" |
87o 31' 13" |
87o 33' 30" |
(Taplejung) |
|
| 59 |
Upper Daraundi |
1.560 |
Daraundi |
313 |
2064-11-12 |
2065-11-13 |
Bisnu K.C |
Kathmandu, P.O. Box 8643, P.No. 014314683 |
28o 10' 25" |
28o 11' 22" |
84o 42' 40" |
84o 43' 11" |
(Gorkha) |
|
| 60 |
Sabha Khola |
3.300 |
Sabha |
|
2064-11-24 |
2067-11-22 |
Dibyaswari Hydropower P Ltd |
Kathmandu, Phone 014496681, 014495550 |
27o 23' 19" |
27o 24' 12" |
87o 16' 23" |
87o 17' 35" |
(Sankhuwasabha) |
|
| 61 |
Bimdang Khola |
6.850 |
Bimdang |
|
2064-11-26 |
2065-11-25 |
Marsyangdi Group Pvt. Ltd |
P. O. Box 2430 P.No. 015525576 |
28o 33' 17" |
28o 38' 00" |
84o 25' 45" |
84o 28' 00" |
(Manang) |
|
| 62 |
Suti Khola |
3.650 |
Suti |
|
2064-11-26 |
2065-11-25 |
Marsyangdi Group Pvt. Ltd |
P. O. Box 2430 P.No. 015525575 |
28o 35' 45" |
28o 38' 00" |
84o 23' 00" |
84o 25' 45" |
(Manang) |
|
| 63 |
Upper Dudh Khola |
9.650 |
Dudhkhola |
|
2064-11-26 |
2065-11-25 |
Marsyangdi Group Pvt. Ltd |
P. O. Box 2430 P.No. 015525574 |
28o 33' 17" |
28o 35' 45" |
84o 23' 00" |
84o 25' 45" |
(Manang) |
|
| 64 |
Tugun Khola |
2.000 |
Tugun |
|
2064-11-28 |
2065-11-27 |
Pashupati Energy Development Company Pvt. Ltd |
Baluwatar Kathmandu, P.O.Box 8975,Ph 01-4417219 |
27o 29' 15" |
27o 29' 50" |
85o 18' 20" |
85o 19' 53" |
(Lalitpur) |
|
| 65 |
Middle Super Daraudi |
4.480 |
Daraundi |
|
2064-11-28 |
2065-11-27 |
Rajendra Karki |
Kathmandu, P.O.Box 8643 |
28o 11' 35" |
28o 13' 23" |
84o 43' 20" |
84o 44' 07" |
(Gorkha) |
|
| 66 |
Daraundi - 1 |
2.230 |
Daraundi |
|
2064-11-28 |
2065-11-27 |
Rajendra Karki |
Kathmandu, P.O.Box 8643 |
28o 08' 15" |
28o 09' 52" |
84o 41' 30" |
84o 42' 25" |
(Gorkha) |
|
| 67 |
Khani Khola |
4.000 |
Khani |
310 |
2064-11-28 |
2065-11-27 |
Pashupati Energy Development Company Pvt. Ltd |
Baluwatar Kathmandu, P.O.Box 8975,Ph 01-4417220 |
27o 29' 10" |
27o 29' 44" |
85o 17' 02" |
85o 18' 20" |
(Lalitpur) |
|
| 68 |
Middle Gaddi Gad |
3.500 |
Gaddigad |
314 |
2064-11-29 |
2067-11-28 |
Triyog Energy & Development P. Ltd. |
P.O.Box 8975, EPC 5453, Kathmandu |
29o 15' 20" |
29o 16' 40" |
81o 03' 00" |
81o 03' 44" |
(Doti) |
|
| 69 |
Chepe Khola |
2.978 |
Chepe |
|
2064-12-11 |
2065-12-10 |
Gorkha Power Co. Pvt. Ltd |
Min Bhawan Kathmandu, Phone 014483002 |
28o 03' 43" |
28o 05' 26" |
84o 29' 00" |
84o 31' 05" |
(Gorkha) |
|
| 70 |
Upper Panpu khola |
5.000 |
Panpu |
|
2064-12-11 |
2065-12-10 |
Dibash Bahadur Basnet |
Thamel Kathmandu, P.O.Box 3840 |
28o 37' 00" |
28o 39' 30" |
83o 36' 45" |
83o 39' 15" |
(Mustang) |
|
| 71 |
Rupse Khola |
1.570 |
Rupse |
|
2064-12-17 |
2065-12-16 |
Research & Development Group |
Buddha Nagar Kathmandu, Phone 014780675 |
28o 32' 30" |
28o 33' 30" |
83o 37' 18" |
83o 39' 08" |
(Myagdi) |
|
| 72 |
Upper Khimti II |
3.000 |
Khimti |
|
2064-12-17 |
2065-12-16 |
Himalaya Urja Bikas Co. Pvt. Ltd. |
Balkot-2 Bhaktapur, Phone 016632822 |
27o 38' 20" |
27o 39' 55" |
86o 18' 10" |
86o 20' 10" |
(Ramechhap) |
|
| 73 |
Lower Balephi |
4.990 |
Balephi |
|
2065-01-06 |
2065-01-05 |
Welcome Energy Development Company Pvt. Ltd |
|
27o 45' 39" |
27o 48' 23" |
85o 44' 45" |
85o 46' 41" |
(Sindhupalchok) |
|
| 74 |
Upper Hewa khola |
3.600 |
Hewa |
|
2065-01-13 |
2066-01-12 |
Barun Hydropower Development Co. Pvt.Ltd |
Maharajganj Kathmandu, P. O. Box 14166 |
27o 19' 34" |
27o 20' 55" |
87o 20' 45" |
87o 22' 30" |
(Sankhuwasabha) |
|
| 75 |
Upper Piluwa 1 |
3.000 |
Piluwa |
|
2065-01-18 |
2066-01-17 |
Barun Hydropower Development Co. Pvt.Ltd |
Maharajganj Kathmandu, P. O. Box 14165, Phone- 622064 |
27o 17' 40" |
27o 18' 19" |
87o 24' 20" |
87o 26' 20" |
(Sankhuwasabha) |
|
| 76 |
Sakhuwa Khola |
10.000 |
Sakhuwa |
|
2065-01-24 |
2066-01-23 |
Lander Power Project Pvt. Ltd. |
|
27o 26' 47" |
27o 28' 39" |
87o 05' 00" |
87o 08' 30" |
(Sankhuwasabha) |
|
| 77 |
Madi Khola |
3.600 |
Madi |
|
2065-01-24 |
2066-01-23 |
Rapti Hydropower Pvt. Ltd. |
Kathmandu |
28o 22' 45" |
28o 23' 50" |
82o 30' 50" |
82o 32' 30" |
(Rolpa) |
|
| 78 |
Ghalemdi Khola |
10.000 |
Ghalendi |
|
2065-02-02 |
2066-02-01 |
Shyam Sunder Khetan |
|
28o 31' 00" |
28o 33' 00" |
83o 42' 00" |
83o 45' 00" |
(Myagdi) |
|
| 79 |
Chiuragad |
2.800 |
Chiuragad |
|
2065-02-02 |
2066-02-01 |
Rapti Construction Co. Pvt. Ltd. |
Rolpa |
28o 23' 24" |
28o 24' 28" |
82o 28' 46" |
82o 30' 50" |
(Rolpa) |
|
| 80 |
Sabha Khola A |
8.000 |
Sabha |
|
2065-02-09 |
2066-02-08 |
Deepsabha Hydropower Pvt. Ltd. |
Old Baneshwor Kathmandu |
27o 21' 36" |
27o 23' 18" |
87o 14' 00" |
87o 17' 00" |
(Sankhuwasabha) |
|
| 81 |
Panagad Khola |
1.200 |
Panagad |
|
2065-02-09 |
2066-02-08 |
Panagad Khola Bidyut Bikas Company |
P. O. Box 12794, Phone No. 01-4476859, New Baneshwor Kathmandu |
