Construction License :: Hydro (More than 1MW)
Updated on - Jan 13, 2021
Updated on - Jan 13, 2021
S No | Project | Capacity (MW) | River | Lic No | Isuue Date | Validity | Promoter | Address | Latitiude N | Longitude E | VDC/District | Remarks | ||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | Kule Khani Third | 14.000 | Kulekhani | 24 | 2064-12-17 | 2099-12-16 | Nepal Electricity Authority | 27o 27' 30" | 27o 31' 00" | 85o 01' 30" | 85o 03' 30" | Bhaise (Makawanpur) | ||
2 | Lower Modi Khola | 20.000 | Modi Khola | 38 | 2067-05-21 | 2102-05-20 | Modi Energy Pvt . Ltd | Naxal Sanogaucharan, Tel: 4441131, Fax: 4441973 | 28o 14' 08" | 28o 16' 18" | 83o 42' 30" | 83o 44' 43" | , Durlung, Deurali, Ramja, Tilahar (Parbat) | Promoter name changed for to Modi Energy Pvt . Ltd from Manang Trade Links Pvt . Ltd |
3 | Upper Tamakoshi HPP | 456.000 | Tama Koshi | 41 | 2067-08-17 | 2102-08-16 | Upper Tamakoshi Hydropower Limited | Kathmandu, GPO Box: 26070 , Tel: 4420295, Fax: 4412569 | 27o 49' 00" | 27o 56' 40" | 86o 10' 00" | 86o 16' 00" | Bulung, Gauri Sankar, Khare, Lamabagar, Sunakhani, Sundrawati (Dolakha) | |
4 | Khani Khola - 1 | 40.000 | Khani Khola | 46 | 2068-01-28 | 2103-01-27 | Green Life Energy Pvt.Ltd, Sirin Bhawan, Lalitpur-1, Kupakdole | P.O.Box 3970, Kathmandu, Phone 01-5010712, Fax- 5010694 | 27o 47' 48" | 27o 50' 28" | 86o 20' 00" | 86o 22' 00" | Khare, Marbu (Dolakha) | |
5 | Dordi Khola | 27.000 | Dordi | 48 | 2068-03-23 | 2103-03-22 | Himalaya Power Partner Pvt. Ltd | POB 8975 EPC 4205 Marajaganj, Kathmandu, nepal Phoneand Fax: 4375874 | 28o 10' 00" | 28o 13' 32" | 84o 26' 00" | 84o 28' 30" | Archalbot, Chiti, Dhodeni, Nauthar, Shree Banjyang, Udipur (Lamjung) | |
6 | Rahughat | 40.000 | Rahughat | 49 | 2068-04-03 | 2103-04-02 | Nepal Electricity Authority | 28o 22' 21" | 28o 25' 45" | 83o 31' 13" | 83o 34' 35" | Jhin (Myagdi) | ||
7 | Tadi Khola | 5.000 | Tadi Khola | 51 | 2068-06-04 | 2103-06-03 | Hiraratna hydropower Pvt. Ltd | Kalopul, Kathmandu -5, POB : 21650, Ph no. 01-4220127, Fax 4226330 | 27o 56' 04" | 27o 57' 30" | 85o 22' 53" | 85o 24' 05" | , Rautbesi, Samundratar, Shikharbesi (Nuwakot) | |
8 | Jumdi Khola Small | 1.750 | Jumdi | 52 | 2068-07-07 | 2103-07-06 | Jumdi Hydropower Pvt. Ltd., | Old Baneshwor, Kathmandu-34, Mobile: 9841662955 | 28o 01' 25" | 28o 02' 44" | 83o 26' 46" | 83o 27' 30" | Bharse, Hasara, Juhang (Gulmi) | |
9 | Mristi Khola | 42.000 | Mristi | 53 | 2068-07-20 | 2103-07-19 | Robust Energy Ltd. | Thamel, Kathmandu-29, Nepal POB 3839, Phone:203334, Fax:4499898 | 28o 30' 00" | 28o 32' 17" | 83o 39' 10" | 83o 40' 42" | , Dana, Narchyang (Myagdi) | |
10 | Sanjen | 42.500 | Sanjen | 55 | 2068-08-12 | 2103-08-11 | Sanjen Jalvidyut Co. | P.O.Box 25210, Gyaneswor, Kathmandu, Phone 01-4443077, Fax 01- 4443076 | 28o 11' 00" | 28o 13' 00" | 85o 16' 30" | 85o 18' 15" | Chilime (Rasuwa) | |
11 | Upper Mailung -A | 6.420 | Mailung Khola | 56 | 2068-09-11 | 2103-09-10 | Energy Engineering Pvt. Ltd | PO Box 9292, Ph 4915225 | 28o 09' 45" | 28o 12' 30" | 85o 11' 00" | 85o 14' 00" | , Gatlang, Haku (Rasuwa) | |
12 | Upper Chaku A | 22.200 | Chaku | 58 | 2068-11-12 | 2103-11-11 | Shiva Sri Hydropower Pvt. Ltd | P.O.Box 13860 Kathmandu, Phone 01-4466330, | 27o 51' 31" | 27o 52' 31" | 85o 56' 00" | 85o 58' 06" | Marbin, Fulpingkatti (Sindhupalchok) | |
13 | Likhu-4 | 52.400 | Likhu Khola | 59 | 2068-11-28 | 2098-11-27 | Green Ventures Pvt. Ltd | P.O.Box 772, Triveni Complex Putalisadak kathmandu, Ph 5544736 | 27o 26' 39" | 27o 29' 09" | 86o 15' 00" | 86o 20' 00" | Ragani, Pokli (Okhaldhunga) Saibu, Bijulikot, Naga Daha, Tilpung (Ramechhap) | |
14 | Lower Khare | 11.000 | Khare | 64 | 2069-03-19 | 2104-03-18 | Universal Power Company P. Ltd | Thapathali KTM, POB : 13961, Ph no: 014261827, 4252216 | 27o 45' 00" | 27o 45' 43" | 86o 11' 35" | 86o 13' 52" | Bulung, Chankhu, Khare, Suriti (Dolakha) | |
15 | Upper Sanjen | 14.800 | Sanjen | 69 | 2069-05-07 | 2104-05-06 | Sanjen Jalvidhyut Co | Das Tower Lazimpat, Kathmandu, 01-4002049, Fax 4443077 | 28o 13' 00" | 28o 14' 25" | 85o 16' 30" | 85o 18' 15" | Chilime (Rasuwa) | First Amendment of Clause 5 of the License on 2075-11-22; Ama Chhodinmo RM, Province No 3 |
16 | Kabeli-A | 37.600 | Kabeli Khola | 70 | 2069-05-21 | 2104-05-20 | Kabeli Energy Limited | Budhanagar, GPO Box: 11728, Kathmandu Tel: 4781776 | 27o 13' 41" | 27o 17' 32" | 87o 40' 55" | 87o 45' 50" | Ambarpur, Panchami (Panchthar) Thechambu (Taplejung) | |
17 | Rasuwagadhi | 111.000 | Bhote koshi | 75 | 2069-08-21 | 2104-08-20 | Rasuwagadhi H P | Gyaneswor Kathmandu, P.O.Box 25210, Phone 014439163, 014439284 | 28o 14' 05" | 28o 16' 39" | 85o 21' 22" | 85o 23' 03" | Thuman, Timure (Rasuwa) | |
18 | Upper Khimti | 12.000 | Khimti Khola | 77 | 2069-09-03 | 2104-09-02 | Himalaya Urja Bikas Co. Pvt. Ltd. | Balkot-2 Bhaktapur, Phone 016632822 | 27o 39' 24" | 27o 41' 54" | 86o 19' 20" | 86o 21' 40" | Chuchure (Ramechhap) | |
19 | Namarjun Madi | 12.000 | Madi Khola | 78 | 2069-09-11 | 2104-09-10 | Himalayan Hydropower Pvt.Ltd | P.O. Box No.: 20225, Lazimpat, Kathmandu, Phone: 01-4441216, Fax: 01-4441217 | 28o 17' 56" | 28o 19' 00" | 84o 05' 00" | 84o 06' 08" | Namarjung, Sildujure (Kaski) | |
20 | Upper Mailun Khola | 14.300 | Mailung Khola | 79 | 2069-09-20 | 2106-11-26 | Upper Mailung Khola Hydropower Limited. | Baluwatar, Kathmandu, Nepal. Ph: 4436027, Fax: 4419703 | 28o 05' 56" | 28o 08' 00" | 85o 11' 00" | 85o 13' 00" | , Gatlang, Haku, Dandagoun (Rasuwa) | Survey Lic No: 79 Date: 2069-09-20 |
21 | Junbeshi | 5.200 | Junbeshi | 80 | 2069-09-20 | 2104-09-19 | Dobhan Hydropower Pvt.Ltd. | Tinkune, Koteswor, Kathmandu, P.O.Box 23746, Phone 01-4486911 | 27o 33' 15" | 27o 35' 08" | 86o 32' 40" | 86o 34' 29" | Beni (Solukhumbu) | |
22 | Dordi-1 | 12.000 | Dordi | 82 | 2069-10-12 | 2104-10-11 | Dordi Khola Jalvidyut Company Limited | Tripushwor, Kathmandu, P.O. Box: 20290, Ph:4232748, 4232749, Fax: 4232750 | 28o 13' 33" | 28o 15' 11" | 84o 26' 55" | 84o 28' 45" | Chiti, Bansar, Dhodeni, Faleni (Lamjung) | |
23 | Nyadi Khola | 30.000 | Nyadi | 83 | 2069-11-03 | 2104-11-02 | Nyadi Hydropower Limited | P.O.Box. 11728, Kathmandu, Phone 01-4781776, 4784026, Fax 01-4780994 | 28o 19' 20" | 28o 21' 07" | 84o 25' 25" | 84o 28' 00" | Bahundada, Bhulbhule (Lamjung) | |
24 | Lower Tadi | 4.993 | Tadi Khola | 88 | 2069-12-27 | 2104-12-26 | Buddha Bhumi Nepal Hydropower Co. Pvt. ltd. | Kantipath Kathmandu, Phone 01-4248228, Fax 01-4244474 | 27o 55' 05" | 27o 55' 40" | 85o 21' 08" | 85o 22' 50" | Balkumari, Samundratar, Sundaradevi, Thaprek (Nuwakot) | |
25 | Khorunga Khola | 4.800 | Khoranga Khola | 87 | 2069-12-29 | 2104-12-28 | Reliable Hydropower Company. P. Ltd | P.O. Box: 516 , Khumaltar, Lalitpur, Nepal. Ph: 5550505 | 27o 09' 22" | 27o 11' 09" | 87o 32' 03" | 87o 33' 20" | Ambung, Oyabjung (Terhathum) | |
26 | Gelun Khola HPP | 3.200 | Gelun | 91 | 2070-02-06 | 2105-02-05 | Gelun Khola Hydropower Company Pvt Ltd | Baneswar, Kathmandu Tel: 4492150 | 27o 49' 30" | 27o 50' 40" | 85o 46' 30" | 85o 49' 15" | Baramchi, Hagam, Jalbire (Sindhupalchok) | |
27 | Khani Khola (Dolakha) | 30.000 | Khani Khola | 092 | 2070-02-10 | 2105-02-09 | Sasha Engineering Hydropower P. Ltd | Kuleshwor, P. O. Box: 8856, Kathmandu, Nepal. Ph: 4227646, 4220842, Mobile No.: 9851020234 | 27o 46' 59" | 27o 49' 09" | 86o 17' 20" | 86o 19' 30" | Marbu, Khare (Dolakha) | Issued first amendmet on 2075-10-07 |
28 | Middle Modi | 15.100 | Modi Khola | 93 | 2070-03-07 | 2105-03-06 | Middle Modi Hydropower Limited | P.O.Box: 12268, Nepal. Ph:4038030, Fax:4038026 | 28o 17' 20" | 28o 18' 29" | 83o 45' 00" | 83o 47' 08" | , Deupurkot, Tilahar (Parbat) | |
29 | Middle Midim | 3.100 | Midim Khola | 100 | 2070-04-10 | 2105-04-09 | Madhya Midim Jalvidhyut Company Pvt. Ltd. | Dhapasi-7, Tirlingtar, Kathmandu, Phone 01-4386514 | 28o 12' 16" | 28o 14' 10" | 84o 15' 45" | 84o 17' 08" | , Gilung, Karapu, Maling, Nalma (Lamjung) | Survey Lic No: 394 Date: 2065-05-06 |
30 | Upper Trishuli 3B | 37.000 | Trishuli | 104 | 2070-04-27 | 2105-04-26 | Nepal Electricity Authority | 27o 59' 12" | 28o 01' 21" | 85o 10' 11" | 85o 12' 01" | Manakamana (Nuwakot) | ||
