Sano Gaucharan, Kathmandu, Nepal     (977-1-) 4434119      (977-1-) 5244257     info@doed.gov.np

GON Ongoing Projects :: Under Study Projects

Updated on - Apr 13, 2021

S No Project Capacity (MW) River Latitiude N Longitude E VDC/District Remarks
1 Arun 4 372.000 Arun 27o 35' 00" 27o 40' 18" 87o 18' 15" 87o 22' 45" Hatiya, Num, Pathibhara, Pawakhola (Sankhuwasabha) Feasibility Study by DOED
2 Beni Kaligandaki 50.000 Kali Gandaki 28o 18' 15" 28o 22' 00" 83o 33' 50" 83o 36' 30" Malika (Baglung) Ratnechaur, Jyamrukot, Dhatan, Arthunge (Myagdi) Mallaj, Salija, Dhairing (Parbat) Feasibility Study started from FY 2071/72
3 Bharbung HEP 512.000 Burbang 28o 51' 15" 28o 55' 45" 83o 02' 30" 83o 18' 10" (Dolpa) changed status to GON- Basket on 2073-12-08
4 Bhimdang Khola 32.000 Bimdang 28o 33' 17" 28o 38' 00" 84o 25' 45" 84o 28' 00" (Manang) Reserved for Nepal Army decision date: 2073-11-12 from MoEN
5 Budhi Ganga Small 6.200 Budhi Ganga 29o 20' 30" 29o 24' 00" 81o 19' 15" 81o 23' 45" (Bajura) Detailed Engineering Design started from FY 2072/73
6 Chameliya 60.000 Chameliya Khola 29o 51' 30" 29o 54' 30" 80o 53' 43" 80o 57' 30" (Darchula) changed status to GON- Basket on 2074-09-14
7 Chyadu Khola 2.000 Chyadu Khola 27o 56' 10" 27o 57' 47" 86o 11' 11" 86o 12' 27" (Dolakha)
8 Dadagau Khalanga Bheri HEP 128.000 Bheri 28o 42' 15" 28o 46' 30" 82o 15' 00" 82o 17' 44" Khalanga, Dandagaun (Jajarkot) Aathbis Danda, Ghetma, Garayala, Purtim Kanda (Rukum) changed status to GON- Basket on 2077-10-20 (Decision Date : 2076-03-17 Old Lic No 806 of Gezhouba Group Power Investment Nepal Pvt. Ltd.)
9 Ghunsa Khola 78.000 Ghunsa Khola 27o 39' 30" 27o 55' 25" 87o 48' 20" 88o 22' 15" (Taplejung) Detailed Engineering Study
10 Humla Karnali-Cascade 916.000 Karnali 29o 52' 48" 30o 07' 15" 81o 30' 00" 81o 53' 26" (Humla) changed status to GON- Basket on 2077-10-20
11 Jugada Budhiganga HPP 15.430 Budhi Ganga 29o 24' 00" 29o 28' 30" 81o 23' 45" 81o 28' 27" Budhiganga HPP has reserved this HPP
12 Kaligandaki 2 Storage HEP 477.000 Kaligandaki 27o 47' 04" 27o 55' 40" 83o 37' 20" 84o 19' 24" GoN Under Study as per decision date of 2077/10/20 and 2077/11/25
13 Kaligandaki Storage HEP 844.000 Kaligandaki 28o 00' 00" 28o 17' 30" 83o 32' 00" 83o 43' 30"
14 Kankai Multipurpose Project 90.000 Kankai 26o 40' 30" 26o 49' 36" 87o 45' 49" 87o 55' 42"
15 Khimti Shivalaya Storage HPP 1720.000 Khimti Khola 27o 28' 28" 27o 39' 23" 86o 06' 00" 86o 20' 15"
16 Kokhajor Storage HEP 110.000 Kokhajor Khola 27o 15' 48" 27o 22' 05" 85o 25' 45" 85o 37' 40" Kapilakot, Mahendrajhayadi (Sindhuli)
17 Kwadi Khola 1 15.000 Kawadi Khola 29o 41' 35" 29o 44' 59" 81o 41' 00" 81o 45' 00"
18 Lohare River-1 Storage Hydropower Project 81.000 Lohare Khola 28o 43' 13" 28o 53' 41" 81o 35' 00" 81o 48' 09"
19 Loti Karnali (Darma) 49.500 Darma Khola 29o 45' 00" 29o 48' 45" 82o 03' 45" 82o 05' 30" Mimi (Humla) Feasibility Study by DOED