28o 05' 22" |
28o 05' 54" |
83o 09' 54" |
83o 11' 44" |
(Gulmi) |
|
| 82 |
Tallo Bagmati |
2.570 |
Bagmati |
|
2065-02-09 |
2066-02-08 |
Binitmani Upadhyay |
Kathmandu |
27o 29' 35" |
27o 30' 18" |
85o 14' 02" |
85o 15' 13" |
(Makawanpur) |
|
| 83 |
Hima Khola |
4.700 |
Hima |
|
2065-02-09 |
2066-02-08 |
Rabin Pradhan, Sarlahi & Babu Krishna Bhandari |
Gorkha |
29o 12' 00" |
29o 15' 00" |
81o 54' 30" |
81o 57' 25" |
(Jumla) |
|
| 84 |
Mai Khola A |
2.500 |
Mai |
|
2065-02-09 |
2066-02-08 |
Kabita Joshi |
P. O. Box. 25078 Kathmandu |
26o 56' 30" |
26o 57' 30" |
87o 56' 47" |
87o 57' 33" |
(Ilam) |
|
| 85 |
Mathillo Aankhu Khola |
9.200 |
Aankhu |
|
2065-02-09 |
2066-02-08 |
Khedimaya Tamang & Chaturman Tamang Baneshwor Kathmandu |
Baneshwor Kathmandu |
28o 07' 00" |
28o 10' 00" |
85o 00' 00" |
85o 03' 30" |
(Dhading) |
|
| 86 |
Radhi Small |
4.400 |
Radhi |
341 |
2065-02-09 |
2066-02-08 |
Radhi Bidyut Co. Ltd |
P.O.Box 5926, Phone-014427013 |
28o 23' 48" |
28o 24' 30" |
84o 24' 34" |
84o 25' 45" |
(Lamjung) |
|
| 87 |
Siwan Khola |
1.720 |
Siwan |
|
2065-02-10 |
2066-02-09 |
Achyut Karki |
P. O. Box 8643, Phone No. 9856026678 |
28o 16' 36" |
28o 17' 30" |
82o 33' 57" |
82o 34' 56" |
(Rolpa) |
|
| 88 |
Poldumki Khola |
1.600 |
Poldumki |
|
2065-02-10 |
2066-02-09 |
Muktishri Pvt. Ltd |
P. O. Box 12557, Phone no 01-4268572,Thapathali Kathmandu |
27o 29' 30" |
27o 30' 33" |
85o 04' 43" |
85o 06' 00" |
(Makawanpur) |
|
| 89 |
Roshi Khola |
3.000 |
Roshi |
|
2065-02-21 |
2066-02-20 |
Primier Power Pvt. Ltd |
P.O.Box. 5152, Kathmandu |
27o 32' 45" |
27o 34' 00" |
85o 31' 30" |
85o 34' 00" |
(Kabhrepalanchok) |
|
| 90 |
Upper Lambu Khola |
2.100 |
Lambu |
|
2065-02-21 |
2066-02-20 |
Yagya Prasad Subedi |
Old Baneswor Kathmandu, Phone 9851087614 |
27o 05' 17" |
27o 06' 11" |
87o 27' 50" |
87o 30' 51" |
(Terhathum) |
|
| 91 |
Ghalemdi Khola |
1.900 |
Ghalendi |
|
2065-02-21 |
2066-02-20 |
Simat Power development Co. Pvt. Ltd |
P.O.Box 3953, Lalitpur |
28o 31' 30" |
28o 32' 30" |
83o 40' 30" |
83o 42' 00" |
(Myagdi) |
|
| 92 |
Mai Khola B |
3.000 |
Mai |
|
2065-02-21 |
2066-02-20 |
Manju Kumari Gupta |
P.O.Box 12455, Kathmandu, Phone 9841233128 |
26o 53' 09" |
26o 55' 14" |
87o 56' 38" |
87o 57' 25" |
(Ilam) |
|
| 93 |
Roshi Khola & Ladku Khola |
3.000 |
Roshi |
|
2065-02-21 |
2066-02-20 |
Premier Power PVT Ltd |
|
27o 27' 34" |
27o 32' 30" |
85o 32' 30" |
85o 33' 30" |
(Kabhrepalanchok) |
|
| 94 |
Upper Deumai |
3.700 |
Deu Mai |
|
2065-02-21 |
2066-02-20 |
Krishna Prashad Sapkota |
P.O.Box 8973 NPC 763, Kathamandu |
26o 54' 40" |
26o 57' 50" |
87o 46' 15" |
87o 48' 55" |
(Ilam) |
|
| 95 |
Tanchhahara Small |
1.130 |
Tanchhahara |
|
2065-02-21 |
2066-02-20 |
Krishna Lal Gauchan |
P.O.Box 683, Bansabari Kathmandu |
28o 39' 51" |
28o 41' 14" |
83o 35' 00" |
83o 35' 59" |
(Mustang) |
|
| 96 |
Yandeli Khola |
2.730 |
Yandeli |
|
2065-02-21 |
2066-02-20 |
Sikhar Hydropower Co. Pvt. Ltd |
P.O.Box 8974, NPC 029, Old Baneswor Kathmandu |
27o 21' 32" |
27o 22' 20" |
87o 31' 30" |
87o 33' 30" |
(Taplejung) |
|
| 97 |
Daraundi-1 |
1.500 |
Daraundi |
|
2065-02-22 |
2066-02-21 |
Dimond Hydropower Pvt. Ltd |
P.O.Box 8975, EPC 1617 |
28o 03' 09" |
28o 06' 10" |
84o 38' 52" |
84o 40' 00" |
(Gorkha) |
|
| 98 |
Rigdi Khola |
1.940 |
Rigdi |
|
2065-02-24 |
2066-02-23 |
Niltara W & E Pvt. Ltd |
Balkhu Kathmandu |
27o 48' 00" |
27o 49' 00" |
84o 30' 30" |
84o 31' 30" |
Dahakhani (Chitwan) |
|
| 99 |
Ruru Banchu - 1 |
3.500 |
Ruru Banchu |
|
2065-02-26 |
2066-02-25 |
Narayan Prasad Banjade |
P.O.Box 8003, Kathmandu |
29o 05' 32" |
29o 06' 37" |
81o 45' 54" |
81o 48' 56" |
(Kalikot) |
|
| 100 |
Ruru Banchu Khola- 2 |
3.000 |
Ruru Banchu |
|
2065-02-26 |
2066-02-25 |
Bharat Raj Sharma |
P.O.Box 8003, Kathmandu |
29o 05' 49" |
29o 06' 39" |
81o 43' 21" |
81o 45' 44" |
(Kalikot) |
|
| 101 |
Madkyu Khola |
5.000 |
Madkyu |
|
2065-03-02 |
2066-03-01 |
Silles Hydropower Pvt.Ltd |
P.O.Box. 170, Lekhnath Nagar Palika - 3, Kaski, Phone 061-560236, Fax 061-532466 |
28o 21' 40" |
28o 22' 50" |
84o 07' 31" |
84o 09' 20" |
(Kaski) |
|
| 102 |
Taman Khola |
3.500 |
Taman |
|
2065-03-02 |
2066-03-01 |
Dilli Raj Bhusal |
P.O.Box. 3280, Kathmandu |
28o 20' 00" |
28o 21' 17" |
83o 10' 00" |
83o 11' 03" |
(Baglung) |
|
| 103 |
Upper Gaddi Gad |
3.850 |
Gaddigad |
|
2065-03-17 |
2066-03-16 |
Kalanga Hydro Pvt.Ltd |
P.O.Box 19607, Kathmandu |
29o 16' 45" |
29o 18' 50" |
81o 03' 20" |
81o 06' 25" |
(Doti) |
|
| 104 |
Upper Mai -C |
4.250 |
Mai |
|
2065-03-17 |
2066-03-16 |
East Nepal Development Endeavour Pvt. Ltd |
P.O.Box 24195, Kathmandu |
27o 00' 00" |
27o 01' 21" |
87o 57' 37" |