31 | Parajuli Khola-1 | 2.150 | Parajuli Khola | 102 | 2070-05-03 | 2105-05-02 | Rara Hydropower Development Co. | Sitapaila - 2, kathmandu, Ph: 01-4033016, 9841209736 | 28o 41' 39" | 28o 43' 14" | 81o 41' 09" | 81o 43' 45" | Awal Parajul (Dailekh) | |
32 | Lohare Khola | 4.200 | Lohore Khola | 105 | 2070-06-08 | 2105-06-07 | Lohare Khola Hydropower Co. P. L., | Anamnagar, Kathmandu, POBox 5558, Phone 9841461609 | 28o 53' 43" | 28o 55' 00" | 81o 47' 16" | 81o 49' 22" | Baluwatar, Nomule, Salleri, Toli (Dailekh) | Survey Lic No: 537 Date: 2066-12-22 |
33 | Salankhu Khola | 2.500 | Salankhu | 107 | 2070-07-05 | 2105-07-04 | Salankhu Khola Hydropower P. Ltd. | Samakhusi Town Planning-29, Kathmandu; GPO Box.: 8974; CPC Box : 044; Ph: 4390239, 4390240; email: salakhukhola@gmail.co | 27o 59' 00" | 27o 59' 30" | 85o 07' 30" | 85o 10' 00" | Kaule, Manakamana, Tupche, Fikuri (Nuwakot) | Survey Lic No: 065/66/ BUS 482 Date: 2065-12-05 |
34 | Madhya Bhotekoshi | 102.000 | Bhote koshi | 108 | 2070-08-18 | 2105-08-17 | Madhya Bhotekoshi Jalbidyut Company Ltd. | Maharajganj Kathmandu, P.O.Box. 23599, Phone 01-4721641, 4721642, Fax 01-4721643 | 27o 49' 08" | 27o 53' 00" | 85o 51' 49" | 85o 54' 43" | Maneswor, Marbin, Listi (Sindhupalchok) | Survey Lic No: 599 Date: 2067-12-25 |
35 | Rawa Khola HPP | 6.500 | Rawa Khola | 112 | 2070-10-28 | 2105-10-27 | Dudhkoshi Power Company Pvt Ltd | Milanchok 34, Kathmandu, GPO Box: 12015, Tel; 01-4469270, Fax 01-4491475 | 27o 17' 51" | 27o 18' 51" | 86o 44' 15" | 86o 45' 31" | Hauchour, Jalapa, Dumekoldada (Khotang) | |
36 | Down Piluwa | 9.500 | Piluwa Khola | 113 | 2070-11-04 | 2105-11-03 | River Falls Hydropower Development P. Ltd. | P.O.Box, 14165, Anamnagar, Kathmandu, Phone 01-4238159, Fax 01-4102651 | 27o 14' 30" | 27o 15' 00" | 87o 16' 00" | 87o 18' 10" | Baneswor, Ankhibhui, Mamling (Sankhuwasabha) | |
37 | Super Dordi Kha Hydropower Project | 49.600 | Dordi | 115 | 2070-11-21 | 2105-11-20 | Peoples Hydropower Company Pvt.Ltd. | G.P.O. Box 14165 Maharajgunj Kathmandu, Phone 016222304 Fax 014720739 | 28o 16' 20" | 28o 18' 43" | 84o 31' 00" | 84o 34' 10" | Dhodeni, Faleni (Lamjung) | Survey Lic No: 406 Date: 2065-06-15 |
38 | Lower Solu Hydropower Project | 82.000 | Solu Khola | 118 | 2070-12-05 | 2105-12-04 | Solu Hydropower Pvt Ltd | R R Bhavan, Narayanchaur, Kathmandu, Tel; 4261827, Fax: 4260266 | 27o 24' 49" | 27o 26' 41" | 86o 34' 31" | 86o 37' 34" | Garma, Tingla (Solukhumbu) | |
39 | Upper Myagdi | 20.000 | Myagdi Khola | 119 | 2070-12-06 | 2105-12-05 | Hydro Empire P Ltd | Bafal Sundhara, Kathmandu, P.O.Box 9713 | 28o 31' 12" | 28o 33' 20" | 83o 21' 50" | 83o 23' 20" | Marang, Mudi, Muna (Myagdi) | Survey Lic No: 419 Date: 2065-06-30 |
40 | Rupse Khola | 4.000 | Rupse Khola | 120 | 2071-01-05 | 2106-01-04 | Research & Development Group | Buddha Nagar Kathmandu, Phone 014780675 | 28o 32' 30" | 28o 33' 40" | 83o 36' 40" | 83o 38' 13" | Dana (Myagdi) | Survey Lic No: 318 Date: 2064-12-17 |
41 | Upper Dordi A HEP | 25.000 | Dordi | 121 | 2071-01-15 | 2106-01-14 | Liberty Energy Hydropower Pvt. Ltd. | Stock House, Kathmandu Municipality-29, Kalikasthan; PH: 01-4443545/ 4441988 | 28o 15' 00" | 28o 16' 20" | 84o 28' 46" | 84o 31' 59" | Dhodeni, Faleni (Lamjung) | Survey Lic No: 631 Date: 2069-04-16 |
42 | Khare Hydropower Project | 24.100 | Khare | 122 | 2071-01-21 | 2106-01-20 | Constorium Power Developers Pvt Ltd | Sinamangal, Kathmandu, Tel; 4462856, fax: 4462856 | 27o 45' 36" | 27o 48' 00" | 86o 14' 00" | 86o 18' 00" | Chankhu, Khare, Marbu (Dolakha) | |
43 | Maya Khola Hydropower Project | 14.900 | Maya | 123 | 2071-02-26 | 2106-02-25 | Maya Khola Hydropower Company pvt Ltd | 126 Milap Marg, Bisalnagar, Kathmandu, Nepal. P.O.Box: 8975, EPC: 5602, Tel: 4417947, Fax; 977-1-4433610 | 27o 13' 40" | 27o 15' 45" | 87o 18' 33" | 87o 22' 26" | Mamling, Madi Rambeni, Baneswor (Sankhuwasabha) | |
44 | Solu Khola (Dudha Koshi) | 86.000 | Solu Khola | 126 | 2071-06-02 | 2106-06-01 | Sahas Urja Limited | Kathmandu-1, Hatisar Phone 01-4419182 | 27o 21' 53" | 27o 25' 15" | 86o 37' 35" | 86o 41' 15" | Kagel, Tingla, Panchan, Newa Beddhari, Salyan (Solukhumbu) | Generation Lic No: 126 Date: 2071-06-02 |
45 | Sabha Khola A | 8.300 | Sabha Khola | 128 | 2071-06-28 | 2106-06-27 | Deepsabha Hydropower Pvt. Ltd. | Old Baneshwor Kathmandu | 27o 21' 36" | 27o 23' 18" | 87o 14' 00" | 87o 17' 00" | Dhupu, Syabun (Sankhuwasabha) | Survey Lic No: 333 Date: 2065-02-09 |
46 | Badigad HPP | 6.600 | Badigad | 129 | 2071-09-17 | 2106-09-16 | Water and Energy Nepal Pvt Ltd | P. O. Box : 4610, Panipokhari , Kathmandu, Phone: 01-4435485, Fax: 01-4435485 | 28o 19' 13" | 28o 20' 14" | 83o 09' 15" | 83o 11' 30" | Burtiwang, Bhinggithe, Rajkut (Baglung) | |
47 | Durbang Myagdi Khola | 25.000 | Myagdi Khola | 130 | 2071-11-04 | 2106-11-03 | Dhaulagiri Kalika Hydropower P Ltd | GPO BoX: 4504, Kathmandu-30, , Gyaneswar, Phone no 4436819, 4442730 | 28o 23' 15" | 28o 26' 00" | 83o 22' 30" | 83o 26' 20" | , Arman, Babiyachaur, Devisthan, Darwang, Niskot (Myagdi) | |
48 | Upper Khimti II | 7.000 | Khimti Khola | 131 | 2071-12-13 | 2106-12-12 | Himalaya Urja Bikash Company Limited | G.P.O. Box: 10429 Ph: 4487794 | 27o 38' 20" | 27o 39' 55" | 86o 18' 10" | 86o 20' 10" | Chuchure (Ramechhap) | Survey Lic No: 317 Date: 2064-12-17 |
49 | Balephi A | 10.600 | Balephi | 132 | 2072-01-06 | 2107-01-05 | Moonlight Hydropower Company Pvt. Ltd. | Kamaladi, Kathmandu, Phone 01-4474328, 4462844 | 27o 50' 48" | 27o 51' 42" | 85o 45' 00" | 85o 46' 31" | Baramchi, Golche, Pangtang (Sindhupalchok) | Survey Lic No: 431 Date: 2065-07-20 |
50 | Upper Hewa HPP | 8.500 | Hewa Khola | 133 | 2072-01-15 | 2107-01-14 | Upper Hewa Khola Hydropower Company Pvt Ltd | GPO Box: 14165, Kathmandu Tel: 4102757 | 27o 19' 34" | 27o 20' 55" | 87o 20' 45" | 87o 22' 30" | Jaljala, Siddhapokhari (Sankhuwasabha) | Survey Lic No: 066/67 BUS 520 Date: 2066-05-14, Financial Closure 2072-12-13 |
51 | Suri Khola | 7.000 | Suri | 134 | 2072-02-24 | 2107-02-23 | Suri Khola Hydropower Pvt Ltd | GPO Box: 8941 , Katmandu. Phone no 4117079 | 27o 44' 10" | 27o 45' 14" | 86o 12' 50" | 86o 15' 10" | , Chankhu (Dolakha) | Survey Lic No: 065/66 BUS 470 Date: 2065-11-20; Tailwater Level has been fixed for minimum 1111 amsl |
52 | Upper Modi A | 42.000 | Modi Khola | 135 | 2072-03-04 | 2107-03-03 | Nepal Electricity Authority | Durbarmarga, Kathmandu | 28o 20' 00" | 28o 24' 06" | 83o 46' 53" | 83o 50' 00" | Lumle, Ghandruk (Kaski) | |
53 | Rukum gad | 5.000 | Rukum Gad | 136 | 2072-03-09 | 2107-03-08 | Rapti Hydro and General Construction Pvt. Ltd. | Tripureshwor, Kathmandu, P. O. Box no 13961 Phone 014101140, 014251080 | 28o 35' 36" | 28o 36' 50" | 82o 37' 30" | 82o 39' 01" | Kanda, Sobha (Rukum) | Survey Lic No: 468 Date: 2065-10-29 |
54 | Ghar Khola | 14.000 | Ghar | 137 | 2072-03-11 | 2107-03-10 | Myagdi Hydropower Ltd. | Pardi Pokhara, Phone 061-463429 | 28o 27' 00" | 28o 29' 05" | 83o 38' 00" | 83o 40' 20" | , Shikha (Myagdi) | Survey Lic No: 443 Date: 2065-08-18 |
55 | Ghatte Khola | 5.000 | Ghatte Khola | 138 | 2072-03-24 | 2107-03-23 | Mankamana Engineering HP | P.O.Box. 8020, Kathmandu, 4785771 | 27o 46' 25" | 27o 47' 14" | 86o 17' 00" | 86o 18' 35" | Marbu (Dolakha) | Survey Lic No: 392 Date: 2065-05-03 |
56 | Tanchhahara SHP | 2.400 | Tangchhahara | 141 | 2072-04-29 | 2107-04-28 | Tanchhar Hydro Pvt. Ltd. | Phone no 01 4017783 P.O.Box 683, Bansabari Kathmandu | 28o 39' 51" | 28o 41' 14" | 83o 35' 00" | 83o 35' 59" | Kowang, Lete (Mustang) | Survey Lic No: 342 Date: 2065-02-21 |
57 | Langtang Khola Small Hydropower Project | 20.000 | Langtang | 142 | 2072-06-01 | 2107-05-31 | Multi Energy Development Pvt. Ltd. | P.O.Box 10242 Kathmandu 10, Phone 01 4781891 email langtangkhola@gmail.com | 28o 09' 05" | 28o 09' 49" | 85o 20' 34" | 85o 22' 15" | Syafru (Rasuwa) | Survey Lic No: 0652 Date: 2069-12-09 |
58 | Siddhi Khola | 10.000 | Siddhi Khola | 143 | 2072-06-13 | 2107-06-12 | Lumbini Builders P. Ltd | New Baneshwor, Kathmandu, Nepal. Ph: 071 520460, 4464305, Po Box no 10678 | 26o 49' 39" | 26o 50' 43" | 88o 08' 00" | 88o 09' 50" | Samalpung, Jirmale (Ilam) | |
59 | Upper Tadi | 11.000 | Tadi Khola | 144 | 2072-06-22 | 2107-06-21 | Surya Kund Hydro Electric Pvt. Ltd. | Anam Nagar Kathmandu, Phone 01-4770245, 01-4771285 Fax 01-4771109 | 27o 57' 32" | 27o 59' 03" | 85o 25' 01" | 85o 27' 00" | Rautbesi (Nuwakot) | |
