Application for Survey License :: Transmission Line
Updated on - July 16, 2026
| S No | Project | Voltage (kV) |
Line Length (km) | Capacity (MW) | Appn No | Appn Date | Promoter |
Address | Start Point |
End Point |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Padam Khola HEP Transmission Line Project | 33 | 17 | 12.55 | 7026 | 2079-12-27 | Dolti Power Company Ltd. | Thapagaun Kathmandu | Switchyard of Project | NEA Dailekh S/S |
| 2 | Grid Connected Butwal Solar Project 33kV Transmission Line Project | 33 | 7.5 | 8.5 | 7270 | 2081-03-05 | Ridi Power Company Ltd. | Trade Tower, Thapathali, Kathmandu | switchyard of the project | NEA Amuwa S/S |
| 3 | Upper Madi 0 -Upper Madi HPPSwitchyard Transmission Line Project | 132 | 14.6 | 43 | 1709 | 2082-05-19 | Annapurna Power Company Limited | Kathmandu-14 | Respective Switchyard of the project | Switchyard of Upper Madi HPP-LiLO at Mad |
| 4 | Thuligad HPP- Pahalmanpur s/s 33kV Transmission Line project | 33 | 14 | 17 | 2468 | 2082-06-29 | Om Power Company P.Ltd | Chandragiri,Kathamandu | Respective Switchyard of the project | Pahalmanpur s/s |
| 5 | Dobhan Khola HPP-Borang s/s 132kV Transmission Line Project | 132 | 26.3 | 24.5 | 3739 | 2082-08-14 | Dhobhan Khola Hydropower Limited | Chandol,kathmandu | Respective Switchyard of the project | Borang s/s |
| 6 | Mathillo Seti HPP 132 kV Transmission Line Project | 132 | 5 | 20 | 4357 | 2082-09-03 | Upper Seti Hydro Limited | Anamnagar, Kathmandu | Switchyard of Mathillo Seti HPP | Switchyard of Karuwa Seti HPP |
| 7 | Barpak-Kerabari 132kV Transmission Line Project | 132 | 16 | 95.4 | 6180 | 2082-11-01 | Barpak-Kerabari Transmission Line P.Ltd | Nagarjuna,kathmandu | Barpak s/s | Kerabari s/s |
| 8 | Pegu Khola small HPP 33kV Transmission Line Project | 33 | 2 | 5 | 7068 | 2082-12-05 | Bigu Hydro Venture Pvt.Ltd | Battisputali,Kathmandu | Respective Switchyard of the project | Sagu Khola Switchyard |
| 9 | Mathillo Sagu HPP 33kV Transmission Line Project | 33 | 1.98 | 10 | 7069 | 2082-12-05 | Alampu Jalabidhyut Bikas Company P.Ltd | Battisputali | Respective Switchyard of the project | Sagu Khola-1 Switchyard |
| 10 | Tumcha -Dododhara 400kV Transmission Line Project | 400 | 171 | 1400 | 8233 | 2083-01-04 | Karnali Grid Pvt.Ltd | Kantipath,Kathmandu | Karnali-1 HPP switchyard | Dododhara s/s |
| 11 | Betan -Maintada 400kV Transmission Line Project | 400 | 84 | 4400 | 8780 | 2083-01-15 | Nepal Electricity Authority | Durbar Marg, Kathmandu 01-4153007 | Betan hub | Maintada s/s |
| 12 | Sarbottam Steels-Solar PV 33kV Transmission Line Project | 33 | 2.97 | 33 | 9246 | 2083-01-28 | Energy Management Pvt.Ltd | Neupane Tower,Kathmandu | Respective Switchyard of the project | Sarbottam Steels |
| 13 | Seti Nadi-3 HPP- Kailash 132 kV Transmission Line Project | 132 | 9.3 | 86.211 | 9828 | 2083-02-11 | Chilime Seti Hydropower Company Limited | kapan Marg | Respective Switchyard of the project | kailash s/s |
| 14 | Super Seti HPP-Upper Seti HPP 132 kV Transmission Line Project | 132 | 3.6 | 24 | 10588 | 2083-03-02 | S.N Energy Limited | Gyaneshwor,kathmandu | Respective Switchyard of the project | Upper Seti HPPSwitchyard |
| 15 | Grid Connected Solar - Khungri 132 kV Transmission Line Project | 132 | 2.4 | 50 | 11411 | 2083-03-19 | Rapti Urja P.Ltd | Baneshwor-10,Kathmandu | Respective Switchyard of the project | Khungri s/s |
| 16 | Phalakhu Khola HPP -Trishuli 3B hub 33kV Transmission Line Project | 33 | 12 | 7.29 | 11692 | 2083-03-30 | Rasuwa Hydropower Limited | Samakhusi-26,Kathmandu | Respective Switchyard of the project | Trishuli 3B Hub Station |
| 17 | Bajhang Mathillo Seti HPP- Chainpur Seti HPP 220 kV Transmission Line Project | 220 | 22 | 216 | 11787 | 2083-03-31 | Samriddhi Energy Ltd. | Anamnagar,Kathmandu | Respective Switchyard of the project | Chainpur Seti HPP Switchyard |