87o 58' 09" |
(Ilam) |
|
| 105 |
Upper Molun |
4.000 |
Molun |
|
2065-03-17 |
2066-03-16 |
Hydroventur Pvt. Ltd. |
Galphutar Kathmandu |
27o 22' 04" |
27o 24' 16" |
86o 24' 13" |
86o 26' 40" |
(Okhaldhunga) |
|
| 106 |
Rudi A |
6.800 |
Rudi |
365 |
2065-03-20 |
2067-03-19 |
Bindhabasini Hydropower Developmwnt Company Pvt.Ltd |
Srijana Chok Pokhara, Phone 061-533225 |
28o 15' 01" |
28o 17' 30" |
84o 11' 00" |
84o 13' 00" |
(Kaski) |
|
| 107 |
Lower Surnayagad |
5.000 |
Surnyagad |
|
2065-03-23 |
2066-03-22 |
Rudra Prasad Dahal, Sakti Pratap Singh, Shiv Raj Dahal, Raju Sinkhada and Bisnu Prasad Panthi |
Phone 01-4230888 |
29o 24' 40" |
29o 26' 25" |
80o 28' 00" |
80o 30' 15" |
(Baitadi) |
|
| 108 |
Junbeshi |
2.850 |
Junbeshi |
|
2065-03-23 |
2066-03-22 |
Dobhan Hydropower Pvt.Ltd. |
|
27o 33' 15" |
27o 35' 08" |
86o 32' 40" |
86o 34' 29" |
(Solukhumbu) |
|
| 109 |
Upper Bagmati |
6.000 |
Bagmati |
368 |
2065-03-25 |
2066-03-24 |
Multi Infrastructure Development Company Pvt.Ltd. |
Kathmandu, Phone 01-4411968 |
27o 32' 35" |
27o 35' 00" |
85o 14' 35" |
85o 16' 40" |
(Makawanpur) |
|
| 110 |
Kabeli B - 1 |
9.800 |
Kabeli |
|
2065-03-30 |
2066-03-29 |
Arun Valley Hydropower Development Co. P. Ltd. |
Baneshwor, Ktm, P.O. Box: 11039, Ph: 4475234, Fax: 4474896 |
27o 16' 23" |
27o 17' 13" |
87o 47' 00" |
87o 50' 10" |
(Panchthar) |
|
| 111 |
Nyam Nyam |
1.280 |
Nyam Nyam |
|
2065-03-30 |
2066-03-29 |
Tudi Power Company Pvt.Ltd. |
Phone 01-4272383 |
28o 04' 15" |
28o 05' 10" |
85o 10' 46" |
85o 12' 40" |
(Rasuwa) |
|
| 112 |
Igdigad |
4.610 |
Igdigad |
|
2065-04-14 |
2066-04-13 |
Gautam Subedi |
Thakre VDC - 2, Dhading, Phone 9851084172 |
29o 18' 08" |
29o 20' 44" |
81o 15' 00" |
81o 16' 15" |
(Achham) |
|
| 113 |
Lower Jogmai Khola |
1.600 |
Jogmai |
|
2065-04-16 |
2066-04-15 |
Yanchen Doma Lama |
P.O.Box 3970 Kathmandu, Phone 01-5524867 |
26o 52' 55" |
26o 54' 16" |
87o 57' 26" |
88o 00' 00" |
(Ilam) |
|
| 114 |
Lower Khorunga |
2.800 |
Khoranga |
|
2065-04-16 |
2066-04-15 |
IDS Energy Pvt. Ltd |
P.O.Box 516 Khumaltar Lalitpur |
27o 07' 30" |
27o 08' 19" |
87o 32' 30" |
87o 34' 32" |
(Terhathum) |
|
| 115 |
Upper Chingad |
3.800 |
Chingad |
381 |
2065-04-16 |
2066-04-15 |
Jalvidhyut Network Pvt. Ltd |
New Baneswor Kathmandu, Phone 01-4782339 |
28o 34' 00" |
28o 35' 00" |
81o 46' 15" |
81o 47' 50" |
(Surkhet) |
|
| 116 |
Phalakhu Khola |
5.000 |
Phalakhu |
|
2065-04-28 |
2066-04-27 |
Betrabati hydro Electric Co. Pvt. Ltd |
P.O.Box 8003 Kathmandu, Phone 01-4216573 |
28o 00' 47" |
28o 01' 46" |
85o 16' 10" |
85o 18' 19" |
(Rasuwa) |
|
| 117 |
Nisi Khola |
2.000 |
Nisi |
|
2065-04-28 |
2066-04-27 |
Damoder Bhusal |
P.O.Box 3280 Kathmandu, Phone 9851090749 |
28o 19' 11" |
28o 20' 00" |
83o 07' 30" |
83o 09' 38" |
(Baglung) |
|
| 118 |
Badigad -A |
5.000 |
Badigad |
|
2065-04-28 |
2066-04-27 |
Hari Prasad Acharya |
P.O.Box. 3280, Dhapasi Kathmandu |
28o 13' 41" |
28o 15' 43" |
83o 11' 47" |
83o 14' 19" |
(Baglung) |
|
| 119 |
Badigad |
7.000 |
Badigad |
|
2065-04-28 |
2066-04-27 |
Gajadhar Sapkota, Bhusan Guragai |
P.O.Box- 14165, Kathmandu, Phone 01-4496456, 01-4219563 |
28o 11' 48" |
28o 13' 34" |
83o 13' 37" |
83o 17' 01" |
(Gulmi) |
|
| 120 |
Sawane -A |
1.500 |
Sawane |
|
2065-04-28 |
2066-04-27 |
Krishna Prashad Shrestha |
P.O.Box 13886, Bhachali Teku Kathmandu, Phone 01-4244764 |
28o 11' 15" |
28o 13' 00" |
83o 16' 45" |
83o 18' 15" |
(Baglung) |
|
| 121 |
Badigad (Kolti) |
3.000 |
Badigad |
|
2065-04-28 |
2066-04-27 |
Pioneer Hydro Pvt.Ltd |
P.O.Box. 9595, Kathmandu, Phone 01-2012467 |
29o 29' 17" |
29o 30' 25" |
81o 39' 00" |
81o 42' 15" |
(Bajura) |
|
| 122 |
Sudha Khola |
3.750 |
Sudha |
|
2065-04-28 |
2066-04-27 |
Khudi Hydropower Ltd |
Baneswor Kathmandu, Phone 01-2053003, 9851083279 |
28o 21' 50" |
28o 23' 27" |
84o 18' 58" |
84o 20' 00" |
(Lamjung) |
|
| 123 |
Trisuli Galchhi |
10.000 |
Trishuli |
|
2065-04-29 |
2066-04-28 |
Siddhakali Power Pvt.Ltd |
P.O.Box 9106, Kathmandu, Phone 01-4115585, Fax 01-4447895 |
27o 47' 52" |
27o 50' 00" |
84o 59' 30" |
85o 01' 30" |
(Nuwakot) |
|
| 124 |
Ghatte Khola |
5.000 |
Ghatte |
|
2065-05-03 |
2066-05-02 |
Tribhuwan Dhar Tuladhar |
P.O.Box. 5835, Kathmandu |
27o 46' 25" |
27o 47' 14" |
86o 17' 00" |
86o 18' 35" |
(Dolakha) |
|
| 125 |
Middle Midim |
3.000 |
Midim |
|
2065-05-06 |
2066-05-05 |
Ambika Kafle |
P.O.Box. 660, Kathmandu, Phone 01-4354767 |
28o 12' 16" |
28o 14' 58" |
84o 15' 45" |
84o 17' 08" |
(Lamjung) |
|
| 126 |
Lawa Khola |
3.000 |
Lawa |
|
2065-05-09 |
2066-05-08 |
Guru Pd Dahal, Rup N. Baitha etc. |
PO Box 23892, Kathmandu, Ph: 2325110 |
26o 47' 00" |
26o 49' 32" |
87o 35' 00" |
87o 37' 30" |
(Morang) |
|
| 127 |