60 | Likhu -1 | 77.000 | Likhu Khola | 145 | 2072-06-22 | 2107-06-21 | Pan Himay Energy Pvt. Ltd | Ph. 01-4244352, 1815/105 Kantipath, Kathmandu | 27o 36' 00" | 27o 40' 35" | 86o 26' 00" | 86o 28' 00" | Gumdel (Ramechhap) | |
61 | Likhu -2 | 55.000 | Likhu Khola | 146 | 2072-06-22 | 2107-06-21 | Global Hydropower Associate Pvt. Ltd | Kantipath, Kathmandu, Phone no 4225009 | 27o 34' 03" | 27o 36' 26" | 86o 22' 43" | 86o 26' 00" | Gumdel (Ramechhap) Chaulakharka(Waula) (Solukhumbu) | |
62 | Ruru Banchu - 1 | 16.000 | Rurubanchu Khola | 147 | 2072-06-27 | 2107-06-26 | Mount Nilgiri Hydropower Company Pvt Ltd | P.O.Box 8003, Kathmandu Phone no 01 4216573 | 29o 05' 32" | 29o 06' 37" | 81o 45' 54" | 81o 48' 05" | Chilkhaya, Odanku (Kalikot) | Survey Lic No: 352 Date: 2065-02-26 |
63 | Likhu Khola 'A' | 51.000 | Likhu Khola | 148 | 2072-07-16 | 2107-07-15 | Numbur Himalaya Hydropower Pvt. Ltd | P.O.Box 4286 Kathmandu, Phone 014478774 | 27o 31' 19" | 27o 34' 02" | 86o 21' 30" | 86o 23' 05" | Chaulakharka(Waula), Goli (Solukhumbu) | Survey Lic No: 407 Date: 2065-06-15 |
64 | Upper Piluwa Khola-2 SHP | 4.720 | Piluwa Khola | 149 | 2072-09-03 | 2107-09-02 | Menchhiyam Hydropower P Ltd. Itahari, Sunsari, 9841521159 | PO Box no 8975 EPC 1030 Kathmandu, Phone no 4008602, 9843142092 | 27o 17' 40" | 27o 18' 01" | 87o 23' 18" | 87o 24' 21" | Mawadin, Siddhakali (Sankhuwasabha) | Survey Lic No: 550 Date: 2067-01-10 |
65 | Singati Khola hydropower project | 25.000 | Singati | 150 | 2072-09-30 | 2107-09-29 | Singati Hydro Energy Pvt. Ltd. | Durbar Marg Kathmandu, Tel: 4228816, Fax : 977-1-4223570 | 27o 44' 00" | 27o 47' 17" | 86o 07' 05" | 86o 09' 55" | Babare, Laduk, Lamidada (Dolakha) | |
66 | Kalanga | 15.330 | Kalanga Gad | 151 | 2072-12-14 | 2107-12-13 | Kalanga Hydropower P Ltd | Sukedhara, Kathmandu, Po. Box. No. 21399, Phone No. 01-4116052, 01-4116053, Email: info.kghep@gmail.com | 29o 30' 41" | 29o 34' 12" | 80o 50' 45" | 80o 54' 45" | , Sunkuda, Khiratadi, Banjh (Bajhang) | |
67 | Upper Kalangad | 38.460 | Kalanga Gad | 152 | 2072-12-14 | 2107-12-13 | Sani Gad Hydro pvt. Ltd | Sukedhara, Rara Marg, Kathmandu, Po. Box. No. 13607/21399, Phone no. 01-4101652, 01-4101653, Email: info.ukhep@gmail.com | 29o 34' 43" | 29o 38' 37" | 80o 52' 30" | 80o 57' 36" | Dahabagar, Khiratadi (Bajhang) | |
68 | Sanigad | 10.700 | Sani Gad | 153 | 2072-12-14 | 2107-12-13 | Bungal Hydro P Ltd | Sukedhara, Rara Marg, Kathmandu, Po.Box. No. 13607/21399, Phone no: 01-4101652, 014101653, Email: info.ukhep@gmail.com | 29o 36' 15" | 29o 39' 40" | 80o 49' 25" | 80o 51' 50" | Kaphalaseri, Pipalkot (Bajhang) | |
69 | Lower Likhu | 28.100 | Likhu Khola | 154 | 2072-12-28 | 2107-12-27 | Swaita Ganga Hydropower and Construction Pvt. Ltd. | P.O.Box. 439, Naxal, Kathmandu, Phone 01-4415314, 4446442, Fax 01-44412777 | 27o 22' 47" | 27o 25' 50" | 86o 13' 17" | 86o 15' 38" | Tarkerabari, Yasam, Gamanamatar (Okhaldhunga) Bijulikot, Gothgau (Ramechhap) | Survey Lic No: 357 Date: 2065-03-04 FC completed on 18 Mrach, 2018 |
70 | ChulepuKhola Hydropower Project | 8.520 | Chulepu, Dhunde Khola | 155 | 2073-01-13 | 2108-01-12 | Chandeswari Mahadev Khola Micro Hydro Com.P.Ltd. | Madhyapur Thimi 15, Kausaltar, Bhaktapur 6630660, 9851088190 | 27o 28' 50" | 27o 31' 48" | 86o 15' 40" | 86o 18' 01" | Bhujee, Guptesqor, Pritee (Ramechhap) | Survey Lic No: 690 Date: 2071-09-14 |
71 | Chauri Khola | 5.000 | Chauri | 156 | 2073-01-14 | 2108-01-13 | Chauri Hydropower P Ltd | Anamnagar-32 , KTM, Ph: 014102696, Fax 4102696, email - chaurihydro@gmail.com | 27o 35' 33" | 27o 37' 22" | 85o 51' 49" | 85o 53' 22" | Goswara (Ramechhap) | Survey Lic No: 607 Date: 2068-02-20 |
72 | Tanahu HEP | 140.000 | Seti Khola | 157 | 2073-02-03 | 2108-02-02 | Tanahu Hydropower Limited | 4th Floor, Trade Tower, Thapathali, Kathmandu. Phone: 5111117, 5111118 Fax: 5111121, Email: info@thl.com.np | 27o 55' 00" | 28o 00' 00" | 84o 04' 00" | 84o 17' 30" | Damauli, Kahu Sivapur (Tanahu) | |
73 | Daraundi-1 | 10.000 | Daraundi | 158 | 2073-02-26 | 2108-02-05 | Diamond Hydropower Pvt. Ltd | Babarmahal, Kathmandu. Po. Box no 21287, Phone no 44442330, Email durga_amagain@yahoo.com | 28o 03' 09" | 28o 06' 10" | 84o 38' 52" | 84o 40' 00" | Takumajhlakuribot, Takukot, Masel, Jaubari, Gakhu, Shreenathkot (Gorkha) | Survey Lic No: 349 Date: 2065-02-22 |
74 | Taksar Pikhuwa | 8.000 | Pikhuwa | 159 | 2073-03-03 | 2108-03-02 | Taksar Pikhuwa Khola Hydropower Pvt. Ltd. | Gairigaun, Tinkune, Kathmandu, Phone no 9851099478, 4495459, Email: taksarpikhuwahydropower@gmail.com | 27o 07' 00" | 27o 08' 50" | 87o 01' 40" | 87o 04' 15" | Kota, Mane Bhanjyang, Taksar, Dalgaun (Bhojpur) | Survey Lic No: 593 Date: 2067-12-07 |
75 | Sanjen Khola | 78.000 | Sanjen | 160 | 2073-03-09 | 2108-03-08 | Sala Sungi P Ltd | Kathmandu-4, Chhapalkarkhana, , 01-4015674, info.salasungi@gmail.com | 28o 14' 26" | 28o 17' 11" | 85o 15' 00" | 85o 18' 21" | Chilime (Rasuwa) | Survey Lic No: 518 Date: 2066-05-02 |
76 | Phalakhu Khola HPP | 5.000 | Phalankhu Khola | 161 | 2073-03-24 | 2108-03-23 | Rasuwa Hydropower Company Pvt Ltd | GPO Box: 8003, Kathmandu, Tel; 4880041 | 27o 58' 09" | 28o 00' 10" | 85o 15' 17" | 85o 16' 09" | Bhorle, Saramthali (Rasuwa) | Survey Lic No: 531 Date: 2066-08-25 |
77 | Phalakhu Khola HPP | 14.700 | Phalankhu Khola | 162 | 2073-04-10 | 2108-04-09 | Betrawati Hydroelectric Co. Ltd | Thulo Bharyang, Kathmandu-15, Phone no 4002566, P.O. Box no 8003 | 28o 00' 15" | 28o 02' 10" | 85o 16' 10" | 85o 19' 00" | Saramthali, Yarsa (Rasuwa) | Survey Lic No: 592 Date: 2067-12-07 |
78 | Upper Balephi A | 36.000 | Balephi | 163 | 2073-04-12 | 2108-04-11 | Balephi Hydropower Ltd. | Koteshwor 35 Kathamndu; P.O.Box 23189 Kathmandu, Phone 9771 4602073 | 27o 53' 45" | 27o 57' 00" | 85o 45' 30" | 85o 47' 40" | Golche, Pangtang, Dhumthang (Sindhupalchok) | Survey Lic No: 408 Date: 2065-06-15 |
79 | Liping Khola | 16.260 | Liping | 164 | 2073-04-12 | 2108-04-11 | Him River Power Pvt. Ltd | RR Complex, 4th Floor, Narayan Chaur, Naxal, Kathmandu; Tel: 4441535, Fax: 44435714; P.O. Box: 3797 | 27o 58' 11" | 27o 59' 20" | 85o 56' 30" | 85o 57' 44" | Tatopani (Sindhupalchok) | Survey Lic No: 551 Date: 2067-01-19 |
80 | Lower Khorunga | 5.500 | Khoranga Khola | 165 | 2073-04-12 | 2108-04-11 | IDS Energy Pvt. Ltd | Heritedge Plaza, Kathmandu, Phone no 4169116, 4169117, Fax no 4169118, Emai info@idsenergy.com | 27o 07' 30" | 27o 09' 21" | 87o 32' 30" | 87o 34' 32" | Jaljale, Tamfula (Terhathum) | Survey Lic No: 379 Date: 2065-04-16 |
81 | Bijaypur Khola-2 HPP | 4.500 | Bijaypur | 166 | 2073-04-25 | 2108-04-24 | Civil hydropower company | Lekhanath Nagarpalika, Phone no 0610465562, email : civilhydropower@gmail.com | 28o 09' 10" | 28o 10' 37" | 84o 02' 00" | 84o 02' 36" | Lekhnath (Kaski) | Survey Lic No: 562 Date: 2067-02-23 |
82 | Upper Solu Khola HPP | 18.000 | Solu Khola | 169 | 2073-05-16 | 2106-11-16 | Beni Hydropower Project | 27o 31' 15" | 27o 32' 57" | 86o 34' 27" | 86o 35' 19" | Beni, Salleri (Solukhumbu) | ||
83 | Makari gad | 10.000 | Makari gad | 170 | 2073-05-27 | 2108-05-26 | Makarigad Hydropower Pvt. Ltd | Jagrittole Narayangopal Chowk, House No 50, Gorkhali Housei, Kathmandu; Phone no 44420530, Mob. 9841412569 (Karan Chand) | 29o 46' 54" | 29o 48' 03" | 80o 50' 33" | 80o 52' 30" | , Guljar, Khandeswori (Darchula) | Survey Lic No: 481 Date: 2065-12-05 |
84 | Yambaling Khola | 7.271 | Yambling | 172 | 2073-06-09 | 2108-06-08 | Yamling Hydropower Pvt Ltd | 8461, Battisputali , Kathmandu Tel: 98511140280, 014215238, email: ymlhydro@gmail.com | 27o 56' 13" | 27o 57' 23" | 85o 47' 25" | 85o 50' 00" | Gumba, Golche (Sindhupalchok) | |
85 | Sano Milti Khola SHP | 3.000 | Milti | 173 | 2073-06-09 | 2108-06-08 | Sano Milti Khola Hydropower P.Ltd. | Bansbari, Kathmandu, Phone no 012298250, email : smkhl@gmail.com | 27o 29' 36" | 27o 30' 17" | 86o 03' 00" | 86o 04' 20" | Dandakharka, Melung (Dolakha) Phulasi (Ramechhap) | FC completed on 2075-01-05 |
86 | Madi-Bhorletar | 10.000 | Madi Khola | 171 | 2073-06-10 | 2108-06-09 | Kalash Hydropower P. Ltd | Baluwatar, Kathmandu, Phone no 4444797, 9851138808 | 28o 07' 30" | 28o 10' 21" | 84o 12' 50" | 84o 13' 52" | Hansapur, Thumki, Siddha (Kaski) | |