20 Lower Arun 470.000 Arun 27o 21' 51" 27o 30' 00" 87o 07' 30" 87o 12' 30" (Sankhuwasabha) EOI for Feasibilty Study started(Decision Date : 2071-06-22, Old Lic No 73 - Lower Arun HPL)
21 Lower Badigad Storage HEP 350.000 Badigad 27o 57' 00" 28o 11' 00" 83o 16' 00" 83o 29' 25" GoN Under Study as per decision date of 2077/10/20 and 2077/11/25
22 Lower Chameliya 19.280 Chameliya Khola 29o 40' 00" 29o 41' 40" 80o 34' 21" 80o 37' 59" (Darchula) Feasibility Study started from FY 2071/72
23 Marshyangdi 3 HEP 42.000 Marshyangdi 28o 05' 27" 28o 08' 09" 84o 25' 39" 84o 27' 30" GoN Under Study as per decision date of 2077/10/20 and 2077/11/25
24 Middle Inkhu Khola 25.300 Inkhu 27o 31' 30" 27o 34' 00" 86o 45' 30" 86o 47' 00" (Solukhumbu) Desk study by DOED from fiscal year 2073/74
25 Mugu Karnali HEP 100.000 Mugu karnali 29o 31' 21" 29o 36' 06" 82o 06' 46" 82o 13' 45" GoN Under Study as per decision date of 2077/10/20 and 2077/11/25
26 Nagmati Reservoir HEP 2.120 Nagmati 27o 45' 00" 27o 47' 30" 85o 25' 00" 85o 27' 30" Under Study : Ministry of Irrigation
27 Naumure Storage Project 377.000 west rapti 27o 46' 06" 28o 00' 53" 82o 45' 00" 83o 02' 30" Letter dated 2073-8-8 (ch no 643 study division)
28 Saru Khola HPP 15.000 Saru Khola 28o 45' 20" 28o 51' 18" 82o 03' 47" 82o 10' 00" Cordinate ammended as per 2074-07-23 decision
29 Sharada Babai Storage HPP 93.000 Sharada 28o 15' 00" 28o 20' 00" 82o 00' 00" 82o 07' 30"
30 SR-06 Storage 276.000 West Seti 28o 58' 00" 29o 16' 00" 80o 55' 30" 81o 12' 30" Feasibility Study by DOED
31 Sunkoshi 2 1116.000 Sun Koshi 27o 13' 30" 27o 29' 30" 85o 47' 30" 86o 10' 20" Feasibility Study started from FY 2072/73
32 Sunkoshi 3 536.000 Sun Koshi 27o 29' 00" 27o 45' 30" 85o 35' 55" 85o 50' 00" Feasibility Study started from FY 2072/73
33 Super Budhigandaki HEP 52.000 Budhigandaki 28o 33' 30" 28o 35' 00" 84o 41' 50" 84o 45' 00" Samagaun (Gorkha) changed status to GON- Basket on 2077-10-20 (Decision Date : 2076-10-17 Old Lic No 929 of Natural Hydro Nepal Pvt. Ltd)
34 Tila HEP 35.000 Tila 29o 07' 28" 29o 14' 57" 81o 52' 00" 81o 58' 40"
35 Tom Dogar(Budhigandaki) HEP 43.520 Budhigandaki 28o 29' 16" 28o 30' 37" 84o 50' 52" 84o 52' 40" GoN Under Study as per decision date of 2077/10/20 and 2077/11/25
36 Upper Arun 335.000 Arun 27o 38' 24" 27o 48' 09" 87o 20' 00" 87o 30' 00" Chepuwa, Hatiya (Sankhuwasabha) being studied by NEA under IDA assistance
37 Upper Hongu HEP 38.000 Hongu 27o 34' 40" 27o 36' 42" 86o 53' 39" 86o 55' 22" GoN Under Study as per decision date of 2077/10/20 and 2077/11/25
38 Upper Jhimruk Storage Project 100.000 Jhimruk 28o 07' 30" 28o 12' 30" 82o 52' 30" 83o 00' 00" As per Letter dated 2073-08-08 (Ch no 642, study division)
39 Yanma Khola 64.000 Yangma Khola 27o 39' 00" 27o 41' 31" 87o 47' 52" 87o 50' 00" (Taplejung) changed status to GON- Basket on 2074-09-14 (Area revised decision date 2076-11-30)
Total capacity for 39 projects = 9647.35 MW