Machha Khola |
4.900 |
Machha |
|
2065-05-13 |
2066-05-12 |
Jwala Hydropower Co. P. Ltd. |
19/138 Tangal Tole, Lalitpur, Ph 5536983 |
28o 12' 19" |
28o 14' 03" |
84o 49' 30" |
84o 52' 36" |
(Gorkha) |
|
| 128 |
Middle Khimti Khola |
2.600 |
Khimti |
|
2065-05-13 |
2065-05-12 |
Sankarmali Mini HP P Ltd |
PO Box 21171, Kathmandu, Ph: 9741066585 |
27o 36' 38" |
27o 38' 20" |
86o 17' 43" |
86o 19' 17" |
(Ramechhap) |
|
| 129 |
Upper Khudi A |
4.980 |
Khudi |
|
2065-05-19 |
2066-05-18 |
Babu Ram Bhardwaj |
PO Box 3889, Kathmandu, Ph: 2053003, 9851083279 |
28o 21' 20" |
28o 22' 34" |
84o 17' 19" |
84o 19' 33" |
(Lamjung) |
|
| 130 |
Upper Naugad |
4.500 |
Naugad |
|
2065-05-24 |
2066-05-23 |
Buddha HP Co Ltd |
PO Box 8975, EPC 1350, Kathmandum Ph: 2124209 |
29o 43' 19" |
29o 44' 24" |
80o 36' 06" |
80o 40' 00" |
Dethala,Dhuligada,Sikhar (Darchula) |
|
| 131 |
Chandravati Khola |
4.000 |
Chandravati |
403 |
2065-06-05 |
2066-06-04 |
Public Consulting Engineers, Madhukar Pandey, Durga Prasad Bhattarai and Rosan Karki |
Koteswor Kathmandu, Phone 9841296784 |
27o 54' 32" |
27o 55' 50" |
85o 24' 45" |
85o 27' 11" |
Beteni,Rautbesi,Gaunkharka (Nuwakot) |
|
| 132 |
Manahari Khola |
3.600 |
Manahari |
405 |
2065-06-15 |
2066-06-14 |
Bishnu Energy & Engineering |
P.O.Box 13729, Kathmandu, Phone 2004924 |
27o 33' 37" |
27o 35' 14" |
84o 52' 52" |
84o 55' 18" |
Kalikatar,Raksorang (Makawanpur) |
|
| 133 |
Super Dordi |
5.000 |
Dordi |
406 |
2065-06-15 |
2066-06-14 |
Peoples Hydropower Compani Pvt.Ltd. |
G.P.O. Box 14165 Maharajgunj Kathmandu, Phone 016222304 Fax 014720739 |
28o 16' 58" |
28o 20' 05" |
84o 32' 14" |
84o 35' 18" |
Dhodeni,Faleni (Lamjung) |
|
| 134 |
Seti (scheme A) |
6.000 |
Seti |
410 |
2065-06-15 |
2066-06-14 |
Him Shree Hydropower Pvt. Ltd. |
Mustang Chok Pokhara, Phone 061-520774, 061-528345 |
28o 20' 18" |
28o 21' 50" |
83o 57' 15" |
83o 57' 50" |
Machhapuchchhre,Sardikhola (Kaski) |
|
| 135 |
Trishuli Khola |
5.000 |
Trishuli |
417 |
2065-06-30 |
2066-06-29 |
Shahid Diksha Jalbidhut Ayojana PVT.Ltd. |
Darbarmarg Kathmandu, Phone 9851040063 |
28o 05' 44" |
28o 07' 36" |
85o 17' 42" |
85o 19' 24" |
Dhunche (Rasuwa) |
|
| 136 |
Lower Igwa Khola |
4.000 |
Igwa |
418 |
2065-06-30 |
2066-06-29 |
Shankar Narayan Linthep |
P.O. Box 24697, Kathmandu, Phone 9841521159 |
27o 16' 41" |
27o 17' 04" |
87o 51' 55" |
87o 52' 21" |
Sawalakhu (Taplejung) |
|
| 137 |
Chhaldi Khola |
4.960 |
Chhaldi |
421 |
2065-06-30 |
2066-06-29 |
Dor Bahadur Chhantyal |
House No. 30, Amarabati Aabas Dhaksi Matatirth, Kathmandu, Phone 9841470982 |
28o 06' 00" |
28o 07' 00" |
83o 14' 11" |
83o 16' 00" |
Hastichaur (Gulmi) |
|
| 138 |
Middle Sunkoshi |
2.500 |
Sun Koshi |
422 |
2065-06-30 |
2066-06-29 |
Lama Hydropower Pvt. Ltd. |
P.O.Box 8965 EPC 5518 Kathmandu, Phone 01-4429399 |
27o 46' 46" |
27o 47' 23" |
85o 56' 02" |
85o 57' 48" |
Choukati (Sindhupalchok) |
|
| 139 |
Surnaya Gad |
5.000 |
Surnyagad |
423 |
2065-07-04 |
2066-07-03 |
Yagya Prasad Subedi, Gokarna Pande, Dipak Acharya, Dipak Sharma |
Buddhanagar Baneswor Kathmandu |
29o 22' 47" |
29o 23' 51" |
80o 25' 33" |
80o 27' 20" |
Melauli (Baitadi) Dewal Dibyapur (Dadeldhura) |
|
| 140 |
Bhuji Khola |
4.700 |
Bhuji |
424 |
2065-07-04 |
2066-07-03 |
Amarawati Builders abd Developers Pvt. Ltd. |
P.O.Box 10462, Kathmandu |
28o 20' 00" |
28o 21' 34" |
83o 07' 58" |
83o 10' 00" |
Adhikarichaur,Burtiwang (Baglung) |
|
| 141 |
Middle Tadi |
3.000 |
Tadi |
425 |
2065-07-07 |
2066-07-06 |
Dupcheswor Mahadev Hydro Co. Pvt. Ltd. |
New Baneswor Kathmandu, Phone 01-4780487 |
27o 57' 30" |
27o 57' 54" |
85o 24' 04" |
85o 25' 09" |
Dhyangphedi,Rautbesi,Shikharbesi (Nuwakot) |
|
| 142 |
Sabha Khola Small |
3.600 |
Sabha |
426 |
2065-07-07 |
2066-07-06 |
Yadav Kumar Adhikari, Badri Prasad Dhakal and Dipak Acharya |
Anam Nagar Kathmandu, Phone 9851090766 |
27o 26' 07" |
27o 26' 35" |
87o 19' 17" |
87o 23' 48" |
Sabha Pokhari (Sankhuwasabha) |
|
| 143 |
Lower Balephi-3 |
4.500 |
Balephi |
427 |
2065-07-18 |
2066-07-17 |
Kasthmandap Hydropower Development Pvt. Ltd. |
Minbhawan Kathmandu, Phone 01-4479040 |
27o 43' 10" |
27o 44' 40" |
85o 45' 45" |
85o 47' 15" |
Ikhu,Kadambas,Fupingdandagau (Sindhupalchok) |
|
| 144 |
Chhati Gad |
8.000 |
Chhati Gad |
429 |
2065-07-20 |
2066-07-19 |
Hydro Vision Company P Ltd |
531 Pandol Marg, Kathmandu - 2, Phone 01-4436051 |
29o 48' 20" |
29o 50' 00" |
80o 53' 10" |
80o 55' 00" |
Khandeswori (Darchula) |
|
| 145 |
Upper Sankuwa Khola |
4.950 |
Sankuwa |
430 |
2065-07-20 |
2066-07-19 |
Lama Construction Company Pvt. Ltd. |
P.O.Box 9961, Maharajgunj, Kathmandu |
28o 29' 02" |
28o 32' 28" |
87o 04' 25" |
87o 06' 04" |