87 | Rahughat Mangale | 37.000 | Rahughat | 175 | 2073-07-29 | 2108-07-28 | Tundi Power Company P.Ltd. | Sanepa Lalitpur, P.O.Box. 6341, Phone 01-5555573, Fax 01-5555574, 9851041573 | 28o 28' 30" | 28o 31' 50" | 83o 30' 00" | 83o 31' 32" | Pakhapani, Chimkhola, Kuinemangale (Myagdi) | Survey Lic No: 413 Date: 2065-06-15. PPA signed on 2075-03-29 |
88 | Upper Nyasim Khola | 43.000 | Nyasem Khola | 176 | 2073-08-07 | 2108-08-06 | Sindhujwala Hydropower P. Ltd | Anamnagar, Kathmandu, Phone no. 4245184, 4238575, 9851010735, Email: sindhujwalahydropower@gmail.com | 27o 59' 30" | 28o 01' 10" | 85o 48' 50" | 85o 50' 30" | Gumba (Sindhupalchok) | Survey Lic No: 065/66 BUS 495 Date: 2065-12-28 |
89 | Ruru Banchu Khola- 2 | 12.000 | Rurubanchu Khola | 178 | 2073-09-19 | 2108-09-18 | Ruru hydroelectric Co Pvt. Ltd | Kalanki Kathmandu, Phone no 4426472, 9751089755 | 29o 05' 49" | 29o 06' 39" | 81o 44' 45" | 81o 45' 44" | Gela, Chilkhaya (Kalikot) | Survey Lic No: 353 Date: 2065-02-26 |
90 | Khimti II | 48.800 | Khimti Khola | 179 | 2073-09-22 | 2108-09-21 | Peoples Hydro sahakari Sastha Limited | Shanti Nagar -34, Kathamandu, P.O.Box 10242, Phone 01-4781891, Fax 01-4781891 | 27o 33' 07" | 27o 35' 13" | 86o 10' 00" | 86o 13' 50" | Chyama (Dolakha) Betali, Rasanalu (Ramechhap) | Survey Lic No: 643 Date: 2069-07-15 |
91 | Sisa Khola A Hydropower Project | 2.800 | Sisa | 180 | 2073-09-22 | 2108-09-21 | Upper Solu Hydroelectric Company Pvt Ltd | Hattisar, Kathmandu, Tel: 44269, 4426942, Fax no 4426943, Po. Box no 660, Email ushec@info.com.np | 27o 26' 00" | 27o 27' 00" | 86o 33' 35" | 86o 34' 22" | Gora Khami, Kerung, Garma (Solukhumbu) | Survey Lic No: 606 Date: 2068-03-01 |
92 | Upper Lapche Khola | 52.000 | Lapche | 182 | 2073-10-21 | 2108-10-20 | Energy Venture Pvt. Ltd. | New Baneswor Kathmandu, GPO Box: 6870, Phone 9851025737, 4115573, 4115900 | 28o 03' 00" | 28o 06' 55" | 86o 08' 44" | 86o 11' 45" | Lamabagar (Dolakha) | Survey Lic No: 557 Date: 2067-02-10 |
93 | Daram Khola HEP | 7.300 | Daram | 183 | 2073-10-23 | 2108-10-22 | Daram Khola Hydro Energy Limited | Baglung, Nepal Phone: 9851012086, 9857622240, 068-690939, email : daramkholahydroenergy@gmail.com | 28o 11' 00" | 28o 12' 30" | 83o 19' 00" | 83o 21' 43" | Malm, Righa, Kandebas (Baglung) Arlangkot (Gulmi) | Survey Lic No: 648 Date: 2069-10-15 |
94 | Ankhu Khola | 42.900 | Ankhu Khola | 184 | 2073-10-27 | 2108-10-26 | Ankhu Hydropower Pvt. Ltd | P.O. Box 19554, Kathmandu, Nepal, Phone no 4033752, 4033753, email: ankhuhp@gmail.com | 28o 04' 00" | 28o 07' 00" | 84o 58' 50" | 85o 01' 04" | Darkha, Gumdi, Jharlang, Ree (Dhading) | |
95 | Upper Chirkuwa Khola | 4.700 | Chirkhuwa | 185 | 2073-11-11 | 2108-11-10 | Chirkhuwa Hydropower Company Pvt td | GPO Box: 19387 , Katmandu, phone no 4770297 | 27o 21' 23" | 27o 22' 30" | 87o 04' 48" | 87o 06' 32" | Nepaledada, Mulpani, Khartimchcha (Bhojpur) | Survey Lic No: 582 Date: 2067-06-11 |
96 | Rawa Khola | 3.000 | Rawa Khola | 186 | 2073-11-26 | 2108-11-25 | Rawa Energy Development Pvt Ltd | Ghattekulo, Kathmandu , P.O.Box 20770, Phone 01-4244620 | 27o 20' 28" | 27o 21' 35" | 86o 50' 38" | 86o 51' 33" | Sungdel, Diplung (Khotang) | Survey Lic No: 638 Date: 2069-05-21 |
97 | Sabha Khola-B HPP | 15.100 | Sabha Khola | 187 | 2073-11-30 | 2108-11-29 | Arbit Energy P Ltd | Dillibazar Kathmandu, Phone no 4438203, Email: pokhydropower@gmail.com | 27o 25' 28" | 27o 26' 06" | 87o 19' 58" | 87o 22' 26" | Sabha Pokhari (Sankhuwasabha) | Survey Lic No: 617 Date: 2068-10-15, Pokhari Hydropower Co. P Ltd |
98 | Middle Tara Khola SHP | 1.700 | Tara Khola | 190 | 2073-12-13 | 2108-12-12 | Pahadi Hydropower Company Pvt. Ltd. | Baglung-2, Phone No. : 068-520221, 9747628615 | 28o 19' 11" | 28o 19' 44" | 83o 22' 59" | 83o 24' 15" | Tara (Baglung) | Survey Lic No: 634 Date: 2069-04-32 |
99 | Balephi | 23.520 | Balephi | 191 | 2073-12-16 | 2108-12-15 | Balephi Jalbidhut Company Ltd | GPO Box:772, Kathmandu Ph. No. 01-4224074, 4428732, Fax:01-4266133 | 27o 51' 42" | 27o 53' 42" | 85o 45' 00" | 85o 46' 00" | Baramchi, Golche, Selang (Sindhupalchok) | |
100 | Super Madi | 44.000 | Madi Khola | 192 | 2073-12-17 | 2108-12-16 | Himal Hydro and General Construction Ltd. | P.O.Box 12268, Kathmandu, Phone 01-5000032, 5000211 | 28o 19' 02" | 28o 21' 39" | 84o 04' 45" | 84o 08' 34" | , Namarjung, Parche, Saimrang, Kalika (Kaski) | |
101 | Upper Chauri Khola | 6.000 | Chauri | 194 | 2074-01-29 | 2109-01-28 | Himalayan Water Resources & Energy Development Co. P. Ltd | P.O. Box:2919, Tel: 4477000, 4153055, 984382339, email: ghisingbuilders2049@gmail.com | 27o 34' 18" | 27o 35' 55" | 85o 50' 05" | 85o 51' 49" | (Kabhrepalanchok) | |
102 | Tamakoshi V | 87.000 | Tama Koshi | 193 | 2074-02-09 | 2109-02-08 | Tamakoshi hydropower Company Ltd. | Durbar Marg , Kathmandu | 27o 45' 00" | 27o 49' 50" | 86o 10' 30" | 86o 14' 30" | Lamabagar, Orang, Bulung, Laduk, Gauri Sankar (Dolakha) | Survey Lic No: Date: 0000-00-00 license transferred from Nepal Electricity Authority |
103 | Lower Modi-II Cascade HPP | 10.500 | Modi Khola | 195 | 2074-02-09 | 2109-02-08 | United Modi Hydropower Pvt Ltd | BYS Complex, Kathmandu, Tel: 4350147 Fax: 4350379, email: unitedmodi@ntc.nt.np | 28o 12' 00" | 28o 13' 14" | 83o 40' 28" | 83o 42' 05" | Chuwa, Shivalaya, Katuwa Chaupari (Parbat) | Survey Lic No: 662 Date: 2070-02-22 |
104 | Lower Chirkhuwa | 4.060 | Chirkhuwa | 196 | 2074-02-22 | 2109-02-21 | Chirkhuwa Hydropowerr Pvt. Ltd. | P.O.Box 19387, Kathmandu, Phone 01-4770297 | 27o 22' 00" | 27o 23' 31" | 87o 06' 32" | 87o 08' 30" | Mulpani, Nepaledada (Bhojpur) | Survey Lic No: 534 Date: 2066-08-25 |
105 | Upper Syange Khola SHP | 2.400 | Syange | 197 | 2074-02-22 | 2109-02-21 | Upper Syange Hydropower Pvt. Ltd. | Samakhusi, Kathmandu, P. O. Box: 8975, Phone: 4357646, Fax: 4354186 | 28o 23' 05" | 28o 23' 37" | 84o 22' 48" | 84o 23' 54" | Taghring (Lamjung) | Survey Lic No: 612 Date: 2068-07-30 |
106 | Middle Tamor | 54.000 | Tamor | 198 | 2074-02-22 | 2109-02-21 | Sanima Middle Tamor Hydropower Ltd | Dhumbarahi, Kathmandu, Phone no 437228/437030, email: sanima@sanimahydro.com | 27o 23' 29" | 27o 25' 19" | 87o 40' 01" | 87o 42' 40" | Hangdeva, Khokling, Phurumbu, Sawadin (Taplejung) | Survey Lic No: 302 Date: 2064-11-02 |
107 | Lankhuwa Khola | 5.000 | Lankhuwa | 200 | 2074-03-28 | 2109-03-27 | Sabhapokhri Hydropower Pvt Ltd | P.O. Box. 13901, Kusanti, Lalitpur, Tel: 9849447747 | 27o 25' 25" | 27o 26' 50" | 87o 17' 00" | 87o 18' 30" | Dhupu (Sankhuwasabha) | Survey Lic No: 664 Date: 2070-03-13 |
108 | Mewa Khola Hydropower project | 50.000 | Mewa Khola | 201 | 2074-04-15 | 2109-04-14 | United Mewa Khola Hydropower Pvt Ltd | Kathmandu W.N-29, Dillibazar, Tel: 01-4425833/4421201 | 27o 24' 08" | 27o 26' 52" | 87o 36' 40" | 87o 37' 15" | Khamlung, Khokling, Lingtep, Liwang, Thukima (Taplejung) | |
109 | Nilgiri Khola | 38.000 | Nilgiri | 202 | 2074-04-31 | 2109-04-30 | Nilgiri Khola Hydropower Company Pvt. Ltd. | Panipokhari, Kathmandu, Phone: 4437705, 4441648 | 28o 34' 37" | 28o 36' 00" | 83o 40' 00" | 83o 43' 00" | , Narchyang (Myagdi) | Survey Lic No: 393 Date: 2065-05-06 |
110 | Buku-Kapati Hydropower Project | 5.000 | Buku | 203 | 2074-05-08 | 2109-05-07 | Him Star Urja Company Ltd. | Baluwatar-4, Kathmadu. PO Box : 20762, Phone no 4167507, 6911637 | 27o 30' 00" | 27o 31' 20" | 86o 22' 34" | 86o 24' 10" | Bhussinga, Rawadolu (Okhaldhunga) Goli (Solukhumbu) | Survey Lic No: 687 Date: 2071-09-01 |
111 | Super Nyadi Hydropower Project | 40.270 | Nyadi | 204 | 2074-05-14 | 2109-05-13 | Siuri Nyadi Power Pvt. Ltd | GPO Box no 14165, Anamnagar Kathmandu, Tel 4223608, 4238159, email: supernyadi@siurihydro.com | 28o 21' 09" | 28o 24' 23" | 84o 26' 57" | 84o 30' 18" | Bahundada, Bhulbhule (Lamjung) | Survey Lic No: 693 Date: 2071-10-04 FC completed on 18th march 2018 |
112 | Seti Khola HPP | 3.500 | Seti Khola | 205 | 2074-05-26 | 2109-05-25 | Parbat Paiyu Khola Hydropower Company | Head Office , Kathmandu Tel: 2093013, Fax: 4385668 | 28o 00' 37" | 28o 02' 05" | 83o 36' 45" | 83o 37' 30" | Shivalaya (Parbat) | Survey Lic No: 065/66 BUS 0513 Date: 2066-03-30 |
113 | Marsyangdi Besi | 50.000 | Marsyangdi | 206 | 2074-06-01 | 2109-05-31 | Divyajyoti Hydropower Pvt. Ltd. | Bagdol Lalitpur, P.O.Box 23311, Phone no 5552175 | 28o 12' 00" | 28o 16' 00" | 84o 21' 15" | 84o 24' 40" | Besisahar, Chandisthan, Bhulbhule, Gaunsahar, Bajhakhet, Hiletaxar (Lamjung) | Survey Lic No: 420 Date: 2065-06-30 |
