Application for Survey License :: Transmission Line

Updated on - July 16, 2026

S No Project Voltage (kV)
Line Length (km) Capacity (MW) Appn No Appn Date Promoter
Address Start Point
End Point
1 Padam Khola HEP Transmission Line Project 33 17 12.55 7026 2079-12-27 Dolti Power Company Ltd. Thapagaun Kathmandu Switchyard of Project NEA Dailekh S/S
2 Grid Connected Butwal Solar Project 33kV Transmission Line Project 33 7.5 8.5 7270 2081-03-05 Ridi Power Company Ltd. Trade Tower, Thapathali, Kathmandu switchyard of the project NEA Amuwa S/S
3 Upper Madi 0 -Upper Madi HPPSwitchyard Transmission Line Project 132 14.6 43 1709 2082-05-19 Annapurna Power Company Limited Kathmandu-14 Respective Switchyard of the project Switchyard of Upper Madi HPP-LiLO at Mad
4 Thuligad HPP- Pahalmanpur s/s 33kV Transmission Line project 33 14 17 2468 2082-06-29 Om Power Company P.Ltd Chandragiri,Kathamandu Respective Switchyard of the project Pahalmanpur s/s
5 Dobhan Khola HPP-Borang s/s 132kV Transmission Line Project 132 26.3 24.5 3739 2082-08-14 Dhobhan Khola Hydropower Limited Chandol,kathmandu Respective Switchyard of the project Borang s/s
6 Mathillo Seti HPP 132 kV Transmission Line Project 132 5 20 4357 2082-09-03 Upper Seti Hydro Limited Anamnagar, Kathmandu Switchyard of Mathillo Seti HPP Switchyard of Karuwa Seti HPP
7 Barpak-Kerabari 132kV Transmission Line Project 132 16 95.4 6180 2082-11-01 Barpak-Kerabari Transmission Line P.Ltd Nagarjuna,kathmandu Barpak s/s Kerabari s/s
8 Pegu Khola small HPP 33kV Transmission Line Project 33 2 5 7068 2082-12-05 Bigu Hydro Venture Pvt.Ltd Battisputali,Kathmandu Respective Switchyard of the project Sagu Khola Switchyard
9 Mathillo Sagu HPP 33kV Transmission Line Project 33 1.98 10 7069 2082-12-05 Alampu Jalabidhyut Bikas Company P.Ltd Battisputali Respective Switchyard of the project Sagu Khola-1 Switchyard
10 Tumcha -Dododhara 400kV Transmission Line Project 400 171 1400 8233 2083-01-04 Karnali Grid Pvt.Ltd Kantipath,Kathmandu Karnali-1 HPP switchyard Dododhara s/s
11 Betan -Maintada 400kV Transmission Line Project 400 84 4400 8780 2083-01-15 Nepal Electricity Authority Durbar Marg, Kathmandu 01-4153007 Betan hub Maintada s/s
12 Sarbottam Steels-Solar PV 33kV Transmission Line Project 33 2.97 33 9246 2083-01-28 Energy Management Pvt.Ltd Neupane Tower,Kathmandu Respective Switchyard of the project Sarbottam Steels
13 Seti Nadi-3 HPP- Kailash 132 kV Transmission Line Project 132 9.3 86.211 9828 2083-02-11 Chilime Seti Hydropower Company Limited kapan Marg Respective Switchyard of the project kailash s/s
14 Super Seti HPP-Upper Seti HPP 132 kV Transmission Line Project 132 3.6 24 10588 2083-03-02 S.N Energy Limited Gyaneshwor,kathmandu Respective Switchyard of the project Upper Seti HPPSwitchyard
15 Grid Connected Solar - Khungri 132 kV Transmission Line Project 132 2.4 50 11411 2083-03-19 Rapti Urja P.Ltd Baneshwor-10,Kathmandu Respective Switchyard of the project Khungri s/s
16 Phalakhu Khola HPP -Trishuli 3B hub 33kV Transmission Line Project 33 12 7.29 11692 2083-03-30 Rasuwa Hydropower Limited Samakhusi-26,Kathmandu Respective Switchyard of the project Trishuli 3B Hub Station
17 Bajhang Mathillo Seti HPP- Chainpur Seti HPP 220 kV Transmission Line Project 220 22 216 11787 2083-03-31 Samriddhi Energy Ltd. Anamnagar,Kathmandu Respective Switchyard of the project Chainpur Seti HPP Switchyard