Bala,Tamku (Sankhuwasabha) |
|
| 146 |
Balephi 'A' |
4.900 |
Balephi |
431 |
2065-07-20 |
2066-07-19 |
Moonlight Hydropower Company Pvt. Ltd. |
Kamaladi, Kathmandu, Phone 01-4410160 |
27o 50' 48" |
27o 51' 48" |
85o 45' 00" |
85o 46' 31" |
(Sindhupalchok) |
|
| 147 |
Theule Khola |
1.500 |
Theule |
432 |
2065-07-20 |
2066-07-19 |
Barahi Hydropower Pvt. Ltd. |
Lekside Pokhara |
28o 10' 00" |
28o 11' 30" |
83o 36' 00" |
83o 39' 00" |
Binamare,Kusmi,Sarkuwa (Baglung) |
|
| 148 |
Khimti 'A' |
2.000 |
Khimti |
433 |
2065-07-20 |
2066-07-19 |
Deusa Hydropower Pvt. Ltd. |
P.O.Box 14233 Kathmandu, Phone 01-4484774 |
27o 35' 00" |
27o 36' 06" |
86o 14' 05" |
86o 16' 26" |
(Ramechhap) |
|
| 149 |
Sabha A |
5.000 |
Sabha |
436 |
2065-07-25 |
2066-07-24 |
Sabha Khola Hydropower Company Limited |
P.O.Box 11039, Kathmandu, Phone 01-4474895 |
27o 24' 13" |
27o 25' 55" |
87o 17' 17" |
87o 19' 02" |
(Sankhuwasabha) |
|
| 150 |
Upper Badigad |
5.000 |
Badigad |
437 |
2065-07-25 |
2066-07-24 |
Resunga Power Development Company Pvt. Ltd. |
P.O.Box. 8973 EPC 838, Kathmandu, Phone 2091398, 9841327272 |
28o 07' 00" |
28o 10' 00" |
83o 17' 20" |
83o 19' 40" |
(Gulmi) |
|
| 151 |
Ghar Khola |
5.000 |
Ghar |
443 |
2065-08-18 |
2067-08-17 |
Myagdi Hydropower Pvt. Ltd. |
Pardi Pokhara, Phone 061-463429 |
28o 27' 30" |
28o 29' 30" |
83o 38' 00" |
83o 40' 00" |
,Shikha (Myagdi) |
|
| 152 |
Sisuwa Khola |
2.670 |
Sisuwa |
444 |
2065-08-18 |
2066-08-17 |
Khampulung Hydropower Pvt. Ltd. |
House No. 145 Sriram Marg, Battisputali, Kathmandu, Phone 01-4488643, 9841303859 |
27o 28' 39" |
27o 30' 00" |
87o 01' 13" |
87o 02' 25" |
(Sankhuwasabha) |
|
| 153 |
Upper Pheme Khola |
2.500 |
Pheme |
445 |
2065-08-18 |
2067-08-17 |
Aqua Himal Hydropower Pvt. Ltd. |
P.O.Box 3970, Phone 9841327272, 01-2091398 |
27o 07' 30" |
27o 08' 30" |
87o 48' 14" |
87o 50' 00" |
Nangeen,Ranitar (Panchthar) |
|
| 154 |
Hewa Khola 'B' |
5.000 |
Hewa |
447 |
2065-09-03 |
2066-09-02 |
Pachthar Power Company Pvt. Ltd. |
Kathmandu, Phone 01-4498116, 9851081165 |
27o 09' 39" |
27o 10' 40" |
87o 46' 10" |
87o 47' 42" |
(Panchthar) |
|
| 155 |
Lower Pheme Khola |
2.200 |
Pheme |
448 |
2065-09-06 |
2066-09-05 |
Arun Valley Hydropower Development Co. P. Ltd. |
Baneshwor, Ktm, P.O. Box: 11039, Ph: 4475234, Fax: 4474895 |
27o 08' 45" |
27o 09' 55" |
87o 46' 10" |
87o 46' 50" |
Nangeen,Phidim,Bharapa (Panchthar) |
|
| 156 |
Yambaling Khola |
3.110 |
Yambaling |
065/66 BUS 449 |
2065-09-14 |
2067-09-13 |
Yamling Hydropower Pvt Ltd |
Battisputali , Kathmandu Tel: 98510725306 |
27o 56' 13" |
27o 57' 23" |
85o 47' 25" |
85o 00' 00" |
(Sindhupalchok) |
|
| 157 |
Kalangad |
6.400 |
Kalanga |
065/66 BUS 452 |
2065-09-14 |
2066-09-13 |
Sani Gad Hydro pvt. Ltd |
p. O. Box. 19607, Phone 01-4375675, 01-4378083 |
29o 34' 43" |
29o 40' 00" |
80o 52' 30" |
80o 59' 24" |
|
|
| 158 |
Upper Dordi 'A' |
4.800 |
Dordi |
451 |
2065-09-14 |
2066-09-13 |
Nresh Bajracharya, Yadav Raj Mainali |
P.O.Box 2745, Phone 9841612161 |
28o 15' 00" |
28o 16' 20" |
84o 28' 46" |
84o 31' 59" |
(Lamjung) |
|
| 159 |
Kalanga |
8.000 |
Kalanga |
455 |
2065-09-14 |
2066-09-13 |
Kalanga Hydropower P Ltd |
P.O.Box 19607, Kathmandu, Phone 01-4375675,01-4378083 |
29o 30' 00" |
29o 35' 00" |
80o 50' 45" |
80o 54' 45" |
(Bajhang) |
|
| 160 |
Sanigad |
5.700 |
Sanigad |
065/66 BUS 453 |
2065-09-17 |
2066-09-16 |
Sanigad Hydro P Ltd |
p. O. Box. 19607, Phone 01-4375675, 01-4378083 |
29o 34' 43" |
29o 40' 48" |
80o 50' 51" |
80o 52' 10" |
(Bajhang) |
|
| 161 |
Bagar Khola |
4.500 |
Bagar |
454 |
2065-09-20 |
2066-09-19 |
Pradip Sapkota |
Myagdi |
28o 28' 32" |
28o 30' 00" |
83o 31' 32" |
83o 32' 43" |
Chimkhola (Myagdi) |
|
| 162 |
Rapti Khola |
2.185 |
Rapti |
457 |
2065-09-20 |
2066-09-19 |
Sirin Hydropower Pvt. Ltd., |
Koteswor, Kathmandu, Phone 9851087945 |
27o 30' 04" |
27o 30' 53" |
85o 03' 09" |
85o 04' 51" |
Bhaise,Nibuwatar (Makawanpur) |
|
| 163 |
Lungri Khola-2 |
5.000 |
Lungri |
458 |
2065-09-20 |
2067-09-19 |
Muktishree |
P. O. Box 12557, Phone no 01-4268572,Thapathali Kathmandu |
28o 10' 32" |
28o 12' 42" |
82o 41' 10" |
82o 42' 05" |
(Rolpa) |
|
| 164 |
Devighat Cascade HPP |
9.600 |
Trishuli |
065/66 BUS460 |
2065-09-21 |
2066-09-20 |
Devighat Hydropower Pvt Ltd |
GPO box: 9466Kathmandu, Tel: 01-4352329 |
27o 51' 08" |
27o 53' 17" |
85o 05' 48" |
85o 08' 16" |
Bidur N.P.,Charghare,Khadag Bhanjyang (Nuwakot) |
|
| 165 |
Gaddi Gad HPP |
4.000 |
Gaddigad |
065/66 BUS 461 |
2065-09-23 |
2067-09-22 |
Baibhav Power Nepal Pvt Ltd |
GPO box: 5514, Kathmandu, Tel: 014228816 |
29o 13' 30" |
29o 15' 20" |
81o 01' 54" |
81o 03' 24" |
Latamadau,Sanagau (Doti) |
|
| 166 |
Lahpa Khola |