114 | Upper Trishuli-1 | 216.000 | Trishuli | 209 | 2074-07-23 | 2109-07-22 | Nepal Water & Energy Development Co. P. Ltd | Narayan Chaur, Naxal, Kathmandu P.O.Box: 786, Ph: 4412257, 4412229 | 28o 04' 27" | 28o 07' 42" | 85o 12' 40" | 85o 18' 03" | Dhunche, Haku (Rasuwa) | Survey Lic No: 265 Date: 2063-09-24 |
115 | Istul Khola HPP | 1.506 | Istul | 210 | 2074-08-14 | 2109-08-13 | Amar Jyoti Hydropower Pvt Ltd | Man Bhavan , Lalitpur -20, PO- 134, Tel: 01-5552175 | 28o 04' 12" | 28o 05' 59" | 84o 45' 00" | 84o 46' 00" | Aarupokhari (Gorkha) | Survey Lic No: 595 Date: 2067-11-30 |
116 | Sapsup Khola Small Hydro Electric Project | 7.151 | Sapsup Khola | 211 | 2074-08-29 | 2109-08-28 | Three Star Hydro Power Pvt.Ltd. | 593/55 Kha Thapa Gaun, New Banesor-10, Kathmandu.4468423, 9851105341 | 27o 06' 31" | 27o 08' 34" | 86o 44' 20" | 86o 45' 23" | Batase, Chhorambu, Rajapani (Khotang) | Survey Lic No: 746 Date: 2073-07-05 |
117 | Lapche Khola | 160.000 | Lapche | 212 | 2074-09-02 | 2109-09-01 | Nasa Hydropower Company P Ltd | Laxman Babu Bhawan, Naxal, Kathmandu, Phone no 4414355, 4414651, 9801012101, email: info@mvdugarhydro.com | 27o 58' 51" | 28o 02' 58" | 86o 10' 00" | 86o 12' 58" | Lamabagar (Dolakha) | Survey Lic No: 066/67 BUS 521 Date: 2066-06-26 |
118 | Kasuwa Khola HPP | 45.000 | Kasuwa | 213 | 2074-09-03 | 2109-09-02 | Kasuwa Hydropower Ltd | Tripureshwor, Kathmandu, Tel: 4101140, 4251080, email: info@kasuwakhola.com.np | 27o 35' 01" | 27o 37' 39" | 87o 16' 00" | 87o 17' 56" | Makalu, Pathibhara (Sankhuwasabha) | Survey Lic No: 629 Date: 2069-04-03 |
119 | Richet Khola SHP | 5.000 | Richet | 214 | 2074-09-04 | 2109-09-03 | Richet Jalbidhyut Company Pvt. Ltd. | Lalitpur-15, Mahalaxmisthan, phone no 5527469, 55237849, 9851006013, email: richethydro@gmail.com | 28o 10' 10" | 28o 10' 55" | 84o 54' 58" | 84o 55' 51" | Manbu, Kashigaun (Gorkha) | Survey Lic No: 689 Date: 2071-09-13 |
120 | Saptang Khola HPP | 2.500 | Saptang | 215 | 2074-09-21 | 2109-09-20 | Saptang Hydropower Pvt Ltd | Kathmandu-16, Naya Bazar, Tel:9851035832, 9851076449 | 28o 00' 00" | 28o 00' 59" | 85o 05' 16" | 85o 07' 07" | Bungtang (Nuwakot) | Survey Lic No: 596 Date: 2067-12-07 |
121 | Buku Khola | 6.000 | Buku | 216 | 2074-09-25 | 2109-09-24 | Apolo Hydropower Pvt.Ltd | Lalitpur, phone: 5201375 | 27o 30' 47" | 27o 31' 35" | 86o 20' 55" | 86o 22' 34" | Bhussinga, Rawadolu (Okhaldhunga) Goli (Solukhumbu) | Survey Lic No: 645 Date: 2069-06-15 |
122 | Nyam Nyam | 6.000 | Nyam Nyam Khola | 217 | 2074-09-28 | 2109-09-27 | Nyam Nyam HydroPower Company Pvt.Ltd. | Sanepa, Phone no 5184273, 5184173, email nyamnyamkshp@gmail.com | 28o 04' 15" | 28o 05' 10" | 85o 11' 05" | 85o 12' 40" | Dandagoun (Rasuwa) | Survey Lic No: 374 Date: 2065-03-30 |
123 | Super Trishuli | 100.000 | Trishuli | 218 | 2074-10-07 | 2109-10-06 | Blue Energy Pvt. Ltd | GPO Box: 9609, Kathmandu, Nepal. Tel : 4216606, 4221305, email dibya.pant@gmail.com | 27o 48' 41" | 27o 52' 56" | 84o 34' 00" | 84o 41' 06" | Darechauk (Chitawan) Jogimara (Dhading) Makaising, Tanglichok, Bhumlichok, Ghyalchok, Taklung, Manakamana (Gorkha) | Survey Lic No: 066/67 BUS 532 Date: 2066-08-26 |
124 | Rele Khola | 6.000 | Rele Khola | 221 | 2074-10-28 | 2109-10-27 | Hym Consult | SiphalKathmandu, Ph 4489327, 4491271 | 28o 30' 24" | 28o 32' 00" | 83o 40' 43" | 83o 42' 00" | Narchyang (Myagdi) | Survey Lic No: 618 Date: 2068-11-12 |
125 | Irkhuwa Khola-B HPP | 15.524 | Irkhuwa Khola | 222 | 2074-11-03 | 2109-11-02 | Barah Multi Power Pvt Ltd | House No 171/16 Anamnagar, Gautam Buddha MargaKathmandu , Tel : 4255190, email info@barahamultipower.com | 27o 23' 47" | 27o 25' 16" | 87o 03' 52" | 87o 05' 56" | Kudak Kaule, Chaukidada, Nepaledada (Bhojpur) | Survey Lic No: 621 Date: 2069-01-20 |
126 | Rasuwa Bhotekoshi | 120.000 | Bhote koshi | 223 | 2074-11-03 | 2109-11-02 | Langtang Bhotekosi Hydropower Company Pvt. Ltd | Sitapaila, Kathmandu, Tel no 9810157778, 9843077976, email langtangproject@gmail.com, liaoxiangi@hotmail.com | 28o 10' 30" | 28o 14' 04" | 85o 20' 00" | 85o 22' 30" | Thuman, Briddhim, Goljung (Rasuwa) | Survey Lic No: 577 Date: 2067-04-27 |
127 | Upper Gaddi Gad | 1.550 | Gaddi Gad | 225 | 2074-11-30 | 2109-11-29 | Shaileshwari Power Nepal | Sukedhara, Kathmandu, Phone no 9851034375, email saileshwori.power.17@gmail.com | 29o 16' 41" | 29o 17' 23" | 81o 03' 25" | 81o 05' 00" | Gaihragau, Kadamadaun, Sanagau (Doti) | Survey Lic No: 360 Date: 2065-03-17 |
128 | Upper Modi HPP cascade project | 14.000 | Modi Khola | 226 | 2074-12-02 | 2109-12-01 | Nepal Electricity Authority | Kathmandu | 28o 18' 45" | 28o 20' 32" | 83o 46' 11" | 83o 48' 00" | Dangsing, Ghandruk, Lumle (Kaski) | Survey Lic No: 674 Date: 2070-11-05 |
129 | Taman Khola | 4.850 | Taman | 227 | 2074-12-25 | 2109-12-24 | Taman Khola Hydro Pvt. Ltd. | Tokha4358730, email tamankhydro@gmail.comKathmandu | 28o 20' 00" | 28o 21' 17" | 83o 10' 00" | 83o 11' 03" | Burtiwang (Baglung) | Survey Lic No: 354 Date: 2065-03-02 |
130 | Mai Beni HPP | 9.510 | Mai Khola | 228 | 2075-01-06 | 2110-01-05 | Samling Power company Pvt.Ltd | Baneshwor 10, Kathmandu, Phone no 9851018025, 5539135, 5525228 | 26o 53' 09" | 26o 55' 41" | 87o 56' 38" | 87o 57' 30" | Namsaling, Soyang, Goduk (Ilam) | Survey Lic No: 680 Date: 2071-02-02 |
131 | Middle Daram Khola-A HPP | 3.000 | Daram | 230 | 2075-02-09 | 2110-02-08 | Dhaulagiri Cem Engineering Pvt Ltd | Baglung | 28o 15' 54" | 28o 16' 44" | 83o 24' 30" | 83o 26' 22" | Heel, Argal, Amarbhumi (Baglung) | Survey Lic No: 622 Date: 2069-01-26 |
132 | Middle Daram Khola-B HPP | 4.500 | Daram | 231 | 2075-02-09 | 2110-02-08 | Dhaulagiri CEM Engineering Pvt. Ltd. | Baglung-11, Mobile 9745025919 | 28o 14' 05" | 28o 15' 54" | 83o 24' 30" | 83o 26' 22" | Amarbhumi, Harichaur, Heel (Baglung) | Survey Lic No: 623 Date: 2069-01-26 |
133 | Upper Khudi | 26.000 | Khudi | 232 | 2075-02-09 | 2110-02-08 | Super Khudi Hydropower Co.Pvt. Ltd. | P.O.Box 19554, Kathmandu, Phone 01-4434003, 4424644 | 28o 18' 22" | 28o 21' 50" | 84o 18' 32" | 84o 20' 44" | Ghanpokhara, Khudi (Lamjung) | Survey Lic No: 359 Date: 2065-03-15 |
134 | Upper Chhyandi Small HPP | 4.000 | Chhyangdi | 233 | 2075-02-09 | 2110-02-08 | Chhyandi Hysropower LTD | Gairidhara-2, Kathmandu, 4426483, PO 19380 | 28o 16' 05" | 28o 17' 46" | 84o 28' 38" | 84o 29' 57" | Bansar, Faleni (Lamjung) | Survey Lic No: 715 Date: 2072-11-20 |
135 | Upper Tamor | 285.000 | Tamor | 234 | 2075-02-27 | 2110-02-26 | Tamor Sanima Energy P. Ltd | P.O. Box: 19737, Ph: 4445952, Fax: 4425953 | 27o 25' 19" | 27o 30' 45" | 87o 41' 40" | 87o 48' 03" | Phurumbu, Linkhim, Lelep, Tapethok (Taplejung) | |
136 | Hewa A Small HEP | 5.000 | Hewa Khola | 235 | 2075-04-14 | 2110-04-13 | Habitat Power Company Pvt. Ltd | 01-4469808, 9841531682 | 27o 10' 40" | 27o 11' 38" | 87o 51' 00" | 87o 53' 15" | Ekteen, Yanganam, Memeng, Sidin (Panchthar) | Survey Lic No: 650 Date: 2069-10-21 |
137 | Tila-1 Hydropower Project | 440.000 | Tila | 236 | 2075-05-08 | 2110-05-07 | S C Power Company P Ltd | PO Box 23704, Kathamdu | 29o 06' 00" | 29o 08' 40" | 81o 35' 00" | 81o 44' 38" | Dahafatgaun, Gela, Manma, Mugraha, Pakha, Sukitaya (Kalikot) | Survey Lic No: 065/66 BUS 492 Date: 2065-12-20 |
138 | Tila-2 Hydropower Project | 420.000 | Tila | 237 | 2075-05-08 | 2110-05-07 | S C Power Company Pvt Ltd | PO Box 23704, Kathamdu | 29o 06' 00" | 29o 10' 00" | 81o 44' 38" | 81o 52' 00" | Pakha (Kalikot) | Survey Lic No: 065/66 BUS 493 Date: 2065-12-20 |
139 | Upper Phawa HPP | 5.800 | Phawa Khola | 238 | 2075-05-19 | 2110-05-18 | Unitech Hydropower Company Pvt.ltd. | Kathmandu-32. 01-4489018, 98560 66100 | 27o 19' 04" | 27o 21' 02" | 87o 46' 05" | 87o 48' 12" | Sikaicha, Tiringe (Taplejung) | Survey Lic No: 701 Date: 2072-01-15 |
140 | Super Aankhu Khola Hydropower Project | 25.400 | Ankhu Khola | 239 | 2075-06-02 | 2110-06-01 | Gorakshya Hydropower Pvt.Ltd | Babarmahal, Kathmandu-11, 4219730, 4225281, 9851021920; Email: gorakshya.hydropower@yahoo.com | 28o 10' 00" | 28o 11' 44" | 85o 02' 56" | 85o 04' 45" | Lapa, Sirtung (Dhading) | Survey Lic No: 700 Date: 2072-01-15, present location Rubi Valley RM |