5.000 |
Lahpa |
463 |
2065-09-25 |
2066-09-24 |
Lapa Hydropower Company |
Kathmandu, Phone 9851049190 |
28o 09' 55" |
28o 11' 28" |
85o 01' 05" |
85o 03' 02" |
(Dhading) |
|
| 167 |
Katti Khola |
2.978 |
Katti |
464 |
2065-09-28 |
2066-09-27 |
Dinesh Niraula,Raju Sinkada, Dipak Acharya, Bharatmani Paudel Ajaylaxmi Parajuli |
Itahari-1, Sunsari Tel:9851090766 |
28o 47' 00" |
28o 48' 41" |
81o 45' 28" |
81o 48' 06" |
(Dailekh) |
|
| 168 |
Lower Phalaku HPP |
1.200 |
Phalakhu |
|
2065-09-29 |
2066-09-28 |
Bisham Hydropower Company Pvt Ltd |
Battisputli, Kathmandu-9 |
27o 58' 07" |
27o 58' 39" |
85o 13' 15" |
85o 15' 00" |
Bageswori (Nuwakot) Bhorle (Rasuwa) |
|
| 169 |
Upper Naugad |
5.000 |
Naugad |
467 |
2065-10-29 |
2067-10-28 |
Tripura Energy Nepal P.Ltd |
|
29o 44' 24" |
29o 46' 10" |
80o 39' 33" |
80o 41' 10" |
(Darchula) |
|
| 170 |
Rukum gad |
5.000 |
Rukumgad |
468 |
2065-10-29 |
2067-10-28 |
Rapti Hydro and General Construction Pvt. Ltd. |
New Baneshor, Kathmandu, Phone 9841396470 |
28o 35' 36" |
28o 38' 02" |
82o 37' 30" |
82o 39' 01" |
Kanda,Sobha (Rukum) |
|
| 171 |
Super Chepe |
5.000 |
Chepe |
469 |
2065-11-04 |
2066-11-03 |
Super Chepe HP Co P Ltd |
Dhapasi-7, Kathmandu, Ph. No. 9846099482 |
28o 13' 00" |
28o 15' 00" |
84o 37' 55" |
84o 39' 08" |
Kharibot (Gorkha) Dudhpokhari (Lamjung) |
|
| 172 |
Mai Khola A 1 |
1.250 |
Mai Khola |
065/66 BUS 480 |
2065-11-05 |
2066-11-04 |
Upper Mai Hydro Developmnet Company |
GPO box: 24194, Kathmandu |
27o 03' 55" |
27o 04' 48" |
87o 57' 48" |
88o 00' 00" |
Mabu,Maimajhuwa (Ilam) |
|
| 173 |
Suri Khola |
5.000 |
Suri |
065/66 BUS 470 |
2065-11-20 |
2067-11-19 |
Suri Khola Hydropower Pvt Ltd |
GPO Box: 8941 , Katmandu |
27o 44' 10" |
27o 45' 00" |
86o 12' 50" |
86o 15' 10" |
(Dolakha) |
|
| 174 |
Upper Mai-A HPP |
2.000 |
Mai Khola |
065/66 BUS 471 |
2065-11-21 |
2067-11-20 |
Upper Mai Hydropower Development Pvt Ltd |
GPO box: 24194, Kathmandu |
27o 03' 30" |
27o 04' 37" |
87o 56' 52" |
87o 57' 48" |
Maimajhuwa,Mabu (Ilam) |
|
| 175 |
Mudi Khola |
6.000 |
Mudi |
065/66 BUS 472 |
2065-11-21 |
2066-11-20 |
Mudi Hydropower Co. P. Ltd |
Kathmandu, Ph : 9841365234 |
28o 31' 19" |
28o 35' 00" |
83o 16' 28" |
83o 21' 44" |
(Myagdi) |
|
| 176 |
Chirkuwa Khola |
3.000 |
Chirkhuwa |
065/66 BUS 473 |
2065-11-21 |
2066-11-20 |
Chirkhuwa Hydropower Company Pvt td |
GPO Box: 5565 , Katmandu |
27o 21' 23" |
27o 22' 30" |
87o 04' 48" |
87o 06' 32" |
(Bhojpur) |
|
| 177 |
Upper Daraundi |
2.400 |
Daraundi |
065/66 BUS 474 |
2065-11-21 |
2066-11-20 |
Jit hydropower |
P.O.Box. 9292, Kathmandu, Phone 9851015956 |
28o 15' 00" |
28o 16' 15" |
84o 43' 17" |
84o 44' 40" |
Ghyalchok (Gorkha) |
|
| 178 |
Middle Chaku Khola |
1.800 |
Chaku |
065/66 BUS 475 |
2065-11-21 |
2067-11-20 |
Laughing Budha Power Nepal |
GPO Box: 4619 , Katmandu |
27o 52' 00" |
27o 53' 00" |
85o 55' 45" |
85o 56' 00" |
(Sindhupalchok) |
|
| 179 |
Sapsu Khola |
2.780 |
Sapsu |
065/66 BUS 476 |
2065-11-21 |
2066-11-20 |
Shambhu P Ghimire |
476/32 Sahabhagita Marg, Baneswor, Kathmandu |
27o 08' 35" |
27o 09' 40" |
86o 45' 15" |
86o 48' 20" |
(Khotang) |
|
| 180 |
Myagdi Khola |
9.500 |
Myagdi |
065/66 BUS 477 |
2065-11-21 |
2065-11-20 |
Millennum Hydropower Co. P. Ltd |
Battisputali, Kathmandu, Phone 4472636, 44744892 |
28o 27' 15" |
28o 29' 44" |
83o 21' 24" |
83o 23' 12" |
(Myagdi) |
|
| 181 |
Salankhu Khola |
2.200 |
Salankhu |
065/66/ BUS 482 |
2065-12-05 |
2066-12-04 |
Center for Power Development & Services P. Ltd. |
Minbhawan, KTM Ph: 4466899, 9851081640 |
27o 59' 00" |
27o 59' 30" |
85o 07' 30" |
85o 10' 00" |
(Nuwakot) |
|
| 182 |
Makari gad |
4.500 |
Makari gad |
065/66 BUS 481 |
2065-12-05 |
2066-12-04 |
Hydrovision Company Pvt Ltd |
531 Pandolmarg, Kathmandu - 2, Phone 01-4436051 |
29o 46' 54" |
29o 48' 03" |
80o 50' 53" |
80o 52' 47" |
(Darchula) |
|
| 183 |
Mahesh Khola |
1.900 |
Mahesh |
065/66 BUS 484 |
2065-12-10 |
2066-12-09 |
Mk Hydropower Co Pvt Ltd |
Kathmandu, Phone 01-4230330 |
27o 45' 45" |
27o 48' 05" |
85o 00' 00" |
85o 03' 17" |
(Dhading) |
|
| 184 |
Baramchi Khola HPP |
9.800 |
Baramchi |
065/66 BUS 483 |
2065-12-12 |
2066-12-11 |
Unique Hydel Pvt Ltd |
Kathmandu Phone 01-4672598,4672599 |
27o 05' 11" |
27o 51' 36" |
85o 45' 35" |
85o 46' 42" |
Baramchi,Hagam (Sindhupalchok) |
|
| 185 |
Upper Charnawati Khola |
2.200 |
Charnawati |
065/66/ BUS 488 |
2065-12-17 |
2066-12-16 |
Swoyambhu Hydropower P. Ltd |
GPO Box: 8975 , Kathmandu, Tel :01-5534472 |
27o 39' 21" |
27o 40' 30" |
85o 59' 15" |
86o 01' 37" |
(Dolakha) |
|
| 186 |
Upper Daram-II |
2.750 |
Daram |
065/66 BUS 489 |
2065-12-20 |
2066-12-19 |
Tara Hydropower P. Ltd. |
P.O.Box 525, Kathmandu |
28o 17' 52" |
28o 19' 15" |
83o 24' 16" |
83o 25' 00" |
(Baglung) |
|
| 187 |
Upper Maya Khola |
3.098 |
Maya |
065/66 BUS 490 |
2065-12-20 |
2066-12-19 |
Sujan Bhandari & Ambika Devi Dahal |
Kath., PoB. 23892, Ph: 9841875597, 4494850 |
27o 12' 54" |
27o 14' 31" |
87o 22' 18" |
87o 24' 15" |
Madi Mulkharka,Tamfok (Sankhuwasabha) |
|
| 188 |
Daram Khola-A |
2.500 |
Daram |
065/66 BUS 491 |
2065-12-20 |
2067-12-19 |
Saya Patri HP |
Kathmandu, Phone 01-4364009 |
28o 16' 45" |
28o 17' 52" |
83o 24' 30" |
83o 25' 27" |
(Baglung) |
|
| 189 |
Naisim Khola |
9.800 |
Nyasim |
065/66 BUS 495 |
2065-12-28 |
2066-12-27 |
Sindhujwala Hydropower P. Ltd |
Shantinagar, Kathamndu, ph : 6916485 |
27o 59' 30" |
28o 02' 00" |
85o 48' 00" |
85o 50' 30" |
(Sindhupalchok) |
|
| 190 |
Nimrung Khola |
4.280 |
Nimrung |
065/66 BUS 497 |
2065-12-31 |
2066-12-30 |
Nimrung Hydropower Pvt Ltd |
GPO box: 21173, Kathmandu, Tel: 9841934613 |
28o 15' 00" |
28o 16' 30" |
84o 51' 00" |
84o 53' 10" |
(Gorkha) |
|
| 191 |
Banganga |
3.200 |
Banganga |
065/66 BUS 498 |
2066-01-08 |
2067-01-07 |
Gopal Ghimire, Binod Bhushal |
Kathmandu |
27o 47' 50" |
27o 50' 15" |
83o 10' 40" |
83o 12' 30" |
(Arghakhanchi) |
|
| 192 |
Indrawati Melamchi |
4.900 |
Indrawati melamchi |
065/66 BUS 499 |
2066-01-08 |
2067-01-07 |
State Energy Pvt Ltd |
GPO box: 1513, Kathmandu, Tel: 01-4421078 |
27o 47' 50" |
27o 49' 29" |
85o 34' 41" |
85o 35' 10" |
Badegau,Jyamire,Sikharpur (Sindhupalchok) |
|
| 193 |
Iwa Khola |
2.600 |
Iwa |
065/66 BUS 506 |
2066-01-14 |
2067-01-13 |
Rairang Hydropower Development Co Pvt Ltd |
GPO Box: 12268 , Katmandu |
27o 16' 30" |
27o 17' 20" |
87o 50' 05" |
87o 51' 54" |
(Taplejung) |
|
| 194 |
Likhu A HPP |
5.000 |
Likhu Khola |
065/66 BUS 501 |
2066-01-28 |
2067-01-27 |
Naramdeswar Hydropower Company Pvt Ltd |
New Baneswar , Kathmandu Tel: 4783510 |
27o 20' 58" |
27o 22' 30" |
86o 12' 36" |
86o 13' 54" |
Singhadevi,Narmedeshwor (Okhaldhunga) Gothgau (Ramechhap) |
|
| 195 |
Upper Rigdi Khola |
4.000 |
Rigdi |
065/66 BUS 502 |
2066-01-30 |
2067-01-29 |
Chitawan Power Company Pvt. Ltd. |
Khumaltar Height, Lalitpur |
27o 47' 30" |
27o 48' 38" |
84o 31' 33" |
84o 34' 06" |
Dahakhani,Chandi Bhanjyang (Chitawan) |
|
| 196 |
Thapa Khola |
2.340 |
Thapa |
065/66 BUS 503 |
2066-02-12 |
2067-02-11 |
Laxmi Khadka |
Tupche -3, Nuwakot ,Tel: 9841832093 |
28o 42' 00" |
28o 45' 00" |
83o 36' 15" |
83o 39' 25" |
(Mustang) |
|
| 197 |
Upper Jogmai HPP |
5.000 |
Jogmai |
065/66 BUS 507 |
2066-02-17 |
2067-02-16 |
Tara Sapkota |
Ilam, 01-4492965 |
26o 56' 17" |
26o 57' 58" |
88o 02' 55" |
88o 05' 30" |
Naya Bazar (Ilam) |
|
| 198 |
Lahu Khola |
4.080 |
Lahu |
065/66 BUS 509 |
2066-02-20 |
2067-02-19 |
Rukum Power Co. Ltd. |
Kathmandu, Phone 4241853 |
28o 34' 36" |
28o 36' 28" |
82o 25' 52" |
82o 26' 51" |
(Rukum) |
|
| 199 |
Chulepu Khola |
2.300 |
Chulepu Khola |
065/66 BUS 510 |
2066-02-24 |
2067-02-23 |
Chandeshwori Mahadev Khola HP Co |
Bhaktapur Tel: 01-6630660 |
27o 28' 50" |
27o 30' 00" |
86o 16' 17" |
86o 18' 01" |
(Ramechhap) |
|
| 200 |
Orang Khoa HPP |
2.100 |
Orang Khola |
065/66 BUS 511 |
2066-02-24 |
2067-02-23 |
Research and Development Group |
GPO box:10910, Kathmandu, Tel: 4780657 |
27o 46' 46" |
27o 47' 49" |
84o 11' 18" |
84o 13' 09" |
Bulung,Orang (Dolakha) |
|
| 201 |
Upper Daram A |
6.000 |
Daram |
066/67 BUS 0517 |
2066-03-28 |
2067-03-27 |
Ghumte Hydropower Pvt Ltd |
Bhotebahal, Kathmandu, Phone 01-4253149 |
28o 14' 11" |
28o 16' 45" |
83o 25' 00" |
83o 26' 38" |
Harichaur,Heel,Argal (Baglung) |
|
| 202 |
Seti Khola HPP |
3.000 |
Seti Khola |
065/66 BUS 0513 |
2066-03-30 |
2067-03-29 |
Parbat Paiyu Khola Hydropower Company |
Head Office ,Kathmandu Tel: 2093013, Fax: 4385668 |
28o 00' 30" |
28o 02' 30" |
83o 36' 00" |
83o 37' 30" |
Shivalaya (Parbat) |
|
| 203 |
Charnawati Hydropower Project |
3.520 |
Charnawati |
066/67 BUS 515 |
2066-04-08 |
2067-04-07 |
Nepal Hydro Developer Pvt Ltd |
Baneswar-10, Kathmandu, Tel; 4498116, 9841384167 |
27o 37' 50" |
27o 39' 20" |
86o 00' 58" |
86o 02' 36" |
Mati (Dolakha) |
|
| 204 |
Jiri Khola SHP |
2.400 |
Jiri |
066/67 BUS 516 |
2066-04-16 |
2067-04-15 |
Bojini Company (P.) Ltd |
Bansbari, Kathmandu. G.P.O Box: 14166 |
27o 35' 06" |
27o 36' 45" |
86o 13' 24" |
86o 14' 00" |
(Dolakha) |
|
| 205 |
Sanjen Hydropower Project |
4.000 |
Sanjen |
066/67 BUS 518 |
2066-05-02 |
2067-05-01 |
Rekha Kumari Sharma |
Naxal, Kathmandu, Tel: 4440433 |
28o 15' 08" |
28o 17' 04" |
85o 15' 00" |
85o 16' 49" |
Chilime (Rasuwa) |
|
| 206 |
Sanjen Khola |
5.000 |
Sanjen |
518 |
2066-05-02 |
2067-05-01 |
Rekha Kumari Sharma |
Kathmandu, Phone 01-4440433 |