141 | Puwa II hydropower Project | 4.960 | Puwa | 240 | 2075-06-23 | 2110-06-22 | Peoples' Power Ltd | Kamal Pokhari Kathmandu; PH. -014462844, 01-4437611 | 26o 57' 14" | 26o 59' 24" | 87o 53' 49" | 87o 54' 34" | Sakhejung, Maipokhari, Barbote (Ilam) | Survey Lic No: 651 Date: 2069-10-22; Ilam Municipality |
142 | Nilgiri Khola-II cascade Project | 62.000 | Nilgiri | 241 | 2075-07-07 | 2110-07-06 | Nilgirikhola Hydropower Company Limited | Heritage Plaza -1 Kamaladi, Kathmandu -28, GPO Box: 7970, Tel: 01-416908905 | 28o 32' 17" | 28o 34' 37" | 83o 40' 00" | 83o 43' 00" | Narchyang (Myagdi) | Survey Lic No: 678 Date: 2071-01-05; Annapurna RM |
143 | Lower Manang Marsyangdi | 140.000 | Marsyangdi | 242 | 2075-07-18 | 2110-07-17 | Butawal Power Company | Budhanagar, Kathmandu Tel: 4781776, 4785295 | 28o 29' 35" | 28o 32' 30" | 84o 20' 00" | 84o 21' 55" | , Tachi Bagarchhap, Dharapani, Thoche (Manang) | Survey Lic No: 065/66 BUS 504 Date: 2066-02-11, Nasho Rural Municipality |
144 | Manang Marsyangdi | 282.000 | Marsyangdi | 243 | 2075-08-01 | 2110-07-30 | Manang Marsyangdi Hydropower Company Pvt.Ltd. | P.O.Box 12566 Kathmandu-4, Phone 9803298663, 9841286805; emai:mmhpp777@gmail.com | 28o 31' 27" | 28o 33' 37" | 84o 15' 38" | 84o 20' 00" | Chame, Tachi Bagarchhap (Manang) | Survey Lic No: 363 Date: 2065-03-19; Nasho and Chame RUral Municipality |
145 | Badigad (Kolti) | 4.500 | Badigad | 244 | 2075-08-16 | 2110-08-15 | Pioneer Hydro Pvt.Ltd | Kathmandu-32, Koteshwor; Phone: 01-2012467, 9851063224; email: kwshun06@hotmail.com | 29o 29' 34" | 29o 30' 24" | 81o 39' 14" | 81o 41' 26" | Kolti, Kotila (Bajura) | Survey Lic No: 388 Date: 2065-04-28, bhUdhinnd Minicipality Sudurpaschim Pradesh |
146 | Garchyang Khola | 6.600 | Garchyang | 245 | 2075-08-18 | 2110-08-17 | Citizen Hydropower Company Pvt. Ltd. | Ring Road Naya Bato, Lalitpur; POB No 20732, Kathmandu Mobile No. 9851029387, Fax 0150014274649 | 28o 21' 37" | 28o 22' 46" | 84o 08' 45" | 84o 10' 10" | Namarjung (Kaski) | Survey Lic No: 655 Date: 2069-12-27; Gandaki Pradesh MADI RM |
147 | Upper Marsyangdi 1 | 138.000 | Marsyangdi | 247 | 2075-09-10 | 2110-09-09 | Upper Marsyangdi Hydropower Company Pvt. Ltd. | Kathmandu 4, Baluwatar, Phone 9841286805, 9844040118; email: mmhpp777@gmail.com | 28o 19' 28" | 28o 22' 25" | 84o 23' 51" | 84o 25' 00" | Taghring, Khudi, Ghermu, Bahundada (Lamjung) | Survey Lic No: 376 Date: 2065-04-15; Marsyandi Gaupalika |
148 | Upper Lohore SHP | 4.000 | Lohore Khola | 246 | 2075-09-16 | 2110-09-15 | Upper Lohore Khola Hydropower Company. Pvt. Ltd | P.Box.No. 4708, Buddhanagar, Newbaneswor, Kathmandu 4783012, 9751029016 & 9841736253 | 28o 56' 01" | 28o 57' 21" | 81o 48' 13" | 81o 48' 40" | Baluwatar (Dailekh) | Survey Lic No: 688 Date: 2071-09-07 |
149 | Chameliya (Chhetigad) | 85.000 | Chameliya Khola | 248 | 2075-09-20 | 2110-09-19 | Grid Nepal Co. Pvt. Ltd., | 531Pandol Marg Lajimpat, Kathmandu, Ph. 01-4442049, 9841412569; thakurpujachand@email.com, hydrovision@gmail.com | 29o 47' 00" | 29o 50' 00" | 80o 48' 49" | 80o 53' 00" | Ghusa, Guljar, Khandeswori, Sitaula (Darchula) | Survey Lic No: 296 Date: 2064-09-09; Sudarpaschim, Apihimal RM |
150 | Upper Piluwa Hills Small HP Project | 4.990 | Piluwa, Tupuwa & Chhange Khola | 249 | 2075-09-23 | 2110-09-22 | Milke Jaljale Hydropower Pvt.Ltd. | P.O.Box. 21363, Koteswor Kathmandu-34; 9852051608; email: milkejaljalehp@gmail.com | 27o 18' 08" | 27o 20' 00" | 87o 25' 46" | 87o 27' 55" | Nundhaki, Siddhakali (Sankhuwasabha) | Survey Lic No: 659 Date: 2070-02-27; Chainpur Municipality, Pradesh 1. |
151 | Kaligandki Gorge | 164.000 | Kali Gandaki | 251 | 2075-11-27 | 2110-11-26 | Kaligandaki Hydropower P. Ltd, Charkhal, Dillibazar, Karhmandu | P.O.Box 19554, Phone - 977-1-4424644, 4424655, 4434003, Email: kgghydro@gmail.com | 28o 31' 15" | 28o 36' 15" | 83o 37' 15" | 83o 40' 00" | Dana, Narchyang, Dana (Myagdi) | Survey Lic No: 264 Date: 2063-09-23, Thasang & Annapurna RM |
152 | Nyadi-Phidi HPP | 21.400 | Nyadi, Phidi | 252 | 2075-11-27 | 2110-11-26 | North Summit Hydro Pvt.ltd. | Anamnagar-32, Kathmandu, POB: 2060 kath.; PN: 4219143, 984151223; email: n.s.hydro2016@gmail.com | 28o 24' 27" | 28o 26' 12" | 84o 30' 10" | 84o 31' 43" | Bahundada, Bhulbhule (Lamjung) | Survey Lic No: 730 Date: 2073-03-24; Marshyandi Rural Municipality |
153 | Upper Rahughat | 48.500 | Rahughat | 253 | 2075-12-11 | 2110-12-10 | Tudi Power Company Pvt.Ltd | P.O.Box 6341, Sanepa Lalitpur, Phone 01-5555573, 01-5555574; tundicons@gmail.com | 28o 25' 46" | 28o 28' 30" | 83o 30' 00" | 83o 31' 50" | Chimkhola, Dagnam, Jhin, Pakhapani (Myagdi) | Survey Lic No: 358 Date: 2065-03-05; Rahuganga RM |
154 | Super Hewa HPP | 5.000 | Hewa Khola | 254 | 2075-12-26 | 2110-12-25 | Super Hewa Power Com. Pvt.Ltd. | Kathmandu-32, Anamnagar.P O BOX 21363, 9851027259; superhewapc@gmail.com | 27o 20' 55" | 27o 22' 15" | 87o 22' 25" | 87o 24' 22" | Jaljala, Siddhapokhari (Sankhuwasabha) | Survey Lic No: 726 Date: 2073-03-10; Chainpur & Panchpakhan Municipalities. |
155 | Middle Kaligandaki | 53.539 | Kali Gandaki | 255 | 2076-01-09 | 2111-01-08 | Hydro Support Pvt. Ltd. | IME Complex, Panipokhari, Kathmandu. PO Box: 12538, Kathmand; middlekaligandakihpp@gmail.comu. Phone: 014430600, Fax: 01 | 28o 28' 56" | 28o 31' 14" | 83o 38' 00" | 83o 40' 00" | Tatopani, Dana, Narchyang (Myagdi) | Survey Lic No: 670 Date: 2070-07-15; Annapurna RM |
156 | Tadi Khola Cascade | 3.000 | Tadi Khola | 256 | 2076-01-30 | 2110-01-29 | Hira Ratna Hydropower Company Pvt. Ltd | Samakhusi, Kathmandu-29 Tel 4020023 | 27o 55' 16" | 27o 56' 04" | 85o 22' 53" | 85o 23' 29" | Samundratar (Nuwakot) | Survey Lic No: 721 Date: 2073-03-02 |
157 | Bajra Madi Hydropower Project | 24.800 | Madi Khola | 257 | 2076-02-07 | 2111-02-06 | Bajra Energy Ventures Pvt. Ltd. | Baghdurbar, Sundhara, Kathmandu, Phone: 4242628, Mobile: 9841793347 | 28o 12' 30" | 28o 15' 30" | 84o 04' 00" | 84o 07' 30" | Kalika, Thumakodanda (Kaski) | Survey Lic No: 640 Date: 2069-06-29 |
158 | Upper Richet Khola SHP | 2.000 | Richet | 258 | 2076-02-07 | 2111-02-06 | Upper Richet Hydropower Pvt. Ltd. | Lalitpur-1, Kupondole; tel: 01-4472349; emai: urhppl@gmail.com | 28o 10' 56" | 28o 11' 53" | 84o 55' 52" | 84o 56' 49" | Kashigaun, Manbu (Gorkha) | Survey Lic No: 692 Date: 2071-10-02 |
159 | Jhyaku Khola HPP | 5.243 | Jhyaku | 259 | 2076-02-08 | 2111-02-07 | Ganesh Hydro power Com.Pvt.Ltd | Block 219, Kathmandu-9, Ratopol, 4461318, 9851038038 | 27o 40' 41" | 27o 43' 40" | 86o 09' 46" | 86o 12' 42" | Jhyaku, Jugu (Dolakha) | Survey Lic No: 724 Date: 2073-03-09 |
160 | Upper Trishui-2 HPP | 102.000 | Trishuli | 262 | 2076-02-09 | 2111-02-08 | Hydrochina Corporation | No.2 Beixiaojie Street Lipukang Dewai Beijing China, Tel: +86-10-5197 5898, Fax: +86-10-8208-4665 | 28o 07' 43" | 28o 10' 00" | 85o 18' 04" | 85o 21' 09" | Haku (Rasuwa) | Survey Lic No: 555 Date: 2067-02-12 |
161 | Tinau Khola HPP | 3.440 | Tinau | 261 | 2076-02-14 | 2111-02-13 | Nama Buddha Hydropower Pvt Ltd | PO Box: 5558, Kathmandu, Mobile: 9851034098, Tel: 016-9225115; Email: nbhydro@wlink.com.np | 27o 44' 45" | 27o 46' 00" | 83o 30' 12" | 83o 32' 00" | Koldada (Palpa) | Survey Lic No: 668 Date: 2070-06-01 |
162 | Likhu Khola HPP | 30.000 | Likhu Khola | 263 | 2076-02-24 | 2111-02-23 | P K Hydropower Pvt. Ltd. | P.O.Box. 5947, Kathmandu, 9741048107 | 27o 29' 10" | 27o 31' 07" | 86o 18' 00" | 86o 21' 44" | Rawadolu, Khijichandeshwari (Okhaldhunga) Pritee, Kubukasthali (Ramechhap) Goli (Solukhumbu) | Survey Lic No: 663 Date: 2070-03-07 |
163 | Lower Jogmai Khola HPP | 6.200 | Jogmai Khola | 264 | 2076-03-12 | 2111-03-11 | Asian Hydropower Pvt. Ltd | Kathmandu-10 New Baneshwor, P.O. Box 9879, 4491882, 4470887, 9851018025 | 26o 53' 00" | 26o 53' 56" | 87o 57' 26" | 87o 59' 50" | Namsaling, Goduk, Panchakanya (Ilam) | Survey Lic No: 787 Date: 2073-11-24; Mai Jogmai RM , Suryodaya Municipality & Ilam Municipality |
164 | Upper Suri Khola HPP | 7.000 | Hulak, Kolung | 268 | 2076-04-15 | 2111-04-14 | Makar Jitumaya Hudropower Pvt.Ltd. | Kathmandu-11, Tripureswor, | 27o 43' 30" | 27o 44' 30" | 86o 15' 10" | 86o 17' 00" | Chankhu (Dolakha) | Survey Lic No: 698 Date: 2071-11-11; Gaurisankar RM |
165 | Upper Midim Khola SHP | 7.500 | Midim Khola | 272 | 2076-05-26 | 2111-05-25 | Bhujung Hydro Power Pvt.Ltd., | Kathmandu-34, Baneshowr, Kathmandu, 4480564, 9851026587 | 28o 19' 01" | 28o 20' 50" | 84o 14' 40" | 84o 15' 54" | Bhujung (Lamjung) | Survey Lic No: 720 Date: 2073-02-20 |
166 | Upper Chameliya HP | 40.000 | Chameliya Khola | 273 | 2076-06-12 | 2111-06-11 | Api Power Co. Ltd | Trade Tower Thapathali, Kathmandu 11, ph 01-5111037, 9801147087 (sanjib); email: info@apihydro.com; Web: www.apihydro.com | 29o 44' 20" | 29o 46' 57" | 80o 46' 50" | 80o 49' 12" | Tapoban, Latinath, Guljar, Sitaula (Darchula) | Survey Lic No: 713 Date: 2072-10-17; Marma & ApiHimal Rural Municipality, Sudarpaschim pradesh |
167 | Chisang Khola -A Small HEP | 1.800 | Chisang | 275 | 2076-07-24 | 2111-07-23 | Chisang Hydro Pvt Ltd | Kirtipur-17, Kathmandu, Tel: 9841617469 | 26o 48' 32" | 26o 50' 00" | 87o 28' 45" | 87o 29' 59" | Warangi (Morang) | Survey Lic No: 676 Date: 2070-12-09; Letang & Kerabari |
168 | Lower Hewa Khola-A HPP | 7.300 | Hewa Khola | 276 | 2076-07-26 | 2111-07-25 | Panch Khapan Hydropower P.Ltd. | Kathmandu-34, Banesor, Nepal, 016201315, 4116068, panchkhapan hydropower2072@gmail.com | 27o 17' 48" | 27o 19' 10" | 87o 16' 22" | 87o 18' 59" | Bana, Baneswor, Chainpur, Jaljala (Sankhuwasabha) | Survey Lic No: 722 Date: 2073-03-05, Revenue slip no. 6593 dated 2076-02-30 |
169 | Kabeli B1 Cascade HPP | 9.940 | Kabeli Khola | 277 | 2076-07-26 | 2111-07-25 | Arun Valley Hydropower Development Company Ltd. | Trade Tower Nepal, 2 nd floor, Thapathali, Kathmandu | 27o 16' 02" | 27o 16' 50" | 87o 45' 51" | 87o 47' 00" | Ambarpur, Nagi (Panchthar) | Survey Lic No: 732 Date: 2073-04-05 |
170 | Sagu Khola HEP | 20.000 | Sangu Khola | 278 | 2076-08-12 | 2111-08-11 | Him Parbat Hydropower Pvt. Ltd. | World Trade Centre, Tripureshwor 5th floor, Kathmandu, 01-4117008, 01-4117079, himal Gurung 9851053161, P.O Box 8941 | 27o 47' 18" | 27o 49' 49" | 86o 05' 35" | 86o 07' 20" | Alampu, Chilankha, Khupachagu (Dolakha) | Survey Lic No: 805 Date: 2073-12-30; Pipu RM |
171 | Chepe Khola Small HEP | 8.630 | Chepe Khola | 279 | 2076-08-16 | 2111-08-15 | Aashutosh Investment Pvt. Ltd. | KMC-16, Kathmandu, 01-4359237 (Jivraj Kandel) | 28o 10' 39" | 28o 12' 55" | 84o 37' 26" | 84o 39' 05" | Kharibot (Gorkha) Dudhpokhari (Lamjung) | Survey Lic No: 843 Date: 2074-02-24 |
172 | Dudhkunda Khola HEP | 12.000 | Solu Khola | 280 | 2076-08-18 | 2111-08-17 | Mount Everest Power Development P.Ltd. | Mahalaxmisthan , Lalitpur-13, Ph. 01-5523784, 5527469, 9851039258(Arjun Paudel) | 27o 35' 10" | 27o 37' 05" | 86o 35' 52" | 86o 36' 48" | Beni, Takasindu (Solukhumbu) | Survey Lic No: 793 Date: 2073-12-08 |
173 | Upper Ankhu Khola | 38.000 | Ankhu Khola | 280 | 2076-09-07 | 2111-09-06 | Dhading Ankhu Khola Hydro Pvt. Ltd. | Sumargi B. Complex, Babarmahal-11, Kathmandu | 28o 07' 00" | 28o 10' 00" | 85o 00' 00" | 85o 03' 30" | Jharlang, Lapa, Sirtung (Dhading) | Survey Lic No: 672 Date: 2070-08-14 |
174 | Upper Machha Khola HEP | 4.550 | Machha Khola | 283 | 2076-09-29 | 2111-09-28 | Bikash Hydropower Company Pvt. Ltd. | Maharajgunj-3, Kathmandu, 01-4445083, 4445084, 9851073099, Contact no; Krishna prasad ghimire | 28o 12' 33" | 28o 13' 20" | 84o 48' 27" | 84o 49' 27" | Gumda, Laprak (Gorkha) | Survey Lic No: 927 Date: 2074-07-12 (Syndicated Loan agreement with RBB dated 2076-12-06 submitted to DoED on 2077-03-21) |
175 | Bhim Khola Small HEP | 4.960 | Bhim Khola | 284 | 2076-09-29 | 2111-09-28 | Shikhar Power Development Pvt.Ltd. | Baneshower, Kathmandu 9851133303 | 28o 17' 05" | 28o 17' 42" | 83o 13' 34" | 83o 15' 18" | Gwalichaur, Bhinggithe, Ranasinkiteni (Baglung) | Survey Lic No: 727 Date: 2073-03-10 |
176 | Jogmai Cascade | 5.200 | Jogmai Khola | 285 | 2076-10-01 | 2111-09-30 | Sanvi Energy Pvt. Ltd. | Kupondole, Lalitpur. PO Box: 9875 EPC 3141 | 26o 53' 47" | 26o 54' 52" | 87o 59' 50" | 88o 01' 09" | Namsaling (Ilam) | Survey Lic No: 686 Date: 2071-06-22 |
177 | Sangu Khola HPP | 5.000 | Sangu (Sorun) Khola | 286 | 2076-10-01 | 2111-09-30 | Kalinchowk Hydropower Pvt. Ltd. | Galkopakha, T^hamel, Kathmandu-26, (Samakhusi road) Tel: 01-4358332 | 27o 47' 13" | 27o 48' 15" | 86o 04' 00" | 86o 07' 03" | Kalingchok, Khupachagu (Dolakha) | Survey Lic No: 771 Date: 2073-08-17 |
178 | Middle Mewa HPP | 49.000 | Mewa Khola | 289 | 2076-10-12 | 2111-10-11 | Mewa Developers Pvt. LTd | Tripurewhower , Kathmandu-11. 4243120 | 27o 26' 52" | 27o 30' 29" | 87o 36' 30" | 87o 38' 15" | Liwang, Sanwa, Nalbu, Papung, Thukima (Taplejung) | Survey Lic No: 776 Date: 2073-09-05 |
179 | Nupche Likhu HEP | 57.500 | Nupche , Likhu | 290 | 2076-10-12 | 2111-10-11 | Vision Energy and Power Pvt. Ltd. | New Baneshwor, Kathmandu | 27o 40' 37" | 27o 43' 37" | 86o 26' 30" | 86o 30' 30" | Gumdel (Ramechhap) | Survey Lic No: 826 Date: 2074-02-12 |
180 | Upper Myagdi-I HEP | 53.500 | Myagdi Khola | 291 | 2076-10-21 | 2111-10-20 | Upper Myagdi Hydropower Pvt. Ltd | Ka. Ma.Na.Pa-31 | 28o 27' 30" | 28o 31' 10" | 83o 20' 44" | 83o 23' 06" | Bima, Marang, Takam, Muna, Mudi (Myagdi) | Survey Lic No: 671 Date: 2070-08-13 |
181 | Sagu khola 1 HPP | 5.500 | Sagu | 292 | 2076-10-21 | 2111-10-20 | Him Parbat Hydropower Pvt. Ltd | Tripureshwor 11 KTM, 4117079, 9851053161 | 27o 49' 49" | 27o 50' 39" | 86o 05' 48" | 86o 06' 40" | Alampu, Chilankha (Dolakha) | Survey Lic No: 816 Date: 2074-02-02 |
182 | Phedi Khola (Thumlung) Small HPP | 3.520 | Phedi khola (Thumlung) | 293 | 2076-11-15 | 2111-11-14 | Phedi khola Hydropower Company Pvt. Ltd. | Koteshor 32, Ktm. , Prakash Chandra Dulal. Mob No. 9851221372, 01599321; prakshdulal@gmail.com | 27o 22' 13" | 27o 23' 00" | 87o 00' 29" | 87o 01' 32" | Dobhane (Bhojpur) | Survey Lic No: 800 Date: 2073-12-21; Salpasilichho RM |
183 | Thulo Khola Hydropower Project | 21.300 | Thulo Khola | 294 | 2076-12-10 | 2111-12-09 | Samyukta Urja Pvt. Ltd | kupondole., Lalitpur, samyuktaurja@gmail.com | 28o 32' 26" | 28o 35' 00" | 83o 31' 00" | 83o 33' 00" | Kuinemangale (Myagdi) | Survey Lic No: 705 Date: 2072-06-15 |
184 | Chepe Khola HEP | 7.000 | Chepe Khola | 297 | 2077-02-15 | 2112-02-14 | Champawati Hydro Power P.Ltd | Kathmandu -14 Balkhu, 4036085, 4036086 | 28o 07' 10" | 28o 08' 23" | 84o 33' 06" | 84o 35' 00" | Thalajung, Kerabari (Gorkha) | Survey Lic No: 707 Date: 2072-08-16 |
185 | Upper Irkhuwa HPP | 14.500 | Irkhuwa, Phedi | 295 | 2077-02-23 | 2112-02-22 | Aarati Power Company Ltd. | Kathmandu-32, Kotesor. 9851221372;email: aaratipower@gmail.com | 27o 22' 58" | 27o 24' 17" | 87o 01' 33" | 87o 03' 51" | Dobhane, Khatamma, Kudak Kaule (Bhojpur) | Survey Lic No: 740 Date: 2073-06-09, Salpasilicho RM & Sadananda Municipality. |
186 | Isuwa Khola Hydropower Project | 97.200 | Isuwa Khola | 296 | 2077-02-27 | 2112-02-26 | KBNR Isuwa Power Ltd. | Biratnagar -13, Morang, Nepal 021472227 | 27o 34' 03" | 27o 37' 00" | 87o 11' 23" | 87o 14' 30" | Makalu (Sankhuwasabha) | Survey Lic No: 697 Date: 2071-11-04 |
187 | Upper Maiwa HPP | 17.850 | Maiwa | 298 | 2077-03-03 | 2112-03-02 | Kang Hydropower Company Pvt. Ltd | Dharan, mob.no. 9852045950, 9812398039; Email: jayalimbu@gmail.com | 27o 22' 23" | 27o 24' 50" | 87o 30' 35" | 87o 33' 38" | Thinglabu, Phakumba, Sanghu, Dhungesaghu (Taplejung) | Survey Lic No: 912 Date: 2074-06-26 |
188 | Madme Khola HPP | 24.000 | Madme Khola | 299 | 2077-03-03 | 2112-03-02 | Madme Khola Hydropower P.Ltd. | Mid Banesor, Kathmandu-34, Kathmandu Somnath Kandel: 9851201536 | 28o 25' 30" | 28o 26' 20" | 84o 07' 04" | 84o 09' 12" | Namarjung (Kaski) | Survey Lic No: 873 Date: 2074-04-15 |
189 | Lower Balephi | 20.000 | Balephi | 300 | 2077-03-05 | 2112-03-04 | Sajha Power Development | Buddanagar-10, Kathmandu | 27o 45' 39" | 27o 48' 23" | 85o 44' 44" | 85o 46' 41" | Batase, Kubhinde, Fulpingkot, Fupingdandagau (Sindhupalchok) | Survey Lic No: 881 Date: 2074-04-25 |
190 | Madya Super Daraundi HPP | 10.000 | Daraundi | 301 | 2077-03-05 | 2112-03-04 | Barpak Daraundi Hydropower Company Pvt. Ltd. | Kathmandu 9, GPO Box: 8643, Phone no 9851173806 | 28o 11' 18" | 28o 13' 22" | 84o 42' 57" | 84o 44' 07" | Ghyalchok (Gorkha) | Survey Lic No: 892 Date: 2074-05-16 |
191 | Rauje Khola HPP | 4.990 | Rauje Khola | 302 | 2077-03-05 | 2112-03-04 | Hydro Connection Pvt Ltd | Latitpur-15, Mahalaxmisthan., phone no 5523784, email connectionhydro@gmail.com | 27o 37' 10" | 27o 38' 47" | 86o 40' 35" | 86o 42' 00" | Takasindu (Solukhumbu) | Survey Lic No: 888 Date: 2074-05-09 |