28o 15' 08" |
28o 17' 04" |
85o 15' 00" |
85o 16' 49" |
Chilime (Rasuwa) |
|
| 207 |
Padam Khola |
3.500 |
Padam |
066/67 BUS 519 |
2066-05-08 |
2067-05-07 |
Padamkalika Hydroelectric Co. Pvt Ltd |
GPO BoX; 8003, Kathmandu Tel: 9741093299 |
28o 54' 30" |
28o 54' 56" |
81o 49' 30" |
81o 51' 45" |
(Dailekh) |
|
| 208 |
Upper Hewa HPP |
7.500 |
Hewa |
066/67 BUS 520 |
2066-05-14 |
2067-05-13 |
Barun Hydropower Development Company Pvt Ltd |
GPO Box: 14165, Kathmandu Tel: 6226073 |
27o 19' 34" |
27o 20' 55" |
87o 20' 45" |
87o 22' 30" |
Jaljala,Siddhapokhari (Sankhuwasabha) |
|
| 209 |
Chake Khola HPP |
1.800 |
Chake Khola |
066/67 BUS 524 |
2066-07-09 |
2066-07-08 |
Nobel Hydropower Pvt Ltd |
Boudh, Kathmandu , Tel: 4498749, 9851027633 |
27o 54' 45" |
27o 55' 16" |
85o 22' 50" |
85o 24' 44" |
Balkumari,Rautbesi,Samundratar (Nuwakot) |
|
| 210 |
Sabha Khola HPP |
2.400 |
Sabha |
066/67 BUS 525 |
2066-08-02 |
2067-08-01 |
Ram Prasad Gauli, Navin Kumar Gauli |
Ram Prasad Gauli, Nabin Kumar Gauli, House P.O. Box 7014, Kathmandu, Phone 01-4436100, 9841407070 |
27o 21' 11" |
27o 21' 35" |
87o 13' 45" |
87o 14' 44" |
Syabun,Dhupu (Sankhuwasabha) |
|
| 211 |
Nisi Khola HEP-1 |
6.000 |
Nisi |
066/67 BUS 526 |
2066-08-02 |
2067-08-01 |
Prabhu Energy Pvt Ltd |
PO Box 5211, Kathmandu |
28o 19' 44" |
28o 21' 52" |
83o 05' 00" |
83o 07' 30" |
Adhikarichaur,Boharagaun,Bowang,Burtiwang,Devisthan,Nisi (Baglung) |
|
| 212 |
Thadekhani Khola HPP |
3.000 |
Thadekhani Khola |
066/67 BUS 527 |
2066-08-02 |
2067-08-01 |
Pakhapani Hydropower Pvt Ltd |
Marfa House, Anamnagar , Kathmandu |
28o 26' 26" |
28o 27' 30" |
83o 29' 00" |
83o 31' 16" |
Pakhapani (Myagdi) |
|
| 213 |
Upper Khoranga Khola HPP |
7.500 |
Khoranga |
066/67 BUS 528 |
2066-08-02 |
2067-08-01 |
Tehrathum Power Company Pvt Ltd |
Kathmandu-32, 9851030667 |
27o 11' 24" |
27o 13' 59" |
87o 31' 20" |
87o 32' 30" |
Morahang (Terhathum) |
|
| 214 |
Badigad HPP |
5.000 |
Badigad |
530 |
2066-08-15 |
2067-08-14 |
Water and Energy Nepal Pvt Ltd |
Tel: 9857620805, 068-520369 |
28o 15' 45" |
28o 20' 00" |
83o 09' 15" |
83o 11' 30" |
Burtiwang,Bhinggithe,Rajkut (Baglung) |
|
| 215 |
Upper Indrawati |
4.000 |
Indrawati |
533 |
2066-08-25 |
2067-08-24 |
Nepalpower Generation Co. Pvt. Ltd. |
P.O.Box 4429, 4227646 |
27o 53' 16" |
27o 54' 32" |
85o 37' 00" |
85o 37' 35" |
Banskharka (Sindhupalchok) |
|
| 216 |
Deumai Khola |
7.820 |
deumai |
536 |
2066-12-22 |
2067-12-21 |
Dolakha Nirman Company Pvt. Ltd. |
Biratnagar - 13 |
26o 49' 50" |
26o 54' 25" |
87o 46' 10" |
87o 47' 30" |
|
|
| 217 |
Phenlun Briddhin Diversion HPP |
4.500 |
Phenlun-Briddhin |
538 |
2066-12-22 |
2067-12-21 |
Public Nepal Hydropower Pvt Ltd |
PO Box 5558, Kathamdu Tel: 9841196401 |
28o 11' 34" |
28o 14' 05" |
85o 21' 55" |
85o 24' 03" |
Briddhim (Rasuwa) |
|
| 218 |
Jhyaku Khola |
4.400 |
Jhyaku |
539 |
2066-12-24 |
2067-12-23 |
Ganesh Hydropower Company |
Ratopul, KTM,Block no. 2019 |
27o 39' 20" |
27o 40' 57" |
86o 08' 55" |
86o 11' 54" |
(Dolakha) |
|
| 219 |
Sisa Khola HPP |
5.000 |
Sisa |
540 |
2066-12-25 |
2067-12-24 |
Tila Ram Basnet |
Sisuwa-4, Morang, Tel: 9851085986 |
27o 26' 07" |
27o 27' 40" |
86o 30' 00" |
86o 33' 31" |
Kerung (Solukhumbu) |
|
| 220 |
Gelun Khola HPP |
3.350 |
Gelun |
541 |
2066-12-25 |
2066-12-24 |
Gelun Khola Hydropower Company Pvt Ltd |
Baneswar, Kathmandu Tel: 4492150 |
27o 49' 30" |
27o 50' 40" |
85o 46' 30" |
85o 49' 15" |
Baramchi,Hagam,Jalbire (Sindhupalchok) |
|
| 221 |
Kapadigad |
5.320 |
Kapadigad |
543 |
2067-01-07 |
2068-01-06 |
Mekh Bdr Sapkota |
Dhunga Adda, Tinthana-7,KTM, 014316325 |
29o 00' 00" |
29o 01' 00" |
80o 45' 00" |
80o 46' 30" |
(Doti) |
|
| 222 |
Paraiuli Khola-1 |
2.150 |
Parajuli |
544 |
2067-01-07 |
2068-01-06 |
Rara Hydropower Development Co. |
Mangalbazaar, Laltipur, Ph: 01-5009160, 9841505699 |
28o 41' 39" |
28o 43' 14" |
81o 41' 09" |
81o 43' 45" |
(Dailekh) |
|
| 223 |
Tame Khola SHP |
1.250 |
Tame |
545 |
2067-01-10 |
2068-01-09 |
Jwala Sajhedari Hydropower Co. P. Ltd. |
KMC-14, Kalanki, Kathmandu, 9841505711, 9748019542 |
28o 52' 00" |
28o 53' 52" |
81o 46' 08" |
81o 46' 36" |
Narayan (Dailekh) |
|
| 224 |
Malagad |
5.310 |
Malagad |
546 |
2067-01-10 |
2068-01-09 |
Muktishree Pvt. Ltd |
GPO Box 12557, Kathmandu, Nepal. Ph : 4268572 |
29o 20' 11" |
29o 20' 58" |
81o 20' 13" |
81o 22' 21" |
(Bajura) |
|
| 225 |
Upper Piluwa Khola-2 SHP |
2.475 |
Piluwa |
550 |
2067-01-10 |
2068-01-09 |
Menchhiyam Hydropower P Ltd. Itahari,Sunsari,9841521159 |
Mawadin VDC-1, Sankhuwasabha / Change VDC-4, Taplejung, Tel: 9841521159 |
27o 17' 40" |
27o 18' 01" |
87o 23' 18" |
87o 24' 21" |
Mawadin,Siddhakali (Sankhuwasabha) |
|