192 | Bhotekoshi 5 HEP | 62.000 | Bhotekoshi | 303 | 2077-03-14 | 2112-03-13 | Kalika Energy Ltd. | Bharatpur-10, Chitwan, Tel: 056-522440, 520456, PBN 21534; FX 4439155 | 27o 45' 33" | 27o 49' 08" | 85o 51' 49" | 85o 54' 14" | Ramche, Tekanpur, Gati, Barhabise, Maneswor, Mankha (Sindhupalchok) | Survey Lic No: 641 Date: 2069-07-26 |
193 | Seti Khola HPP | 25.000 | Seti Khola | 304 | 2077-03-15 | 2112-03-14 | Vision Lumbini Urja Company Limited. | Butwal-8, Rupandehi, 071-549494, 548464, 9857025140 | 28o 18' 40" | 28o 22' 12" | 83o 57' 15" | 83o 58' 30" | Ghachok, Machhapuchchhre, Purachaur, Sardikhola (Kaski) | Survey Lic No: 803 Date: 2074-01-08 |
194 | Karuwa Seti HEP | 32.000 | Seti | 305 | 2077-03-15 | 2112-03-14 | Jhyamolongma Hydropower Development Company Pvt. Ltd. | kaski, Pokhara, 9849821564, 01-5520254, 5543896, 5012027 | 28o 22' 12" | 28o 24' 30" | 83o 57' 50" | 83o 59' 30" | Machhapuchchhre, Sardikhola (Kaski) | Survey Lic No: 992 Date: 2074-12-25 |
195 | Upper Piluwa 3 HPP | 4.950 | Piluwa Khola | 306 | 2077-04-09 | 2112-04-08 | Mabilung Energy.Ltd | Kathmandu-34, Sachetanmarg New Baneshower, house no. 162, 016922762, 9843142092, 9851150167, mabilungenergy@gmail.com | 27o 17' 42" | 27o 18' 04" | 87o 24' 22" | 87o 25' 30" | Mawadin, Siddhakali (Sankhuwasabha) | Survey Lic No: 942 Date: 2074-07-26 |
196 | Hidi Khola HEP | 6.820 | Hidi Khola | 307 | 2077-04-14 | 2112-04-13 | White Lotus Power Pvt.ltd. | Anamnagar-32, Kathmandu, 9851147724, 9851121726, P.O Box 19820 | 28o 22' 22" | 28o 23' 04" | 84o 29' 12" | 84o 31' 05" | Bhulbhule, Bahundada (Lamjung) | Survey Lic No: 789 Date: 2073-11-24 |
197 | Mid Solu Khola HEP | 9.500 | Solu Khola | 308 | 2077-04-22 | 2112-04-21 | Mid Solu Hydropower company Pvt Ltd | Baneshwor-10, Baburam Acharaya Sadak 1757/70, Kathmandu Contact No. 9751000158, 01-4470584, 9841560491 | 27o 29' 16" | 27o 31' 15" | 86o 34' 00" | 86o 35' 05" | Gora Khami, Salleri (Solukhumbu) | Survey Lic No: 871 Date: 2074-04-06 |
198 | Middle Tadi HPP | 5.500 | Tadi Khola | 310 | 2077-04-27 | 2112-04-26 | Dupcheshwor Mahadev Hydro Company Pvt. Ltd. | Kathmandu-1, House No 271 Situ Plaza, Narayan Chaur; Phone 9851064168( bisam), 4002604 | 27o 57' 30" | 27o 57' 54" | 85o 24' 04" | 85o 25' 09" | Rautbesi, Shikharbesi, Dhyangphedi (Nuwakot) | Survey Lic No: 946 Date: 2074-07-30; |
199 | Pegu Khola Small Hydropower Project | 4.350 | Pegu | 311 | 2077-05-11 | 2112-05-10 | BiguHydropower Venture | Kathmandu, GPOBox 8643, Phone/Fax: 01-4472349, 9843421881 | 27o 49' 22" | 27o 50' 18" | 86o 03' 22" | 86o 04' 59" | Bigu (Dolakha) | Survey Lic No: 709 Date: 2072-09-03 |
200 | Jurimba Khola Small Hydropower Project | 7.630 | Jurimba | 312 | 2077-05-29 | 2112-05-28 | Jurimba Hydropower Company Pvt. Ltd | Minbhawan, Kathmandu | 27o 54' 18" | 27o 55' 28" | 85o 53' 26" | 85o 55' 18" | Listi, Tatopani (Sindhupalchok) | Survey Lic No: 683 Date: 2071-04-15, Revenue Voucher no. 1035350, Rasid no. 12 |
201 | Landruk Modi HEP | 86.590 | Modi | 313 | 2077-06-01 | 2112-05-31 | Annapurna Bidhyut Bikas Company Pvt. Ltd | Koteshwor, Kathmandu, 01-4439152, 4439153 | 28o 24' 10" | 28o 29' 19" | 83o 49' 32" | 83o 53' 52" | Survey Lic No: 1116 Date: 2076-10-22 | |
202 | Sunigad HEP | 11.050 | Suni Gad | 314 | 2077-06-07 | 2112-06-06 | Omega EnergyDeveloper Pvt. Ltd | Chandole -4, Kathmandu, omegaenergy73@gmail.com, 01-4436184 | 29o 36' 10" | 29o 40' 00" | 81o 11' 46" | 81o 14' 16" | Sunikot (Bajhang) | Survey Lic No: 832 Date: 2074-02-10 |
203 | Mid Rawa Khola HEP | 2.500 | Rawa Khola, Sung Khola | 315 | 2077-06-07 | 2112-06-06 | Halesi Urja Pvt. Ltd. , Anamnagar, Kathmandu, Tel: 5538632, 9851088040 | Anamnagar, Kathmandu | 27o 20' 24" | 27o 21' 04" | 86o 49' 05" | 86o 50' 53" | Baksila, Rakha Bangdel (Khotang) | Survey Lic No: 842 Date: 2074-02-26 |
204 | Dudhkoshi-2 (Jaleswar) HPP | 70.000 | Dudh Koshi | 316 | 2077-06-07 | 2112-06-06 | Dudhkoshi Hydropower Nepal Pvt Ltd | Jitjung Marg, Thapathali , Kathmandu, GPO Box: 7301. Tel: 4241001 | 27o 23' 52" | 27o 26' 30" | 86o 40' 00" | 86o 43' 36" | Deusa, Kagel, Jubu, Lokhim, Mukali, Necha Batase (Solukhumbu) | Survey Lic No: 548 Date: 2067-01-16 |
205 | Mudi Khola Hydropower Project | 14.700 | Mudi Khola | 318 | 2077-06-13 | 2112-06-12 | Everest Energy and Infrastructure Fund Pvt. Ltd. | Charkhal Road, Dillibazar, Kathmandu-33, Tel: 01-4432864, 9851163167, Email: neupanes.ram@gmail.com | 28o 31' 19" | 28o 34' 00" | 83o 19' 22" | 83o 21' 44" | Mudi (Myagdi) | Survey Lic No: 870 Date: 2074-04-06 |
206 | Lower Mid Rawa Khola HEP | 4.000 | Rawa | 319 | 2077-06-15 | 2112-06-14 | Lower Mid Rawa Khola Hydropower ProjectPvt. Ltd | Ka. Ma.Pa-9, Tel: 9851132735, Email: gspghimire@gmail.com | 27o 20' 03" | 27o 21' 00" | 86o 46' 49" | 86o 49' 00" | Rakha Bangdel, Sapteswor (Khotang) | Survey Lic No: 997 Date: 2074-12-29 |
207 | Menchet Khola HPP | 7.000 | Menchet Khola | 320 | 2077-06-18 | 2112-08617-0 | Ruby Valley Hydropower Com.Ltd. | Kathmandu-11, Babarmahal, 4222934, 9849920987 | 28o 11' 00" | 28o 11' 43" | 85o 04' 45" | 85o 06' 37" | Sirtung, Tipling (Dhading) | Survey Lic No: 753 Date: 2073-08-03 |
208 | Tamor Mewa | 128.000 | Tamor & Mewa | 322 | 2077-06-25 | 2112-06-24 | Spark Hydroelectric Co. Ltd. | Gyaneshwor P.O. Box. 20832, Kathmandu-33, Tel: 015902484, 9851247645 | 27o 20' 00" | 27o 24' 08" | 87o 37' 15" | 87o 40' 00" | Khokling, Phungling (Taplejung) | Survey Lic No: 675 Date: 2070-11-22; Phungling Mun, Mikwakhola, Meringden and Atharai-Tribeni RM |
209 | Midim 1 HEP | 13.424 | Midim Khola | 323 | 2077-07-03 | 2112-07-02 | Mount Rasuwa Hydropower Pvt. Ltd. | Tokha 10 Kathmandu, 9851254876, 014-354367 | 28o 14' 10" | 28o 17' 55" | 84o 15' 00" | 84o 18' 00" | Bhujung, Bhoje, Maling, Uttarkanya (Lamjung) | Survey Lic No: 824 Date: 2074-02-10 |
210 | Lower Tara Khola HPP | 3.500 | Tara Khola | 325 | 2077-07-18 | 2112-07-17 | Pahadi Hydropower company Pvt Ltd | Banglung Municipality-2, Baglung Nepal, Tel: 068-520221 | 28o 17' 53" | 28o 19' 29" | 83o 24' 16" | 83o 25' 00" | Tara (Baglung) | Survey Lic No: 656 Date: 2070-02-02 |
211 | Myagdi Khola Hydropower Project | 57.300 | Myagdi Khola | 326 | 2077-07-25 | 2112-07-24 | Hydro Village Pvt. Ltd. | Lalitpur-22, Jwagal.POBox 4256. , 015199073, 9851050406, shshil@sushmitgroup.com, sushil.hyvillage@gmail.com | 28o 34' 18" | 28o 37' 49" | 83o 21' 50" | 83o 25' 00" | Mudi (Myagdi) | Survey Lic No: 694 Date: 2071-10-04 |
212 | Upper Bhurundi Khola SHP | 3.750 | Bhurundi Khola | 327 | 2077-07-27 | 2112-07-26 | Ambe Hydropower Pvt. Ltd, | Kathmandu, Tel: 01-4117979 | 28o 19' 30" | 28o 20' 35" | 83o 44' 20" | 83o 45' 00" | Dangsing (Kaski) | Survey Lic No: 733 Date: 2073-04-07 |
213 | Nyasim HEP | 35.000 | Nyasem Khola | 328 | 2077-07-28 | 2112-07-27 | Sita Hydropower Company Pvt. Ltd. | Kalimati, Kathmandu-13, Contact No. 01-4272426, 4274937, 4372442, 9851194065 Sitaram Timalsina | 27o 57' 30" | 27o 59' 30" | 85o 47' 30" | 85o 49' 30" | Gumba (Sindhupalchok) | Survey Lic No: 802 Date: 2074-01-08 |
214 | Upper Ingwa Khola | 9.700 | Ingwa | 329 | 2077-07-28 | 2112-07-27 | Ingwa Hydopower Pvt. Ltd., | P.O.Box No 24697, Trade Tower, Thapathali, Kathmandu, phone 01-5111015, 5111016, 9801147131 | 27o 16' 46" | 27o 17' 20" | 87o 52' 22" | 87o 55' 20" | (Taplejung) | Survey Lic No: 71 Date: 2069-05-29 |
215 | Upper Daraudi Hydropower Project | 9.200 | Daraudi | 330 | 2077-08-14 | 2112-08-13 | Green Gorkha Energy Limited | Kath 23, Charkhal, greengorkhaenergy@gmail.com; 9851163169 | 28o 08' 36" | 28o 11' 18" | 84o 41' 52" | 84o 43' 23" | Ghyalchok, Simjung, Saurpani (Gorkha) | Survey Lic No: 797 Date: 2073-12-21;jirkot & sulikot RM |
216 | Langdi Khola Small HEP | 3.260 | Langdi | 331 | 2077-08-29 | 2112-08-28 | Ujyalo Nepal Hydro Pvt. Ltd. | Katmandu-10, Email: Ujyalo.nepal.hydro@gmail.com, Phone: 9851120563, 9841540132; | 28o 10' 05" | 28o 11' 54" | 84o 35' 00" | 84o 37' 00" | Hanspur (Gorkha) Ilampokhari, Bichaur (Lamjung) | Survey Lic No: 865 Date: 2074-03-23 |
217 | Setikhola HEP | 22.000 | Seti Khola | 334 | 2077-09-02 | 2112-09-01 | Setikhola Hydropower Pvt.Ltd. | Kantipath, Kathmandu .PO Box 26153, Tel: 4232229, setkhola@gmail.com | 28o 05' 20" | 28o 08' 05" | 84o 04' 15" | 84o 05' 28" | Bharatpokhari, Lekhnath (Kaski) | Survey Lic No: 775 Date: 2073-09-03 |